For the manufacturing-system model of Sec. 2.7, estimate the expected overall average job time in system, being the weighted average of the expected times in system (delays in queue plus processing times) for the three job types, using the probabilities of occurrence of the job types as the weights. (Hint: You won’t need a computer to do this.)