Describe 5 examples for the application of the principles of value engineering in construction projects.

**This is an example cant be used

Function: Provide floor finish.
Performance Criteria:
 Cost
 Aesthetics
 Service life
 Safety
 Durability, etc. **

0 0
Add a comment Improve this question Transcribed image text
Answer #1
Function Performance criteria
Good Use of Building Space
  • Cost
  • Aesthetic
  • Eco- friendly
  • Efficient
Energy conservative measures like water harvesting and solar panels
  • Will be cost effective
  • Eco - friendly
  • Alternate source of energy
Using PPC over OPC
  • Cost
  • More resistance
  • Durability
  • Sustainability
Plastering
  • Aesthetics
  • Durability
  • Safety
  • Service life
Painting
  • Aesthetics
  • Durability(especially on metals)
  • Protects surfaces
Add a comment
Know the answer?
Add Answer to:
Describe 5 examples for the application of the principles of value engineering in construction projects. **This...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Capital Decision Matrix Net Present Value Jack in the Box You are the owner of a...

    Capital Decision Matrix Net Present Value Jack in the Box You are the owner of a Jack in the Box and responsible for picking one capital project for a single restaurant in a new district. For this example, ignore all tax implications (so don’t worry about depreciation).   Determine cash flows from the incremental profits or cost savings as listed. Use 10 percent as the interest rate. The projects are: Purchase a dessert case Will provide incremental profits of 10 cents...

  • what are the four parts of a proper engineering specification? see table 2.4 as an example....

    what are the four parts of a proper engineering specification? see table 2.4 as an example. Describe what information conveyed with each part. Table 2.4: Product design specification for the compressor transmission. Criteria Test conditions Objective Aspect Test transmission on a Transmission must transmit 5 kW Transmit Performance at 2850 rpm. dynamometer torque If positive drive is employed then assume specified ratio or if a positive drive is used measure speed of output shaft at design Speed ratio The transmission...

  • 5. All of the following are true about projects and operations EXCEPT: A Operations are ongoing...

    5. All of the following are true about projects and operations EXCEPT: A Operations are ongoing endeavours that produce repetitive outputs, with resources assigned to do basically the same set of tasks according to the standards institutionalzed in a product life cycle, whereas projects are temporary endeavours Projects require project management activities and skill sets, whereas operations require business process management, operations management activities, and skill sets. Projects can intersect with operations at various points during the product life cycle....

  • All I need is the application on photo 4, the rest of the photos are just...

    All I need is the application on photo 4, the rest of the photos are just for reference. Objective: To become familiar with major logistics customer service elements and their measurement. Information: In many markets, logistics customer services are critical to successful marketing. An Ohio State University (OSU) study of customer service elements performed by Bernard J. LaLonde, Martha Cooper and Thomas Noordewier in 1988 identified the major logistics customer service elements. Additional customer service studies in the 1990's have...

  • Holistic Marketing: Describe the premise of the Holistic marketing orientation. List and describe the four main...

    Holistic Marketing: Describe the premise of the Holistic marketing orientation. List and describe the four main dimensions of holistic marketing. Then discuss the impact of these elements on customer value. Value Chain: DK Books hesitated to build an online presence until Amazon.com’s success was too great to ignore. They originally feared that their network of hundreds of “bricks-only” stores would suffer sales losses due to the Web site competing with the stores. When the decision was finally made, DK decided...

  • Utilizing Menu Engineering Concept in a Restaurant Operation The purpose of this assignment is fo...

    Utilizing Menu Engineering Concept in a Restaurant Operation The purpose of this assignment is four fold: Step 1. To learn basic menu engineering principles Step 2. To learn menu engineering strategies Step 3. To use a spreadsheet program in generating two menu engineering reports Step 4. To evaluate the information found in the menu engineering reports using the menu engineering strategy model presented in this assignment. This will be accomplished by answering 9 questions found at the end of this...

  • Maintenance Management, Please help with my assignment. Your task for this portfolio-type assignment is to write...

    Maintenance Management, Please help with my assignment. Your task for this portfolio-type assignment is to write a technical report that demonstrates how you would co-ordinate and execute the entire project. Your report should highlight the following topics covered in the module: 1. Project Management: Use the WBS to plan for your project, indicating all equipment involved, maintenance activities, human resource and all costs (10) (20) 2. Networks for Projects: Prepare a network diagram for all activities in your project; 3....

  • Maintenance Management, Please help with my assignment. Your task for this portfolio-type assignment is to write...

    Maintenance Management, Please help with my assignment. Your task for this portfolio-type assignment is to write a technical report that demonstrates how you would co-ordinate and execute the entire project. Your report should highlight the following topics covered in the module: 1. Project Management: Use the WBS to plan for your project, indicating all equipment involved, maintenance activities, human resource and all costs (10) (20) 2. Networks for Projects: Prepare a network diagram for all activities in your project; 3....

  • Minutes from the Planning Committee Meeting Present: Ms. Morehouse, administrator; Mr. Hassan, finance and admissions coordinator;...

    Minutes from the Planning Committee Meeting Present: Ms. Morehouse, administrator; Mr. Hassan, finance and admissions coordinator; Mr. Washington, food services director; Ms. Laird, director of nursing; Ms. Smith, rehabilitation supervisor; Mr. Keith, construction representative; Mr. Morgan, designer; Mr. Welbourne, contractor; Ms. Reese, architect. The meeting started at 9 a.m. Ms. Morehouse began with introductions of those present. She 702 explained that culture change in the nursing home industry was going to gain momentum and, if traditional facilities did not adapt...

  • TORENTO CONSTRUCTION: ETHICAL CONTRACTING On December 27, 2010, Cary Holmes, manager of the Supply Chain Management...

    TORENTO CONSTRUCTION: ETHICAL CONTRACTING On December 27, 2010, Cary Holmes, manager of the Supply Chain Management (SCM) group at Torento Construction Inc. (NCG), was in his office in Torento, Ontario, trying to organize the thoughts running through his head as a result of a recent bidding to save operating costs at NCG. There was no problem in terms of the final outcome; in fact, the bid was going to result in cost savings of 25 per cent, which was exactly...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT