1. With BOM and Ballons
2.
Part Base
End Bracket
Center
Plate
Hex head bolt
Countersunk socket head cap screw
Hex
head nut
3.
Center plate cross section view
Final assembly
Please thumbs up
1 of 1 Mechanical Engiceting Program Home Work 13 Question for the following object: (50 points) ...
Logout Successful dt-content-rid-8312516. 1/courses/20359.201820.11B/182-Hw-8.pdf Department of Mechanical Engineering ME 210 - Mechanical Engineering Drawing & Graphies: Term 182 (20 Marks) Problem # 1 Parts of Leveling Device are shown below R20-4 PL 32 2) AUIGNING PLATE MAL IRON-ELEC PLATE-IREG LIFTING WEDGE MAL IRON-ELEC PLATE-1REQ CHROMATE QOZ-325 TYPE 2 CLASS 2-0005 THICK-ALL FILLETSよ ROUNDS RS S AS NOTED 35 THRU 3) SLIDING WEOGE PLATE-IREQ BOTH ENDS MIO x1.5 LH 10 SIDES s) BASE-108 CRS 4 HOLES ELEC PLATE REQ 7 DEEP...
based off number one to answer g and h
l work to receive 1. O ull credit. This assignment is worth 25 points ne runner stands at first base an a ball is hit, the runner base ru s hit, the nut first base and another on second base in a baseball game. At the moment er at first base runs to second base at a speed of 18 ft/s. Simultaneously, the runs to third base at 20 ft/s. The...
MAY/JUNE 2017 QUESTION 1 Figure 1 shows the components of an IDLER PULLEY Draw according to scale 1 1, ın first angle orthographic projection, the following views when assembled - A full sectional front view (According to component 1 section) - A left view (24) (14) - And a title block Insert item numbers in the assembly drawing The complete part list is as follows | DESCRIPTION | MATERIAL QUANTITY BODY PULLEY PIN SHAFT BUSH HEXAGONAL NUT I M S...
Need help with dimensions and tolerances for this drawings for
part b of question 1. Problem #30
9 First Name: Student Number: Section: The objective of this assignment is to practice reading and drawing dimensions. In this assignment, hand in this cover sheet plus 2 pieces of 8.5 x 11 Engineering paper (stapled together), as per the following: Page 1 - Divide your page into two sections. Draw the objects in Chapter 2 problem 27 and Chapter 4 problem 30...
Scenario: Styles Wing Bicycle Company manufactures and sells 2 sizes of bicycles, 21.5 inch and 22.5 inch. Sales Their sales team has committed to the following projected monthly unit sales for the next year. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 21.5 Bike 368 472 633 616 443 345 322 317 317 317 328 22.5 Bike 320 410 550 535 385 300 280 275 275 275 285 Dec 420 365 The selling price for the 21.5...
Question 1 A turning operation is carried out on aluminum. Based on the specific energy values in Table 20.2, determine material removal rate and cutting power in the operation under the following sets of cutting conditions: (a) Cutting speed 5.6 m/s, feed 0.25 mm/rev, and depth of cut 2.0 mm; and (b) cutting speed- 1.3 m/s, feed 0.75 mm/rev, and depth 4.0 mm. Question 2 Consider a turning operation performed on steel whose hardness 225 HB at a cutting speed...
auge Steel Framing Details 1. Complete all light g auge steel componente ir the following wall section, including floor joists, wall studs, roof rafters, and required clips angles, stiffeners, and fasteners. Label all components. Roof sheathing Wall sheathing 。 Interior wallboard Subflooring Foundation 103 Scale: l square =2" (50 mm) Name: necessity of cutting holes in m on the construction ste 12.11. 12.15). Thack etions a sed for top and bottom plates, e construction, shemperature that col tural shapes. Prers...