Q.1 : Setup time (hours/batch) = 1.417 Hour ((5+20+60)/60)
Q.2 : Setup time for 1 part when 1 part made in batch = 1.417 Hour ((5+20+60)/60)
Q.3 : Set up time for 1 part when 10000 part made in batch = 0.00014 Hour (1.417/10000)
Q.4 : Total Cycle Time = 0.108 Hour ((1+2.5+3)/60)
Q.5 : Total time per one part when 1 part is made = 1.525 Hour (Q2 Ans + Q.4 Ans)
Q.6 : Total time per one part when 10000 part is made= 0.108 Hour (1.417+(6.5*10000/60))/10000
Q.7 : Cost for one part to make -->Total time per one part when 1 part is made (Q.5) * 75 = $114.375 (1.525*75)
Q.8 : Cost to make one part when 1000 parts are made : Total Hours = 109.750 (1.417+6.5*1000/60)
Total Cost = 8231.27 (109.7503*75)
Cost for One part = 8.23 (8231.27/1000)
Q.9 : How long it take to make 10000 part : 1084.75 Hours (1.417+6.5*10000/60)
Q.10 : Option C is correct answer --> The cost per one part is lower when 10000 parts are made. in this case, the savings are made on account of set up time, which is much lower when averaged per one part
Problems 1-10 Now you have another piece of information - Table 1. It was either obtained...
Gordon Company produces custom-made machine parts. A setup activity is required for the batches of parts that it produces. Activity output is measured using setup hours. The value-added standard (SQ) for this activity is zero. On July 1, at the beginning of the fiscal year, 15 setup hours were allowed and used per batch. The standard wage rate for setup labor is $24 per setup hour. During the first quarter of the new fiscal year, the company is planning to...
A company has five machines (1 lathe, 2 mills and 2 drills) arranged sequentially to produce a batch of 200 parts. The following table lists the setup and work cycle times per piece for the five machines. 1. Delay hr) 10 10 10 10 10 Machine Setup time (hr. 2.50 1.25 1.50 0.50 0.75 (min) 15 27 12 1. Lathe 2. Milling (V) 3. Milling (H) 4. Drill (i) 5. Drill (ii) Management wants to procure a multitasking machine to...
The manager at FunQ, Inc collected the value stream mapping data from one of t manufacturing cell. This produces The data is shown in the below table. ll produces a special steel part that is widely used in automotive industries Average demand:180 units/day Batch size: 30 units Number of shifts per day: 1 Availability: 8-hours shift with including two 30 min breaks (60 min break time in total), 7 hours net available time Basic cell information Cycle time 140 sec...
please answer this i need it asap ill make sure to rate and give thumbs up! 1. A company has five machines (1 lathe, 2 mills and 2 drills) arranged sequentially to produce a batch of 200 parts. The following table lists the setup and work cycle times per piece for the five machines. Delay (hr) 10 10 10 10 10 Work cycle time (min) 15 27 12 Setup time (hr.) 2.50 1.25 1.50 0.50 0.75 Machine 1. Lathe 2....
The following table shows the manufacturing cost of each unit is calculated, using activity-based costing, for these manufacturing cost pools. Cost Pools Materials handling Manufacturing supervision Assembly Machine setup Inspection and testing Packaging Allocation Base Number of parts Hours of machine time Number of parts Each setup Logged hours Logged hours Costing Rate $ 3.00 per part $22.80 per hour $ 4.95 per part $46.60 per setup $35.00 per hour $25.00 per hour BSI currently sells the A-10 model for...
only question 3 Question #2 (15 Points) The result of a detailed study of setup procedure on a molding machine is shown in Table 1 below. The setup involved removing an old die and installing a new one. Tahle I InternalTime Performed by External?(min) Step# Setup 1 Check in at operation, go to die storage 2 Transfer new die 3 Remove old die 10 Setup person 16 Setup person 20 Setup person 20 Setup persorn 30 Operator 24 Setup person...
Part 1 of 2 Required information Upriver Parts manufactures two products, V-1 and V-2, at its River Plant. Selected data for an average month for the two products follow. 3.33 points Units produced Direct materials cost per unit Machine hours per unit Production runs per month V-1 10,000 $ 2 1 80 V-2 1,000 $ 4 2 40 eBook Production at the plant is automated and any labor cost is included in overhead. Data on manufacturing overhead at the plant...
1. You are going to open a business making custom cabinets. Using the data in the table, provide answers to the questions below. Cabinet Selling Price $ 84 Time to Make One Cabinet 30 minutes Labor Cost per Hour $ 18 Raw material Cost per Cabinet $ 28 Fixed Costs $ 5000 Desired Profit per Month $ 2000 What is your Contribution Margin? $--------- (two decimals) Cabinets to be made per month to Break Even? ----------- ~ cabinets\month Monthly Revenue...
Alpha Assemblies produces a wide variety of products in their central Nebraska facility. Many of these products fit within a line of standard truck and trailer parts. Within this is a set of hitches that can be made in two sizes (1-1/4 and 2) and three strengths (light duty, medium duty, and heavy duty). All of the hitches in this line have "natural" finishes so no additional steps are necessary after they are cast. The machine used to cast these...
An assembly operation is to be done in a single shift, 8 hours per day and 10% allowed for breaks (PF&D). The operators are expected to have an 85% performance and the following parts are required: Part X, requirement is 10,000 per week, at 100% one operator can produce 150 pieces per hour. Part Y, requirement is 15,000 per week, at 100% one operator can produce 220 pieces per hour. Part Z, requirement is 20,000 per week, at 100% one...