Question

. A chemical plant stores spare parts for maintenance in a large warehouse. Throughout the workin...

. A chemical plant stores spare parts for maintenance in a large warehouse. Throughout the working day, maintenance personnel go to the warehouse to pick up supplies needed for their jobs. The warehouse receives a request for supplies, on average, every three minutes. The average request requires 2.75 minutes to fill a request. Maintenance employees are paid $21.50 per hour and warehouse employees are paid $16 per hour. The warehouse operates 8 hours per day.

a) Based on the number of maintenance employees in the system, an 8 hour work day, and the given arrival and service rates. What is the system cost per day (to the nearest $) if there is only 1 warehouse employees working?

b) Based on the number of maintenance employees in the system, an 8 hour work day, and the given arrival and service rates. What is the system cost per day (to the nearest $) if there are 2 warehouse employees working?

c) Based on the number of maintenance employees in the system, an 8 hour work day, and the given arrival and service rates. What is the system cost per day (to the nearest $) if there are 3 warehouse employees working?

d) What is the optimal number of warehouse employees to staff the warehouse?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

a) The number of maintenance employees is not specified in the problem, so consider that it is an infinite number. So, it is a M/M/1 system with following parameters,

Arrival rate, \lambda = 1/interarrival time = 1/3 per minute = (1/3)*60 = 20 per hour

Service rate, \mu = 1/service time = (1/2.75)*60 = 21.82 per hour

Number of maintenance employees in the system, L = \lambda/(\mu-\lambda) = 20/(21.82-20) = 11

System cost per hour = Cw*L + s*Cs

= 21.5*11+1*16

= $ 252.5

System cost per day = 252.5*8

= $ 2,020

b) With more than 1 warehouse employees (servers) working, it is a multi-channel M/M/s system , where

Number of servers, s = 2

Operating characteristics are computed using spreadsheet as below

D11 Q fx =(VLOOKUP(D6+1,$GS2SH$26,2,0)-VLOOKUPfD6,SG$2:SH$26,2,0))D9D10/(1-D10)^2+D4/D5 1 A Mutliple-Server Waiting Line Sy

EXCEL FORMULAS:

Cell Formula H3 (SDS4/SDS5)AG2/FACT(G2)+H2 D9 Copy to H3:H26 1/((VLOOKUP(D6+1,SGS2:SHS26,2,0)-VLOOKUP(D6,SGS2:SH$26,2,0)/(1 D

L = 1.1604

Total system cost per hour = 1.1604*21.5+2*16 = 56.95

Total system cost per day = 56.95*8 = $ 455.6

b) With more than 1 warehouse employees (servers) working, it is a multi-channel M/M/s system , where

Number of servers, s = 3

Operating characteristics are computed using spreadsheet as below:

n Summation 1 A Mutliple-Server Waiting Line System 2 2 Input Arrival rate- per hour 2 2 2 Service rate21.818182 per hour No.

L = 0.9489

Total system cost per hour = 0.9489*21.5+3*16 = 68.40

Total system cost per day = 68.40*8 = $ 547.2

d) We see that total system cost per day of 2 warehouse employees working is the lowest.

Therefore, optimal number of warehouse employees to staff the warehouse = 2

Add a comment
Know the answer?
Add Answer to:
. A chemical plant stores spare parts for maintenance in a large warehouse. Throughout the workin...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • the pre 5.22, The Seaboard Shipping Company has a warehouse terminal in ta Spartanburg, South Carolina....

    the pre 5.22, The Seaboard Shipping Company has a warehouse terminal in ta Spartanburg, South Carolina. The capacity of each terminal dock is three trucks. As trucks enter the terminal, the drivers receive num- bers, and when one of the three dock spaces becomes available, the truck with the lowest number enters the vacant dock. Truck arrivals are Poisson distributed, and the unloading and loading times (service th of d times) are exponentially distributed. The average arrival rate at the...

  • Frederick Company has two service departments (Cafeteria Services & Maintenance). Frederick has two production departments (Assembly...

