Question

a.) Explain the Factors To Be Considered In Selecting The Site Of A Hydroelectric Power Plant...

a.) Explain the Factors To Be Considered In Selecting The Site Of A Hydroelectric Power Plant [5 MARKS]

b.) Explain the basic difference between Hydro power and Hydroelectric power [5 MARKS]

c.) Design a hydro-power plant for energy generation for a mid-size farm with insufficient water distribution networks. Make assumptions as much as possible in such a design system.

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
a.) Explain the Factors To Be Considered In Selecting The Site Of A Hydroelectric Power Plant...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • At the maximum rate of power generation, a small hydroelectric power plant takes a discharge of...

    At the maximum rate of power generation, a small hydroelectric power plant takes a discharge of 16.2 m/s through an elevation drop of 61 m. The head loss through the intakes, penstock, and outlet works is 5.8 m. The turbine, combined with the electrical generator, is able to convert 86% of the mechanical energy into electrical energy. What is the rate of electrical power generation? The water temperature is 15°C. Elevation = 61 m Penstock Powerhouse 4 Elevation = 0...

  • The vertical drop of water in a hydroelectric power plant is 155m (See figure below). Water...

    The vertical drop of water in a hydroelectric power plant is 155m (See figure below). Water flows through the plant and into the lower river at the rate of 425m/s. Assume the overall efficiency of the plant as 80%. Density of water d is equal to 1000kg/m3 Acceleration due to gravity g is equal to 9.81m/s2. Ignore the viscous losses in the flowing water. Dam Water Reservoir Hm Turbine Generator River Figure: Schematic diagram of the hydroelectric power plant (a)...

  • Please help me thanks. The vertical drop of water in a hydroelectric power plant is 125m...

    Please help me thanks. The vertical drop of water in a hydroelectric power plant is 125m (See figure below). Water flows through the plant and into the lower river at the rate of 325m/s. Assume the overall efficiency n of the plant as 80%. Density of water d is equal to 1000kg/mº. Acceleration due to gravity g is equal to 9.81m/s2. Ignore the viscous losses in the flowing water. Dam Water Reservoir Hm Turbine Generator River Figure: Schematic diagram of...

  • a) The following figure shows a water dam built for a hydroelectric power project running constantly...

    a) The following figure shows a water dam built for a hydroelectric power project running constantly round the year. During a dry season, it acts as water reservoir of constant height 80 m. Meanwhile rainy season, water flow of 3 m/s is added to the system. (Water density 10x10 kg/m' and volume flow, V = 45x10 m/s respectively and the gravitational acceleration is about 9.8 kg/m for both seasons). Evaluate the followings: Ravet afsec RE Figure 2: Water flow utilization...

  • Figure 4 Water pipes taking water from Trawsfynydd Lake to Maentwrog hydroelectric power station Question 3...

    Figure 4 Water pipes taking water from Trawsfynydd Lake to Maentwrog hydroelectric power station Question 3 This question is worth 12 marks. The water from the lake in Question 2 flows along the river and enters a hydroelectric power plant through large inlet pipes with a circular cross-section of internal diameter , similar to those shown in Figure 4. Figure 4 Water pipes taking water from Trawsfynydd Lake to Maentwrog hydroelectric power station a.Explain why the velocity of the water...

  • this case is from “introduction to business”Madura Jeff Case: Selecting the Best Plant Site Richard Capozzi,...

    this case is from “introduction to business”Madura Jeff Case: Selecting the Best Plant Site Richard Capozzi, an entrepreneur in the high-fashion Italian shoe industry, is planning to relocate his manufacturing operation to the western part of the United States. He is currently considering two different locations. One possible location is outside Los Angeles, and the other is in Oklahoma City. In analyzing the plant size decision, he is considering several factors. The cost of land is high in Los Angeles....

  • Answer ALL questions (100 marks) 1 (a) Describe briefly the factors to be considered in planning...

    Answer ALL questions (100 marks) 1 (a) Describe briefly the factors to be considered in planning a good site layout in the most effective and efficient manner (6 marks) (b) Provide the definition of the following terms in the British Standard Glossary of terms in Work Study under BS 3138:- Method Study (m) Work Measurement (4 marks (c) Describe briefly the benefits of work study to the organization (5 marks) Page 2 of 10- (d) List any Five 15 principles...

  • hydroelectric power plant problem provided in a standby plantr Tme enceCythe hyuidelectiic lali wiii The demand for electric power is usually much lighter during the day than it is at night, and u...

    hydroelectric power plant problem provided in a standby plantr Tme enceCythe hyuidelectiic lali wiii The demand for electric power is usually much lighter during the day than it is at night, and utility companies often sell power at night at much lower prices to encourage consumers to use the available power generation capacity and to avoid building new expensive power plant that will be used only a short time during peak periods. Utilities are also to purchase power produced during...

  • Q-1 What is irreversibility in a power plant, what are types of irreversibility?

    Q-1 What is irreversibility in a power plant, what are types of irreversibility?Q-2 What is a pinch point? What is its effect on the size and efficiency of the steam generator?Q-3 What is the mean temperature of heat addition? What is its effect on cycle efficiency? Explain the different methods by which the mean temperature of heat addition can be increased.Q-4 How is the maximum and minimum pressure of a steam cycle is decided - How can we address the...

  • The following diagram illustrates a simple steam power plant. A 10kg/s flow of liquid water at...

    The following diagram illustrates a simple steam power plant. A 10kg/s flow of liquid water at T1=25°C enters the pump at a pressure of P1=100kPa and is then pumped to a pressure of P2=2MPa. The boiler then heats the water at constant pressure to produce superheated vapour at T3=450°C. The steam is then expanded in the turbine to a final pressure of P4=100kPa. The turbine and pump are well insulated and may be considered reversible. a) Find the turbine exit...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT