Question

A quality analyst wants to construct a control chart for determining whether three machines, all producing...

A quality analyst wants to construct a control chart for determining whether three machines, all producing the same product, are in control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results:

Machine Measurements

1 17 15 15 17

2 16 25 18 25

3 23 24 23 22

What is the estimate of the mean of the sampling distribution for the sample mean?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer: Mean of sampling distribution= 1.540

Explanation:

sample 1 2 3 4
1 17 15 15 17
2 16 25 18 25
3 23 24 23 22
X-bar (Mean)= Average of samples 18.67 21.33 18.67 21.33

Sample standard deviation= STDEV.S(Xbar values) = 1.540

Add a comment
Know the answer?
Add Answer to:
A quality analyst wants to construct a control chart for determining whether three machines, all producing...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A quality analyst wants to construct a control chart for determining whether three machines, all producing...

    A quality analyst wants to construct a control chart for determining whether three machines, all producing the same product, are in control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results: Machine Measurements #1 17 15 15 17 #2 16 25 18 25 #3 23 24 23 22 What is the estimate of the mean of the sampling distribution for the sample mean? O 20 16 FOOOOO 23...

  • 4. A Quality Analyst wants to construct a control chart for determining whether three machines, all...

    4. A Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results : Machine #1 measurements [13, 16, 21, 16]; Machine #2 measurements [ 22, 24, 23, 21]; Machine #3 measurements [ 15, 24, 13, 12]. Using the factors for three sigma control limits, what are x-bar chart...

  • 2. Which of the following is not a dimension of service quality? Select one: a. responsiveness...

    2. Which of the following is not a dimension of service quality? Select one: a. responsiveness b. conformance c. tangibles d. assurance e. convenience 4. A Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results : Machine #1 measurements [13, 16, 21, 16]; Machine #2 measurements [...

  • The Chair of the Operations Management Department at Quality University wants to construct a p-chart for...

    The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four instructors teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Instructor Number of Failures Prof A 13 Prof B 0 Prof C 11 Prof D 16 Prof C Prof D What is the sample...

  • 1) Triangle Packaging Machinery wants to test the quality of its cereal bag filling machines. The...

    1) Triangle Packaging Machinery wants to test the quality of its cereal bag filling machines. The firm’s quality analyst took 35 samples of size 7 each from a cereal-bag-filling machine. The results were overall mean = 57.75 pounds; average range = 1.78 pounds. a) Determine the upper and lower control limits of the x-chart, where sigma = 3 b) Determine the upper and lower control limits of the R-chart, where sigma = 3 2) The results of an inspection of...

  • Quasar Exports Ltd, a fictional Turkish manufacturer of glass, wants to use a c-chart to monitor...

    Quasar Exports Ltd, a fictional Turkish manufacturer of glass, wants to use a c-chart to monitor the number of defects in the sheets of glass it produces. The company wants to use the chart to address the production problems it is experiencing and use it on an ongoing basis as a monitoring tool. To construct the chart, the company collected data over 5 days by inspecting 30 sheets of glass and recording the number defects per sheet. The data are...

  • 4) Now that Continental can detect more defects before the Silver Box is shipped, I decided...

    4) Now that Continental can detect more defects before the Silver Box is shipped, I decided process Improvements in its circuit board fabrication department would further improve quality. So, for one process they collected the following data this morning to set up a mean control chart. Since the process mean is unknown, estimate the mean and find the UCL and LCL for a 3-sigma mean control chart using this morning's samples. Sample 1 - 24, 24, 25, 22, 21 Sample...

  • Problem5 While efficiency in the production operation is important to profitability,ACME Valve is also known for...

    Problem5 While efficiency in the production operation is important to profitability,ACME Valve is also known for high quality fieished products. Parts that do not meet specifications cannot be "reworked, so that both the raw material cost and the machine time to produce them are detrimental to profitability. Drills can become holes, and machines can get out of callbration as well For the parts in your department the critical dimension is the diameter of the center hole and design specifications require...

  • Construct an Xbar / S control chart and determine the process capability index of it for...

    Construct an Xbar / S control chart and determine the process capability index of it for a specification of 74.000 ± 0.015. Rock Dept. Data Inside Diameter Measurements (mm) for Automobile Engine Piston Rings Sample Number 4 S 7 10 74.030 73.995 73.988 74.002 73.992 74.009 73.995 73.985 74.008 73.998 73.994 74.004 73.983 74.006 74.012 74.000 73.994 74.000 73.984 74.000 73.982 74.004 74.010 74.015 73.982 13 Observations 74.019 73.992 74.001 74.011 74.021 74.005 73.993 74.015 74.015 73.989 73.997 73.985 73.994...

  • A manager is in a tizzy and asks if you can construct an Individuals/Moving Range control...

    A manager is in a tizzy and asks if you can construct an Individuals/Moving Range control chart for the data he provided, treating each data point as an independent measurement taken sequentially. In addition, he wants an estimate of process capability for a specification of 74.000 ± 0.015 using this set of charts. Table 5-3 Inside Diameter Measurements (mm) for Automobile Engine Piston Rings Sample Number Observations 2 3 4 5 6 7 8 9 10 11 12 13 74.030...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework