Question

A cylindrical riser is to be designed for a sand casting mold. The length of the...

A cylindrical riser is to be designed for a sand casting mold. The length of the cylinder is 1.25 its diameter .

The casting is a square plate, each side =10 in and thickness=.75 in . If the metal is Cast Iron, and the mold constant is 16.00 min/in^2 in chvorinov's rule, determine the dimensions of the riser so that it will take (40%) longer time for the riser to solidify.

Can you show where the 40% is incorporated into the solution.

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
A cylindrical riser is to be designed for a sand casting mold. The length of the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • . In casting experiments performed using a certain alloy and type of sand mold, it took...

    . In casting experiments performed using a certain alloy and type of sand mold, it took 170 sec for a cube-shaped casting to solidify. The cube was 50 mm on a side. (a) Determine the value of the mold constant in Chvorinov's rule. (b) If the same alloy and mold type were used, find the total solidification time for a cylindrical casting in which the diameter 50 mm and length- 50 mm. Page 6 of 12 1.13. The housing for...

  • (Metal-Casting Processes) (Groups) 10.47 A round casting is 0.2 m in diameter and 0.75 m in...

    (Metal-Casting Processes) (Groups) 10.47 A round casting is 0.2 m in diameter and 0.75 m in length. Another casting of the same metal is elliptical in cross-section, with a major-to-minor axis ratio of 2, and has the same length and cross-sectional area as the round casting. Both pieces are cast under the same conditions. What is the difference in the solidification times of the two castings? 10.48 A cylinder with a diameter of 50 mm and a height of 75...

  • Manufacturing methods 2. (25 pts) During a sand casting process, the constant C in Chvorinov's rule...

    Manufacturing methods 2. (25 pts) During a sand casting process, the constant C in Chvorinov's rule is 3 santerof 7 proce the OD and the ID surfaces. a) Estimate the time for the casting to fully solidify. (15 pts) ss is used to produce a hollow cylindrical casting with an OD (outside diameter) of 75 mm. diameter) of 50 mm, and a height of 125 mm. The mold contacts the cylinder on both b) Write the equation used to calculate...

  • Problem 2 (a): A mold has a downsprue of length - 6.0 in. The cross-sectional area...

    Problem 2 (a): A mold has a downsprue of length - 6.0 in. The cross-sectional area at the bottom of the sprue is 0.5 in'. The sprue leads into a horizontal runner that feeds the mold cavity, whose volume = 75 in'. Determine (a) the velocity of the molten metal flowing through the base of the downsprue, (b) the volume rate of flow and (c) the time required to fill the mold cavity. Problem 2(b): The total solidification times of...

  • Question: During a sand casting process, the constant C in Chvorinov’s rule is 3 s/mm2. The...

    Question: During a sand casting process, the constant C in Chvorinov’s rule is 3 s/mm2. The process is used to produce a hollow cylindrical casting with an OD (outside diameter) of 75 mm, ID (inside diameter) of 50 mm, and a height of 125 mm. The mold contacts the cylinder on both the OD and the ID surfaces. a) Estimate the time for the casting to fully solidify. b) Write the equation used to calculate Chvorinov’s constant C. Based on...

  • 10.1 Investment casting is more suitable for mass production compare to sand casting: (a)True (b) False (0.1mark) A...

    10.1 Investment casting is more suitable for mass production compare to sand casting: (a)True (b) False (0.1mark) Answer 10.2 Total solidification time is defined as which one of the following: (a) time between pouring and complete solidification, (b) time between pouring and cooling to room temperature, (c) time between solidification and cooling to room temperature, or (d) time to give up the heat of fusion? (0.1mark) Answer. 10.3 A riser in casting is described by which of the following (three...

  • Provide the formula please for each part solved A solid hexagonal shaped casting of thickness 3...

    Provide the formula please for each part solved A solid hexagonal shaped casting of thickness 3 cm and each side as 8 cm is being casted in a sand mold. The distance from top of the pouring cup to the sprue bottom is 20 cm, which is along the parting line. The diameter of the circular cross section at the base of sprue is 1.5 cm. The part is fully buried in drag side of the mold and top surface...

  • Hi, please help me with this problem, please explain me step by step and write with...

    Hi, please help me with this problem, please explain me step by step and write with very good calligraphy. Thank you very much. Consider casting sand mold of the piece shown in the figure. The dimensions are in centimeters. (i) The molten metal overflows the pouring cup of the mold and flows down the sprue (downsprue) at a constant rate of 2000 cm3/s. The cross section of the sprue is circular, with a diameter of 6 cm at the top....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT