An extensive filling project to form a platform for a subdivision housing development is proposed. Preliminary data based on several site investigation boreholes suggests that the geology of the proposed site is as shown in Figure 1, which implies the fill will be placed over a swampy area of soft saturated normally consolidated clay overlaying a bed of relatively incompressible well-drained dense sand. The water table in the clay layer is at the surface of the clay layer, and it can be assumed that the entire fill layer will remain dry after the platform construction due to a good provision of drainage measures. In order to provide information for analysis, two piezometers have already been installed at different levels in the clay layer (refer to Figure 1). You can assume g equal to 10 m/sec2.

▼ Proposed Final Fill Level Proposed Gravelly Fill (Pay #1 800 kg/m3) 3.5m 1 Original Ground Level 2m 4.5m Saturated Soft Cla

Assume coefficient of consolidation (Cv) = 0.0119 m2/day and coefficient of compressibility mv = 0.00043 m2/kN.

a).What are the pore water pressure measurements that you would expect to record at the upper and lower piezometers (Figure 1) prior to the proposed filling?

b). Based on the information given, estimate the magnitude of the final ground settlement that would result from the filling.

c).Houses on shallow footings will be built after the completion of the platform, and the relevant building code suggests that they should not be built on a ground surface that could be subject to a settlement in excess of 50 mm. In order to meet this requirement, estimate how many months after the completion of filling one has to wait before any houses can be built on the platform.

d). At the above time as estimated in (c), what are the pore water pressure measurements you would expect to observe at the upper and lower piezometers?

0 0
Add a comment Improve this question Transcribed image text
Answer #1


Fll clou ina gseund b) final-一ground Settlement --H mo DO23 cm 230mm 三50m Su 23omm to wcit fox Settement r (S wight eFill CS 230-50 230 p.26- > 601 0 9332 lop (1-18.2 2Condition O. O 642.0d exces pox waka p Us 03s or overall la 63-64 x (63-0) = &.ig kNнґ0.47 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0. 0.9 1.0 0.87 Consolidation ratio, USame fo both Louwe

Add a comment
Know the answer?
Add Answer to:
An extensive filling project to form a platform for a subdivision housing development is proposed...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question 2 The soil profile at a level site consists of a 3-m thick layer of...

    Question 2 The soil profile at a level site consists of a 3-m thick layer of sandy clay, overlaying an 8-m thick layer of loose sand, overlaying stiff gravelly clays that extend to depths greater than 20 m. The water table is at a depth of 2 m and the ground water is initially hydrostatic. The total unit weight of the upper sandy clay, above or below the water table, is 18 kN/m3. The total unit weight of the loose...

  • You are evaluating the geotechnical characteristics of a Miami site for a proposed office buildin...

    You are evaluating the geotechnical characteristics of a Miami site for a proposed office building. Subsurface investigation showed that the site consists of the following layers: (1) a 5-ft sandy laver with a unit weight of 100 pcf (2) a 10-ft silty sand layer with a saturated unit weight of 115 pcf. (3) a 20-ft saturated clay layer with a unit weight of 118 pef, void ratio of 0.85, and underlain by gravels. The site seemed to have strong potential...

  • Problem 7 The soil profile at a site consists of a top 4 m layer of...

    Problem 7 The soil profile at a site consists of a top 4 m layer of dense sand followed by 2 m of clay, which is underlain by a stiff stratum. The water table is at 2 m below the ground level. The following data was obtained from a consolidation test on an undisturbed sample obtained from the middle of the clay layer: water content 5 36%, specific gravity of the clay grains = 2.72, compression index = 0.72, recompression...

  • [Problems 1-4] The soil profile at a site for a proposed office building consists of a...

    [Problems 1-4] The soil profile at a site for a proposed office building consists of a layer of fine sand 10.4 m thick above a layer of soft, normally consolidated clay 2 m thick. Below the soft clay is a deposit of coarse sand. The groundwater table was observed at 3 m below ground level. The void ratio of the sand is 0.76, and the water content of the clay is 43%. The building will impose a vertical stress increase...

  • 3) At a construction site, a site investigation has been carried out. At ground level (-1...

    3) At a construction site, a site investigation has been carried out. At ground level (-1 m NAP) a clay layer with a thickness of 4 m is found (y = 16 kN/m”, k = 2.0x10-12 m/s, Cp = 15), followed by a sand layer of 6 m thickness (y = 20 kN/m², k = 5.0x10-7 m/s), another clay layer of 4m thickness (y = 18 kN/m3, k = 4.5x10-11 m/s, Cp = 25), and finally another sand layer (y...

  • 1. A large tank structure 5 m high is to be constructed on the site as...

    1. A large tank structure 5 m high is to be constructed on the site as shown below on Figure 1. The intention is to fill the tank with water. Determine the vertical total stress, vertical effective stresses and pore water pressure at the centre point of both the clay layer and the sand layer (a) before the tank is constructed (b) immediately after the tank is first filled with water. (c) Many years later assuming the tank remains full...

  • In the figure below, the natural soil profile consists of sand overlying clay overlying sand overlying bedrock. A water...

    In the figure below, the natural soil profile consists of sand overlying clay overlying sand overlying bedrock. A water table is present 1 m beneath the surface of the natural ground. If 4 m of consistent fill material (γfill = 15 kN/m3) was placed on top of this soil profile that covered a large area, determine: (a) The consolidation settlement of the clay layer (using 4 equal layers in your calculation), and (b) The time (in days) for this consolidation...

  • e3 shows the soil profile (sand-clay-sand) at the site of a warehouse that causes a surface...

    e3 shows the soil profile (sand-clay-sand) at the site of a warehouse that causes a surface ding of 100 kPa. (pw= 1000 kg/m; g 9.81 m/s2) on 4 (25 marks) A clay sample was cored at 7 m depth (middle of the clay layer). Based on laboratory test data, it was found that the clay was over-consolidated with OCR = 2.5 (before applying surface loading), compression index Ce 0.44 and recompression index C. = 0.1. The consolidation coefficient of clay...

  • Q) Calculate the possible vertical settlements at points A, B, C and D (along the railway...

    Q) Calculate the possible vertical settlements at points A, B, C and D (along the railway line) with considering the potential extreme seasonal change from the wettest to the driest (please note that each soil layer is extensively long (≥ 20 km) and thus lateral movement of the soil has been restricted by the surrounding soil) The proposed new railway line is shown in Figure 1. The ground in the construction site consists of an expansive clay layer underline by...

  • Question 6 It is required to construct a 4 m deep underground carpark in the heart...

    Question 6 It is required to construct a 4 m deep underground carpark in the heart of the city of Melbourne without disturbing the surrounding area. The required excavation for the proposed carpark and also the adjacent ground condition are shown in Figure 6.1. As can be seen from the figure, the adjacent ground consists of a 2 m deep clay deposit, resting on a 2 m thick sand deposit, where stable soil could be found below the sand deposit...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT