Ziege Systems is considering the following independent projects for the coming year:
Project |
Required Investment |
Rate of Return |
Risk |
A | $4 million | 12.25% | High |
B | 5 million | 14.75 | High |
C | 3 million | 10.25 | Low |
D | 2 million | 10.25 | Average |
E | 6 million | 13.25 | High |
F | 5 million | 13.25 | Average |
G | 6 million | 8.25 | Low |
H | 3 million | 12.75 | Low |
Ziege's WACC is 10.75%, but it adjusts for risk by adding 2% to the WACC for high-risk projects and subtracting 2% for low-risk projects.
Which projects should Ziege accept if it faces no capital constraints?
Project A | -Select-AcceptRejectItem 1 |
Project B | -Select-AcceptRejectItem 2 |
Project C | -Select-AcceptRejectItem 3 |
Project D | -Select-AcceptRejectItem 4 |
Project E | -Select-AcceptRejectItem 5 |
Project F | -Select-AcceptRejectItem 6 |
Project G | -Select-AcceptRejectItem 7 |
Project H | -Select-AcceptRejectItem 8 |
If Ziege can only invest a total of $13 million, which projects should it accept?
Project A | -Select-AcceptRejectItem 9 |
Project B | -Select-AcceptRejectItem 10 |
Project C | -Select-AcceptRejectItem 11 |
Project D | -Select-AcceptRejectItem 12 |
Project E | -Select-AcceptRejectItem 13 |
Project F | -Select-AcceptRejectItem 14 |
Project G | -Select-AcceptRejectItem 15 |
Project H | -Select-AcceptRejectItem 16 |
If Ziege can only invest a total of $13 million, what would be the dollar size of its capital budget? Round your answer to two decimal places. Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55.
$ million
Suppose Ziege can raise additional funds beyond the $13 million, but each new increment (or partial increment) of $5 million of new capital will cause the WACC to increase by 1%. Assuming that Ziege uses the same method of risk adjustment, which projects should it now accept?
Project A | -Select-AcceptRejectItem 18 |
Project B | -Select-AcceptRejectItem 19 |
Project C | -Select-AcceptRejectItem 20 |
Project D | -Select-AcceptRejectItem 21 |
Project E | -Select-AcceptRejectItem 22 |
Project F | -Select-AcceptRejectItem 23 |
Project G | -Select-AcceptRejectItem 24 |
Project H | -Select-AcceptRejectItem 25 |
What would be the dollar size of its capital budget? Round your answer to two decimal places. Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55.
$ million
Ziege Systems is considering the following independent projects for the coming year: Project ...
Please show steps. Ziege Systems is considering the following independent projects for the coming year: Required Investment Rate of Return Project Risk $4 million 15.00% > High 5 million 12.50 0 High 0 3 million 10.50 Low 2 million 9.50 0 Average 6 million 13.50 m High 5 million 13.50 Average I Low 6 million 7.50 Low 3 million 12.25 Ziege's WACC is 11.00%, but it adjusts for risk by adding 2% to the WACC for high-risk projects and subtracting...
Required Investment Rate of Return Project Risk A $4 million 13.00% High 5 million 10.50 High 3 million 8.50 Low 8.00 Average 2 million 6 million 11.50 High 5 million 11.50 Average 6 million 6.00 Low 3 million 11.00 LOW Ziege's WACC is 9.00%, but it adjusts for risk by adding 2% to the WACC for high-risk projects and subtracting 2% for low-risk projects. a. Which projects should Ziege accept if it faces no capital constraints? Project A Reject Project...
Ch 10: End-of-Chapter Problems-LPK - The Cost Who wins LSU-Bama Sett eBook Ziege Systems is considering the following independent projects for the coming year: Required Investment Rate of Return Project Risk "$4 million 13.00% 10.50 High High 0 2 5 million 1 3 million 8.50 Low 2 million 8.00 Average 6 million 11.50 High 2 5 million 11.50 Average 6 million 6.00 Low 3 million 11.00 Ziege's WACC is 9.00%, but it adjusts for risk by adding 2% to the...
Weston Industries is considering the following independent projects for the coming year: Project Required Investment Expected Rate of Return Risk X $3 million 10.5% High Y 3 million 9.5% Average Z 7 million 6.5% Low Weston’s WACC is 9 percent, but it adjusts for risk by adding 2 percent to the WACC for high-risk projects and subtracting 2 percent for low-risk projects. Which project(s) should Weston accept assuming it faces no capital constraints? a. Project Z only b. Projects Y...
NPV Your division is considering two projects with the following cash flows (in millions): Project A -$11 $4 $7 Project B $20 $12 a. What are the projects' NPVs assuming the WACC is 5%? Round your answer to two decimal places. Do not round your intermediate calculations. Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative value should be indicated by a minus sign. Project A $ .02 million Project B $...
Your division is considering two projects with the following cash flows (in millions): $5 $12 Project A Project B -$20 -$13 a. What are the projects' NPVs assuming the WACC is 5%? Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer to two decimal places. Project A: $ million Project B: $ million What...
NPV Your division is considering two projects with the following cash flows (in millions): 0 2 3 Project A Project B $29 -$16 $15 $8 $13 $3 $3 $6 a. what are the projects' NPVs assuming the WACC is 5%? Round your answer to two decimal places. Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55. Project A $ Project B $ what are the projects' NPVs assuming the WACC is 10%? Round...
Your division is considering two projects with the following cash flows (in millions): $4 s14 Project A Project B -$35 -$15 $20 $4 $5 a. What are the projects' NPVs assuming the WACC is 5%? Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer to two decimal places. Project A: $ million Project B:...
Your division is considering two projects with the following cash flows (in millions): Iw $4 Project A Project B -$11 - $20 $12 $5 a. What are the projects' NPVs assuming the WACC is 5%? Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer to two decimal places. Project A: $ million Project B:...
h 11: End-of-Chapter Problems - The Basics of Capital Budgeting Your division is considering two projects with the following cash flows (in millions): Project A Project B -$17 -$26 $8 $10 a. What are the projects' NPVs assuming the WACC is 5%? Round your answer to two decimal places. Do not round your intermediate millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative value should be indicated by a minus sign. Project A $ million Project...