MONDAY TUESDAYWEDNESDAYTHURSDAY FRIDAY SATURDAYSUNDAY 109 100 104 106 112 110 112 110 110 113 110 108 109 110 110 105 109 112
0 0
Add a comment Improve this question Transcribed image text
Answer #1

a)10 120 115 110 105 100 95

b) Data between 106 - 112 have the maximum frequency centered about 109.

c)115 (1,109.75) 4, 109.75) 5, 109.75) 110 (7,109.5) 6, 108.75 107.75) (3, 108.75) 105 100 -95

calculate the mean of each subgroup and plot it on vertical axis , subgroups are on horizontal axis

Add a comment
Know the answer?
Add Answer to:
MONDAY TUESDAYWEDNESDAYTHURSDAY FRIDAY SATURDAYSUNDAY 109 100 104 106 112 110 112 110 110 113 110 108 109 110 110 1...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1) Triangle Packaging Machinery wants to test the quality of its cereal bag filling machines. The...

    1) Triangle Packaging Machinery wants to test the quality of its cereal bag filling machines. The firm’s quality analyst took 35 samples of size 7 each from a cereal-bag-filling machine. The results were overall mean = 57.75 pounds; average range = 1.78 pounds. a) Determine the upper and lower control limits of the x-chart, where sigma = 3 b) Determine the upper and lower control limits of the R-chart, where sigma = 3 2) The results of an inspection of...

  • 11.37 The quality control director for a clothing manufac- turer wants to study the effect of ope...

    11.37 The quality control director for a clothing manufac- turer wants to study the effect of operators and machines on the breaking strength (in pounds) of wool serge material A batch of the material is cut into square-yard pieces, and these pieces are randomly assigned, 3 each. to each of the 12 combinations of 4 operators and 3 machines chosen spe- cifically for the experiment. The results. stored in Breakstw are as follows: Machine Operator 109 110 107 110 1...

  • Here is your (discrete) data 108 83 93 118 88 58 88 65 113 103 119...

    Here is your (discrete) data 108 83 93 118 88 58 88 65 113 103 119 101 91 92 95 86 85 73 94 61 121 71 116 78 114 119 118 131 41 70 68 98 202 155 41 93 78 96 93 110 100 61 98 39 94 86 108 75 64 50 90 123 109 69 118 85 102 86 153 109 89 134 80 104 96 129 48 81 102 31 97 130 98 105 109...

  • customer. Management thinks the leneth of time that each customer is given should remain within certain limits to enhance service quality A sample of six service people was selected, and the cu...

    customer. Management thinks the leneth of time that each customer is given should remain within certain limits to enhance service quality A sample of six service people was selected, and the customer service they pro- vided was observed four times The activities that the service people were performing were identified, and the time to service one customer was recorded nt Operatio.hTe Service Time, Sec. Sample 4 Sample 2-Sample 3 Service Person-Sample 1 90 150 175 200 75 105 130 85...

  • The management of the Super Star Coffee chain is in the process of establishing quality- control...

    The management of the Super Star Coffee chain is in the process of establishing quality- control charts for the time that its service people give to each customer. Management thinks the length of time that each customer is given should remain within certain limits to enhance service quality. A sample of five service people was selected, and the customer service they provided was observed four times. The activities that the service people were performing were identified, and the time to...

  • The management of the Super Star Coffee chain is in the process of establishing quality- control...

    The management of the Super Star Coffee chain is in the process of establishing quality- control charts for the time that its service people give to each customer. Management thinks the length of time that each customer is given should remain within certain limits to enhance service quality. A sample of five service people was selected, and the customer service they provided was observed four times. The activities that the service people were performing were identified, and the time to...

  • The management of the Super Star Coffee chain is in the process of establishing quality control...

    The management of the Super Star Coffee chain is in the process of establishing quality control charts for the time that its service people give to each customer. Management thinks the length of time that each customer is given should remain within certain limits to enhance service quality. A sample of five service people was selected, and the customer service they provided was observed four times. The activities that the service people were performing were identified, and the time to...

  • Problem 1. (25 points) To get full credit, please show all your work. The management of...

    Problem 1. (25 points) To get full credit, please show all your work. The management of the Super Star Coffee chain is in the process of establishing quality- control charts for the time that its service people give to each customer. Management thinks the length of time that each customer is given should remain within certain limits to enhance service quality. A sample of five service people was selected, and the customer service they provided was observed four times. The...

  • The management of the Super Star Coffee chain is in the process of establishing quality- control...

    The management of the Super Star Coffee chain is in the process of establishing quality- control charts for the time that its service people give to each customer. Management thinks the length of time that each customer is given should remain within certain limits to enhance service quality. A sample of five service people was selected, and the customer service they provided was observed four times. The activities that the service people were performing were identified, and the time to...

  • 1-The target value of a process is 100 + 2.5. Data collected indicates the current mean...

    1-The target value of a process is 100 + 2.5. Data collected indicates the current mean of the process is 98.2 with a standard deviation of 0.6. Determine the process capability for this process? You have taken 7 samples with 6 observations each from a can operation and tested the cans for compression strength. Summary data is given below. You are to use the data for questions 2-3. 1 2 3 4 5 6 7 143.51 143.94 143.66 143.49 143.64...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT