To test whether the mean time to mix a batch of adhesive is the same for machines produced by four manufacturers, TiteBondMax obtained DATA on the time (minutes) needed to mix the materials. Test whether the machines have equal mean mixing time at α=0.01.
Manufacturer | |||
A | B | C | D |
25 | 23 | 25 | 22 |
23 | 21 | 25 | 23 |
21 | 23 | 25 | 23 |
23 | 24 | 21 | 22 |
Please help to select one of the following options:
The pvalue 0.0001 is extreme evidence that the machines are not all the same.
The data provide insignificant evidence against H0: Equal means at pvalue 0.514. The machine are considered equal.
The data provide weak evidence against H0: Equal means at pvalue 0.072. Equality of means remains plausible.
The data provide extreme evidence against H0: Equal means at pvalue 0.001. The mixing machines are not all equal.
The data provide strong evidence against H0: Equal means at pvalue 0.013. The mixing machines are not all equal.
None of the answers are correct.
Applying one way ANOVA:
Source of Variation | SS | df | MS | F | P-value |
Between Groups | 5.1875 | 3 | 1.7292 | 0.8058 | 0.5145 |
Within Groups | 25.75 | 12 | 2.1458 | ||
Total | 30.9375 | 15 |
The data provide insignificant evidence against H0: Equal means at pvalue 0.514. The machine are considered equal.
To test whether the mean time to mix a batch of adhesive is the same for...
To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, a chemical company obtained the following data on the time (in minutes) needed to mix the material. Manufacturer 1 2 3 21 27 19 26 27 19 23 31 23 26 23 23 (a) Use these data to test whether the population mean times for mixing a batch of material differ for the three manufacturers. Use α =...
To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, a chemical company obtained the following data on the time (in minutes) needed to mix the material. Manufacturer 1 2 3 20 28 20 25 25 18 24 32 24 27 27 18 (a) Use these data to test whether the population mean times for mixing a batch of material differ for the three manufacturers. Use α =...
To test whethoer the mean time needed to mix a batch of materlal is the same for machines produced by three manufacturers, a chemical company obtained the follewing data on the time (is misutes) needed to mix the material Manufacturer 1 2 3 19 28 19 27 26 20 23 32 23 23 30 (a) Use these data to test whether the population mean times for mbing a batch of material differ for the three manufacturers. Use e0.05 State the...
To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, the Jacobs Chemical Company obtained the following data on the time (in minutes) needed to mix the material 25 31 29 27 Manufacturer 2 31 29 34 30 17 16 20 19 a. Use these data to test whether the population mean times for mixing a batch of material differ for the three manufacturers. Use α .05 Compute...
To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, the Jacobs Chemical Company obtained the following data on the time (in minutes) needed to mix the material. Manufacturer 1 2 3 21 27 24 27 24 18 24 30 24 18 24 21 Use these data to test whether the population mean times for mixing a batch of material differ for the three manufacturers. Use = .05....
To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, the Jacobs Chemical Company obtained the following data on the time (in minutes) needed to mix the material Manufacturer 2 3 27 21 21 25 19 a. Use these data to test whether the population mean times for mixing a batch of material differ for the three manufacturers. Use α = .05 the values below (to 2 decimals,...
To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, the Jacobs Chemical Company obtained the following data on the time (in minutes) needed to mix the material. Manufacture 18 24 21 21 27 27 24 21 27 18 a. Compute the values below (to 2 decimals, if necessary). Sum of Squares, Error Mean Squares, Error Fishers LSD Value b. Use Fisher's LSD procedure to develop a 95%...
To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, the Jacobs Chemical Company obtained the following data on the time (in minutes) needed to mix the material. Manufacture 1 2 3 18 27 24 27 24 18 21 33 24 18 27 21 a. Compute the values below (to 2 decimals, if necessary). Sum of Squares, Error Mean Squares, Error Fisher's LSD Value b. Use Fisher's LSD...
To test whether the mean time needed to mix a batch af material is the same for machines produced by three manufacturers, the Jacobs Chemical Company obtained the following data on the time (in minutes) needed to mix the material use these data to test whether the pptation mean times for moing a batch d material difrir Compute the values belaw (to 2 decma's, necessary) Sum of Squares, Treatment |-78 Sum of Squares, Error Moan Squares, Treatment39 Moan Squares, Error...
eBook Video To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, the Jacobs Chemical Company obtained the following data on the time (in minutes) needed to mix the material. Manufacturer 1 2 3 20 28 20 26 26 19 24 31 23 22 27 22 Use Fisher's LSD procedure to develop a 95% confidence interval estimate of the difference between the means for manufacturer 1 and manufacturer...