project has four activities (A, B, C, and D) that must be performed sequentially. The probability...
A project has four activities (A, B, C, and D) that must be performed sequentially. The probability distributions for the time required to complete each of the activities are as follows: Activity Time (weeks) 5 Activity A Probability 0.30 6 0.35 7 0.26 8 0.09 B 6 0.21 8 0.53 10 0.26 с 5 0.09 7 0.27 9 0.40 11 0.19 13 0.05 D 6 0.66 8 0.34 a. Provide the base-case, worst-case, and best-case calculations for the time to...
Problem 12-09 (Algorithmic) A project has four activities (A, B, C, and D) that must be performed sequentially. The probability distributions for the time required to complete each of the activities are as follows: Activity Activity Time (weeks) Probability A 6 0.29 7 0.38 8 0.27 9 0.06 B 3 0.21 5 0.53 7 0.26 C 6 0.06 8 0.26 10 0.37 12 0.22 14 0.09 D 11 0.63 13 0.37 Provide the base-case, worst-case, and best-case calculations for the...
Problem 12-09 (Algorithmic) A project has four activities (A, B, C, and D) that must be performed sequentially. The probability distributions for the time required to complete each of the activities are as follows: Activity Activity Time (weeks) Probability A 4 0.28 5 0.37 6 0.29 7 0.06 B 6 0.24 8 0.57 10 0.19 C 10 0.13 12 0.25 14 0.41 16 0.16 18 0.05 D 11 0.72 13 0.28 Provide the base-case, worst-case, and best-case calculations for the...
(All answers were generated using 1,000 trials and native Excel functionality.) A project has four activities (A, B, C, and D) that must be performed sequentially. The probability distributions for the time required to complete each of the activities are as follows: Activity Activity Time (weeks) Probability A 5 0.25 6 0.35 7 0.25 8 0.15 B 3 0.20 5 0.55 7 0.25 C 10 0.10 12 0.25 14 0.40 16 0.20 18 0.05 D 8 0.60 10 0.40 (a)...
A project has three activities A, B, and C that must be carried out sequentially, that is, A -> -> C. The probability distributions of the times required to complete each of the activities A, B, and C are uniformly distributed in intervals (1,6), (2,3) and (3,6) respectively. Find the total project completion time and run 1000 simulation trials in Excel. The "project completion time" is a(n)... Select one: O a. Input of the simulation O b. Decision variable in...
A project has three activities A, B, and C that must be carried out sequentially; that is, A -> -> C. The probability distributions of the times required to complete each of the activities A, B, and C are uniformly distributed in intervals (1,6], [2,3] and (3,6) respectively. Find the total project completion time and run 1000 simulation trials in Excel. The project completion time" is a(n)... Select one: O a. Input of the simulation b. Decision variable in the...
Answer next 3 questions using following information: A project has three activities A, B, and C that must be carried out sequentially. The probability distributions of the times required to complete each of the activities A, B, and C have uniform probability distribution in the following ranges:. Activity Completion Time A 1 to 5 B 2 to 3 C 3 to 6 Find the total project completion time and run 500 simulation trials in Excel. 1/ The “project completion time”...
For the following project with times to complete activities in weeks: ActivityDepend on a m b 1 3 6 2 3 6 3 79 2 23 34 5 B,C (a) Calculate the expected time and variance for each activity. Draw the project network (AOA). Determine the critical path, expected completion time and variance. (b) Determine the probability of finishing the project in 14 weeks or less. (c) You want to tell the client you are 95% sure the project will...
You are responsible for managing a project with the following activities (all times are given in weeks): Optimistic Most Likely Pessimistic Immediate Time Predecessor(s) Time Activity Time 4 C, D D, E 12 4 8 6 4 What is the expected time of completion of the project? (weeks) (Include 1 decimal place, e.g.,3.1.) abs What is the probability that the project will be completed in 24 weeks or less? (Provide ab 2 decimal places, no 90 sign, e.g., 2.12 for...
HOMEWORK ASSIGNMENT FOR PROJECT MANAGEMENT 13. An automation project has the following activities and related data Time (weeks)Crash Immed. Maximum Activity Prede- Opti- Most Cost/week Crashable Mean Varice cessors mistic (a) Likely (m) mistic (c (S1000) Weeks E(t) V(t) C A 5 D A 4 E B1 F B1 G C,D,E 2 6 6 HF2 12 15 3 13a. (5 points) Compute the mean and variance of each activity and record them on the table above. 13b. (5 points) Develop...