Problem

The water supply for the golf course sprinkler system in Problem 4.34 was changed from the...

The water supply for the golf course sprinkler system in Problem 4.34 was changed from the supply pipeline to a pond and pump. The pump has the following characteristics:

The water surface elevation of the pond is 88.4 m (290 ft). The diameter and length of pipe 1 were changed to 152 mm (6.0 in.) and 305 m (1,000 ft). Compute the dis­charge at each sprinkler head.

Problem 4.34

A 15-pipe golf course sprinkler irrigation system is shown below. Elevation of the HGL for the water supply pipeline is 143.3 m (470 ft). Compute the discharge through each sprinkler head. There are 7 junction nodes and 9 fixed-grade nodes. Sprinkler heads are labeled A-H.

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search