    Frederick Company has two service departments (Cafeteria Services & Maintenance). Frederick has two production departments (Assembly Department & Packaging Department.) Frederick uses a step allocation method where Cafeteria Services is allocated to all departments and Maintenance Services is allocated to the production departments. All allocations are based on total employees. Cafeteria Services has costs of $275,000 and Maintenance has costs of $280,000 before any allocations. What amount of Maintenance total cost is allocated to the Packaging Department? (round to closest...

  • Eric works as an associate in one warehouse, one of his job assignments is to perform...

    Eric works as an associate in one warehouse, one of his job assignments is to perform inventory counting on one item at the end of every Sunday night. It normally takes him 24 minutes each time. Eric is paid at hourly rate of $18 per hour plus 20% benefit (based on the hourly wage) paid by his employer. If assuming there are 52 weeks every year, what is the total counting cost incurred for this particular SKU per year? Round...

  • Calculating and Using Dual Charging Rates The expected costs for the Maintenance Department of Stazler, Inc.,...

    Calculating and Using Dual Charging Rates The expected costs for the Maintenance Department of Stazler, Inc., for the coming year include: Fixed costs (salaries, tools): $66,465 per year Variable costs (supplies): $1.35 per maintenance hour The Assembly and Packaging departments expect to use maintenance hours relatively evenly throughout the year. The Fabricating Department typically uses more maintenance hours in the month of November. Estimated usage in hours for the year and for the peak month is as follows: Yearly hours...

  • ebook Calculator Calculating and using Dual Charging Rates The expected costs for the Maintenance Department of...

    ebook Calculator Calculating and using Dual Charging Rates The expected costs for the Maintenance Department of Stazler, Inc., for the coming year include: Fixed costs (salaries, tools): $61,040 per year Variable costs (supplies): $1.4 per maintenance hour The Assembly and Packaging departments expect to use maintenance hours relatively evenly throughout the year. The Fabricating Department typically uses more maintenance hours in the month of November. Estimated usage in hours for the year and for the peak month is as follows:...

  • Consider a bank branch that has three distinct customer arrival patterns throughout the day, as measured...

    Consider a bank branch that has three distinct customer arrival patterns throughout the day, as measured by average arrival rates (below) Morning (8:30 11:30): 40/hour Lunch (1:30-1:30): 60/hour Afternoon (1:30 4:00): 3 35/hour. Regardless of the time of day, the average time it takes for a teller to serve customers is 2 minutes, 52 seconds Because of competition with other banks in the area, management has determined that they want to keep the average customer wait before service to be...

  • The owner of a small mill-working plant that builds cabinets is developing his aggregate plan for...

    The owner of a small mill-working plant that builds cabinets is developing his aggregate plan for the next year. The relevant cost data and forecast for the next 4 quarters is provided below. The company currently has 20 employees and works one 8 hour shift each day with 2 paid 15 minute breaks. Assume each quarter has 65 working days, and that it currently has no units in stock. Use this information and the information from the table to answer...

  • New Georgia-Pacific lumber plant in Albany, GA is expected to produce 300 million board-feet of lumber...

    New Georgia-Pacific lumber plant in Albany, GA is expected to produce 300 million board-feet of lumber a year. The facility will employ 125 employees in the production section working in 8-hour shifts each day. Assume number of work-days in the facility is 300. a. What is the productivity per-employee? 
 b. What is the productivity per labor-hour? 


  • The Europa Company has a large warehouse in Florida to store its inventory of goods until...

    The Europa Company has a large warehouse in Florida to store its inventory of goods until they are needed by the company’s many furniture stores in that area. A single crew with four members is used to unload and/or load each truck that arrives at the loading dock of the warehouse. Management currently is downsizing to cut costs, so a decision needs to be made about the future size of this crew. Trucks arrive randomly at the loading dock at...

  • just question 5.b 5. The Holix Corporation has two separate processing centers for credit applications. Each...

    just question 5.b 5. The Holix Corporation has two separate processing centers for credit applications. Each credit application passes through three steps: step 1-background credit check, step 2 - credit risk profile analysis, and step 3—credit level approval and communication to client. The processing time for each of the stages is 20 minutes for credit check, 50 minutes for credit risk profile analysis, and 14 minutes for credit approval and communication. The set-up time between successive applications for each step...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT