Krypton Ltd.s budgeted information relating to the manufacture of two of its products is presented below: # of times driver

What would be the pre-determined overhead rate under a traditional costing model, with overhead allocated based on direct lab

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Ans:a.$3.28 is Correct Answer

Working:

Total labor hours = total labor cost / labour rate

= [348,243+529,565] / 11

= 79,800.73 labour hours

Overhead allocation rate

= total overhead cost / total labor hours

= [ 61,111+121,374+79,587] /79800.73

= $3.2841=$3.28 (If rounded off)

Add a comment
Know the answer?
Add Answer to:
Krypton Ltd.'s budgeted information relating to the manufacture of two of its products is presented below:...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Krypton Ltd.’s budgeted information relating to the manufacture of two of its products is presented below:...

    Krypton Ltd.’s budgeted information relating to the manufacture of two of its products is presented below: # of times driver used Activity Cost Driver Product A Product B Setup $56501 # of batches 30 10 Engineering $121204 # of engineering hours 6657 9224 Machine Maintenance $89140 # of machine hours 7000 12000 Direct labour cost $11/hour $352180 $528909 Direct materials $126718 $96026 What would be the pre-determined overhead rate under a traditional costing model, with overhead allocated based on direct...

  • Waymire Ltd. manufactures two products and currently allocates overhcad based on direct labour hours. For the...

    Waymire Ltd. manufactures two products and currently allocates overhcad based on direct labour hours. For the coming year, the company is considering changing to an activity based costing system by allocating overhead based on 3 activities. The estimated amount of overhead traceable to the 3 activities for the coming year are given below Activity Purchase orders Maintenance Machine Cost driver Cost #oforders $873069 347 Product I Product 2 599 19282 2198 $448164 18218 hours Inspection #of S704819 1736 inspections Total...

  • 2 sweredthe company has budgeted to produce 1718 units of one of its products. Each unit...

    2 sweredthe company has budgeted to produce 1718 units of one of its products. Each unit requires 2 hours of direct labour ut of Waymire Ltd. currently uses a traditional costing system based on direct labour hours to allocate overhead. This year For the coming year, the company is considering changing to an activity based costing system by allocating overhead based on 3 activities. The following are the activities, budgeted total cost and cost drivers per activity for the upcoming...

  • [The following information applies to the questions displayed below.] Knickknack, Inc. manufactures two products: Odds and...

    [The following information applies to the questions displayed below.] Knickknack, Inc. manufactures two products: Odds and Ends. The firm uses a single, plantwide overhead rate based on direct-labor hours. Production and product-costing data are as follows: Odds Ends Production quantity 1,000 units 5,000 units Direct material $ 40 $ 60 Direct labor (not including setup time) 30 (2 hr. at $15) 45 (3 hr. at $15) Manufacturing overhead 96 (2 hr. at $48) 144 (3 hr. at $48) Total cost...

  • Required information [The following information applies to the questions displayed below.] Knickknack, Inc. manufactures two products:...

    Required information [The following information applies to the questions displayed below.] Knickknack, Inc. manufactures two products: Odds and Ends. The firm uses a single, plantwide overhead rate based on direct-labor hours. Production and product-costing data are as follows: Odds $ Production quantity Direct material Direct labor (not including setup time) Manufacturing overhead 40 20 (2 hr. at $15) 96 (2 hr. at $48) 166 Ends 5,000 units $ 60 15 (3 hr. at $15) 144 (3 hr. at $48) $...

  • EcoFabrics has budgeted overhead costs of $954,450. It has allocated overhead on a plantwide basis to...

    EcoFabrics has budgeted overhead costs of $954,450. It has allocated overhead on a plantwide basis to its two products (wool and cotton) using direct labor hours which are estimated to be 454,500 for the current year. The company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. These two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). Overhead allocated to the...

  • i) Origin Company manufactures two products, Product A and Product B. Product B is a fairly...

    i) Origin Company manufactures two products, Product A and Product B. Product B is a fairly new product and is the more complex of the two products, requiring 3 hours of direct labour time per unit to manufacture compared to the 2 hours of direct labour time required for Product A. The company estimated it would incur $870,000 in manufacturing overhead costs and produce 15,000 units of Product B and 50,000 units of Product A during the current year. Unit...

  • Coronado Company produces two products: MB-R and MB-X. Currently, Coronado allocates overhead based on direct labour...

    Coronado Company produces two products: MB-R and MB-X. Currently, Coronado allocates overhead based on direct labour hours. Overhead is estimated at $436,800. The cost accountant realizes that there are some differences in how resources are being used in producing these two components and is considering the use of ABC to allocate overhead. She determines that overhead is caused by testing and inspections, $112,000; machine setup, $84,000; machine stamping, $200,000; and plant maintenance, $40,800. Coronado estimates the following activities related to...

  • Required information [The following information applies to the questions displayed below.] Knickknack, Inc. manufactures two products:...

    Required information [The following information applies to the questions displayed below.] Knickknack, Inc. manufactures two products: Odds and Ends. The firm uses a single, plantwide overhead rate based on direct-labor hours. Production and product-costing data are as follows: Odds $ Production quantity Direct material Direct labor (not including setup time) Manufacturing overhead 40 20 (2 hr. at $15) 96 (2 hr. at $48) 166 Ends 5,000 units $ 60 15 (3 hr. at $15) 144 (3 hr. at $48) $...

  • EcoFabrics has budgeted overhead costs of $1,039,500. It has allocated overhead on a plantwide basis cotton)...

    EcoFabrics has budgeted overhead costs of $1,039,500. It has allocated overhead on a plantwide basis cotton) using direct labor hours which are estimated to be 495,000 for the current year. The company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. These two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). Overhead allocated to the cutting cost pool is $396,000 and...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT