Question

From the last question.... You are an experienced machinist with a small tool shop. You have...

From the last question.... You are an experienced machinist with a small tool shop. You have been asked to submit a bid to produce twelve (12) special clamps for a new die that is under construction. You estimate that the material costs (metal and fasteners) for each clamp are $150.00. You also estimate that 9.49 labor hours are needed to produce the first clamp. The value of your labor is $50/hour.

Your potential customer is receptive to your bid from the previous question, but is hesitant to award you the order because the average price per clamp that you bid is 5% higher than his target price. You respond to the customer that if they would increase their order from 12 clamps to x clamps, you could beat his target price. Find x. What is your new AVERAGE PRICE PER CLAMP ?

PREVIOUS QUESTION BELOW:

You are an experienced machinist with a small tool shop. You have been asked to submit a bid to produce 12 special clamps for a new die that is under construction. You estimate that the material costs (metal and fasteners) for each clamp are $150.00. You also estimate that 9.49 labor hours are needed to produce the first clamp. The value of your labor is $50/hour.

From similar orders in the past, you estimate that there is a 90% learning curve for this type of work. Using this information, what is the lowest total bid you should submit if you charge a 25% markup on material and you wish to recoup your labor costs? (Hint: set up formulas in Excel - this is a long problem).

Round your answer to 2 decimal places and DO NOT include the $ sign or a comma. For example, answer 4567.89 and NOT $4,567.89

Expert Answer

Time for 1st unit = 9.49 hours

Learning curve = 90%

Total Time for nth unit = Time for 1st unit*Total factor for 90% Learning curve

Total time for 12 units = 9.49*9.374 = 88.96 hours

Labor cost for 12 units = Total time*Labor rate = 88.96*50 = 4447.96 $

Material cost per unit = 150 $

Material cost for 12 units = 150*12 = 1800 $

Mark up of 25% on Material cost increases Total Material cost to = 1800*(1+25%) = 2250 $

Bidding price = Labor cost + Material cost post mark up = 4447.96 + 2250 = 6697.96

Ans = 6697.96

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Time for 1st unit = 9.49 hours

Learning curve = 90%

Total Time for nth unit = Time for 1st unit*Total factor for 90% Learning curve

Total time for 12 units = 9.49*9.374 = 88.96 hours

Labor cost for 12 units = Total time*Labor rate = 88.96*50 = 4447.96 $

Material cost per unit = 150 $

Material cost for 12 units = 150*12 = 1800 $

Mark up of 25% on Material cost increases Total Material cost to = 1800*(1+25%) = 2250 $

Bidding price = Labor cost + Material cost post mark up = 4447.96 + 2250 = 6697.96

Ans = 6697.96

Add a comment
Know the answer?
Add Answer to:
From the last question.... You are an experienced machinist with a small tool shop. You have...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • _NEED EXCEL PLEASE! You are an experienced machinist with a small tool shop. You have been...

    _NEED EXCEL PLEASE! You are an experienced machinist with a small tool shop. You have been asked to submit a bid to produce twelve (12) special clamps for a new die that is under construction. You estimate that the material costs (metal and fasteners) for each clamp are $150.00. You also estimate that 10.00 labor hours are needed to produce the first clamp. The value of your labor is $50/hour. From similar orders in the past, you estimate that there...

  • _NEED EXCEL PLEASE! You are an experienced machinist with a small tool shop. You have been asked...

    _NEED EXCEL PLEASE! You are an experienced machinist with a small tool shop. You have been asked to submit a bid to produce twelve (12) special clamps for a new die that is under construction. You estimate that the material costs (metal and fasteners) for each clamp are $150.00. You also estimate that 10.00 labor hours are needed to produce the first clamp. The value of your labor is $50/hour. From similar orders in the past, you estimate that there...

  • You own a workshop that produces custom handmade frames for diplomas. You are negotiating a contract...

    You own a workshop that produces custom handmade frames for diplomas. You are negotiating a contract with Loyola to sell the frames at the bookstore. Loyola decided to offer a trial contract where they will stock 20 frames at the bookstore. You estimate that the material costs for each frame is $15. You also estimate that it takes your employee 15 labor hours to produce the first frame. You pay your employee $25 per hour. Based on your observations, you...

  • 2. You own a workshop that produces custom handmade frames for diplomas. You are negotiating a...

    2. You own a workshop that produces custom handmade frames for diplomas. You are negotiating a contract with Loyola to sell the frames at the bookstore. Loyola decided to offer a trial contract where they will stock 20 frames at the bookstore. You estimate that the material costs for each frame is $15.00. You also estimate that it takes your employee 15 labor hours to produce the first frame. You pay your employee $25 per hour. Your initial bid accounted...

  • The following data has been provided by your manufacturing department to estimate the standard cost of...

    The following data has been provided by your manufacturing department to estimate the standard cost of producing a particular product. Direct Labor - $20 per hour. The first unit took 0.6 hours of direct labor but you want to base the cost estimate on the number of hours needed for the 25th unit. You expect a 75% learning curve to apply to the direct labor hours. Overhead-50% of Direct Labor Material $43.75 per 25 units What is your estimate of...

  • The Pacific Boat Company, which is under contract to the U.S. Navy, assembles troop deployment boats....

    The Pacific Boat Company, which is under contract to the U.S. Navy, assembles troop deployment boats. As part of its research program, it completes the assem of the first of a new model (PT109) of deployment boats. The Navy is impressed with the PT109. It requests that Pacific Boat submit a proposal on the cost of producing another six PT 109s Pacific Boat reports the following cost information for the first PT 109 assembled. Pacific Boat uses a 90% incremental...

  • 7. (16 points) Estimate the cost of a new product give the following information: Material required...

    7. (16 points) Estimate the cost of a new product give the following information: Material required to make the product includes 4 total parts-2 A's, 1 B and 1 C. Part Quantity Per Price per Part matedol Costs $9 (9x2)+7+12 43 $7 $18 Labor: Estimate the labor required to make the 20 unit. The product has a 80% learning curve. The time it took to build the first unit was 40 minutes. Labor cost $16/hour. Overhead is 140% of Material...

  • It took MegaTech, Inc. 200,000 labor-hours to produce the first of several oil drilling rigs for...

    It took MegaTech, Inc. 200,000 labor-hours to produce the first of several oil drilling rigs for Antarctic exploration. Your company, Natural Resources, Inc. has agreed to purchase the fifth oil drilling rig from their manufacturing yard. Assume that MegaTech experiences a learning rate of 75%. At a labor rate of $38 per hour, what should you, as the purchasing agent expect to pay for the fifth unit? TN = T1C, Where TN = Time needed to produce the Nth unit...

  • The Speedy Wind Turbine Company (SWTC) won a bid to build ten wind turbines sold to...

    The Speedy Wind Turbine Company (SWTC) won a bid to build ten wind turbines sold to a long time loyal customer. The fourth wind turbine was completed in 600 hours. The crew working on the project have demonstrated a 75% learning curve. a. How long should it take the same crew to finish the last six turbines? (5 points) b. There are 4 crewmembers working on the project. The average labor cost per hour per crewmember, including health benefits and...

  • Answer the question The costs of manufacturing horizontal fixed-mount barcode scanners are as follows: Cost Element...

    Answer the question The costs of manufacturing horizontal fixed-mount barcode scanners are as follows: Cost Elements Cost Rate Direct labor $25 per hour Material $380 per unit Overhead costs 50% of direct labor The production has a 79% learning curve applied to labor required, and the time to complete the first unit wa 40 direct labor hours. Determine the unit selling price based on the estimated time to complete the 100th uni if the company wants to make a profit...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT