Problem

Estimates of project costs and residual flood damages for six flood damage reduction plans...

Estimates of project costs and residual flood damages for six flood damage reduction plans are as follows:

Determine the benefit-to-cost ratio and net benefits for each plan for a 100-year pe­riod of analysis and discount rate of 8 percent. From an economic perspective, which plan is best?