Question

You send PO# 1234 to vendor A with an original due date of Tuesday 5/4. The...

You send PO# 1234 to vendor A with an original due date of Tuesday 5/4. The vendor A sends you an ASN specifying a delivery date of Wednesday (5/5). The planned delivery time is 2 days and the GR processing time is 1 day, what will be the new PO due date (date when material is available for use)?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Given,

Delivery date = 2 days

GR processing time = 1 day

Requisition due date = Delivery Date plus the GR processing time = 3 days from the current date

= 5/6

Add a comment
Know the answer?
Add Answer to:
You send PO# 1234 to vendor A with an original due date of Tuesday 5/4. The...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • What would be the sequence of the following jobs if you did them in Earliest Due...

    What would be the sequence of the following jobs if you did them in Earliest Due Date sequence? Job A B Processing Time Days Due from Today 18 24 16 16 26 10 14 12 21 30 С D E OE,A,D,B,C E,D,A,C,B OC,D,B,A,E, C.B.D.A,E Question 6 (10 points) You have 5 jobs to do. What would be the sequence if you chose to do a Shortest Processing Time Approach? Job Processing Time Days Due from Today А 24 30 B...

  • 1. An organization requests that a vendor arrange for a site visit. This organization is in...

    1. An organization requests that a vendor arrange for a site visit. This organization is in the ________ phase of the information system life cycle. A. needs assessment B. system selection C. implementation D. maintenance 2. When selecting a vendor for design, development, and support of an information system, the health care organization asks the vendor to provide information about its ability to meet the needs of the organization by sending the vendor a(n) ________. A. request for quote B....

  • al Industries are likely to use 4 At Webster University, where you work as a project...

    al Industries are likely to use 4 At Webster University, where you work as a project manager, you have been asked to conduct user training sessions for a new information system. You must develop a specific schedule for the tasks (the estimated task duration for each is shown in parentheses): . First, confirm arrangements for the training facility you plan to use (2 days). • After you have confirmed the training facility, two tasks can begin at the same time:...

  • Due Date: Group: Process Instrumentation -Lab 4 Exercise 7. psi An open atmospheric vessel containing an...

    Due Date: Group: Process Instrumentation -Lab 4 Exercise 7. psi An open atmospheric vessel containing an unknown mixture, A direct level measurement determined the level h 30.9 ft. Bottom tank pressure P. gauge reads 11.7 psig. The density of the material is unknown. Known: • specific weight of water is 62.43 lbs/ft. • External pressure is 1 atm • P=SGxh a is the material water? Yes No b. Explain why and show work that validates your answer: c. Determine the...

  • In this exam, you will design and implement a Python class called 'Date according to the...

    In this exam, you will design and implement a Python class called 'Date according to the following API specifications. • Do NOT use any existing classes in your answer such as datetime. . You will design your class so that it operates correctly on another planet, where the total days in a year, total days in a month, and months per year may be different. For our planet Earth, you will assume that a year has 360 days and all...

  • SP19 FLEX > This assignment is past the original due date of l Due ln You begin by looking at your data...

    SP19 FLEX > This assignment is past the original due date of l Due ln You begin by looking at your data to understand them better and to know what methods of inference you can safely use ) (deck all r mup-pily there-mr-m when creating confidence intervals, which of the follo ng variables will requ 10 con t e you to check the np 210 and n -p re ha, ae- than one ORiver List Price ORiver_Days to Sell O...

  • Case 5-4 Shouldice Hospital in Canada is widely known for one thing—hernia repair! In fact, that...

    Case 5-4 Shouldice Hospital in Canada is widely known for one thing—hernia repair! In fact, that is the only operation it performs, and it performs a great many of them. Over the past two decades this small 102-bed hospital has averaged 7,000 operations annually. Last year, it had a record year and performed nearly 7,500 operations. A hernia repair operation at Shouldice Hospital is performed by one of the 12 full-time surgeons assisted by one of seven part-time assistant surgeons....

  • NAME Due Wednesday, March 4 Each question is worth 5 points. To get all points you...

    NAME Due Wednesday, March 4 Each question is worth 5 points. To get all points you must properly label your diagrams and identify original and new equilibrium. California Wingin ose the federal government has enforced a price ceiling on natural gas. Bemie Sanders Suppose wins the elect the election and decides that such government intervention is not needed (Feel the Bem tine supply and demand diagrams, show the effect on the equilibrium price and quantity of removing the price ceiling...

  • ENT 210: The Management Process of Entrepreneurs Week 4, Chapter 12 Case Study Assignment DUE DATE:...

    ENT 210: The Management Process of Entrepreneurs Week 4, Chapter 12 Case Study Assignment DUE DATE: Wednesday, February 13 25 Points There is a concluding case titled “The Law Offices of Jeter, Jackson, Guidry, and Boyer” at the end of the chapter on pages 465 - 466. As you read this short case, think about how the concepts from this chapter apply to what you are reading. CASE – 4 The Law Offices of Jeter, Jackson, Guidry, and Boyer THE...

  • Short Paper # 2 is due in week 3 (Tuesday at 9 pm, with a grace...

    Short Paper # 2 is due in week 3 (Tuesday at 9 pm, with a grace period until 1159 pm). Papers submitted after 9 pm and up to and including 11:59 pm on the due date are late but NOT penalized. Any paper submitted after the grace period is late and penalized at the rate of one full letter grade per day late (or any portion thereof). Blackboard is the official time keeper. After 3 days, any paper not submitted...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT