Quality cost classification Activity Cost % of Total Department cost
Prevention $3,800 2%
Appraisal $57,000 30%
Internal Failure $22,800 12%
External Failure $30,400 16%
Other patient care $76,000 40%
$1,90,000 100%
Value Added $76,000 40%
Non value added $1,14,000 60%
Total $1,90,000 100%
Add a comment
Know the answer?
Add Answer to:
Instructions 1750000 7Waiting for transport Shaded cells have'feed Addtional Ouestion Shaded cells have feed Cost of...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The administrator of Hope Hospital has been asked to perform an activity analysis of the emergency...

    The administrator of Hope Hospital has been asked to perform an activity analysis of the emergency room (ER). The ER activities include cost of quality and other patient care activities. The lab tests and transportation are hospital services external to the ER for determining external failure costs. The result of the activity analysis is summarized as follows: 1 Activities Activity Cost 2 Patient registration $6,200.00 3 Verifying patient information 9,500.00 4 Assigning patients 12,700.00 5 Searching/waiting for doctor 8,000.00 6...

  • Instructions Three Rivers Inc. provides cable TV and Internet service to the local community. The activities and activity costs of Three Rivers are identified as follows Activities Activity...

    Instructions Three Rivers Inc. provides cable TV and Internet service to the local community. The activities and activity costs of Three Rivers are identified as follows Activities Activity Cost 36,000.00 Biling error correction Cable signal testing 1,800.00 Reinstalling service (installed incorrectly the first time 8,00000 Repairing satellite equipment 7,800.00 Repairing underground cable connections to the customer 1700000 Replacing old technology cable with higher quality cable 169,000.00 ! Replacing old technology signal switches with higher quality switches 126,00000 9Responding to customer...

  • Pareto Chart and Cost of Quality Report for a Manufacturing Company The president of Mission Inc....

    Pareto Chart and Cost of Quality Report for a Manufacturing Company The president of Mission Inc. has been concerned about the growth in costs over the last several years. The president asked the controller to perform an activity analysis to gain a better insight into these costs. The result of the activity analysis is summarized as follows: Required: 1. Classify the activities into prevention, appraisal, internal failure, external failure, and not costs of quality (producing product). Classify the activities into...

  • Pareto chart and cost of quality report for a service company The administrator of Liberty Hospital...

    Pareto chart and cost of quality report for a service company The administrator of Liberty Hospital has been asked to perform an activity analysis of the emergency room (ER). The ER activities include cost of quality and other patient care activities. The lab tests and transportation are hospital services external to the ER for determining external failure costs. The result of the activity analysis is summarized as follows: Activities Patient registration Verifying patient information Assigning patients Searching/waiting for doctor Doctor...

  • I just need help with B&C I have the rest figured out. Cost of Quality and...

    I just need help with B&C I have the rest figured out. Cost of Quality and Value-Added/Non-Value-Added Reports for a Service Company Three Rivers Inc. provides cable TV and Internet service to the local community. The activities and activity costs of Three Rivers are identified as follows: a. Identify the cost of quality classification for each activity and whether the activity is value-added or non-value-added. Quality Control Activities Activity Cost Quality Cost Classification Value-Added/ Non-Value-Added Classification Billing error correction $40,900...

  • Pareto Chart and A report summarizing the costs, percent of total, and percent of sales by appraisal, prevention, internal failure, and external failure cost of quality categories.Cost of Quality Re...

    Pareto Chart and A report summarizing the costs, percent of total, and percent of sales by appraisal, prevention, internal failure, and external failure cost of quality categories.Cost of Quality Report for a Manufacturing Company The president of Mission Inc. has been concerned about the growth in costs over the last several years. The president asked the controller to perform an The study of employee effort and other business records to determine the cost of activities.activity analysis to gain a better...

  • Pareto Chart and Cost of Quality Report for a Manufacturing Company The president of Mission Inc....

    Pareto Chart and Cost of Quality Report for a Manufacturing Company The president of Mission Inc. has been concerned about the growth in costs over the last several years. The president asked the controller to perform an activity analysis to gain a better insight into these costs. The result of the activity analysis is summarized as follows: Activities Activity Cost Correcting invoice errors $15,960 Disposing of incoming materials with poor quality 13,300 Disposing of scrap 31,920 Expediting late production 26,600...

  • Pareto Chart and Cost of Quality Report for a Manufacturing Company The president of Mission Inc....

    Pareto Chart and Cost of Quality Report for a Manufacturing Company The president of Mission Inc. has been concerned about the growth in costs over the last several years. The president asked the controller to perform an activity analysis to gain a better insight into these costs. The result of the activity analysis is summarized as follows: Required: 1. Classify the activities into prevention, appraisal, internal failure, external failure, and not costs of quality (producing product). Classify the activities into...

  • Pareto Chart and Cost of Quality Report for a Manufacturing Company The president of Mission Inc....

    Pareto Chart and Cost of Quality Report for a Manufacturing Company The president of Mission Inc. has been concerned about the growth in costs over the last several years. The president asked the controller to perform an activity analysis to gain a better insight into these costs. The result of the activity analysis is summarized as follows: Required: 1. Classify the activities into prevention, appraisal, internal failure, external failure, and not costs of quality (producing product). Classify the activities into...

  • Pareto Chart and Cost of Quality Report for a Manufacturing Company The president of Mission Inc....

    Pareto Chart and Cost of Quality Report for a Manufacturing Company The president of Mission Inc. has been concerned about the growth in costs over the last several years. The president asked the controller to perform an activity analysis to gain a better insight into these costs. The result of the activity analysis is summarized as follows: Required: 1. Classify the activities into prevention, appraisal, Internal failure, external failure, and not costs of quality producing product) Classify the activities into...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT