Question

400 points DataSpan, Inc, automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations Month Throughput time (days) Delivery cycle time (days) Manufacturing cycle eficiency (MCE) Percentage of on-tme deliveries Total sales (unts) 76% 77% 82% 89% 0,58010,580 10,440 10.550 Management has asked for your help in computing throughput time, delivery cycle time, and MCE. The folowing average times have been logged over the last four months Average per Month in days) 07 Move tme per unt Process sime per unt Wat sme per order before start of production Queue time per unit Inspection time per unit 0.7 0.4 07 0.5 0506 07 10.0 37 4.0 1.7 8.0 5.0 4.0 2.6 0504070.7

Required 1-a. Compute the throughput time for each month. (Round your answers to 1 decimal place.) Month 1 Month 2 Month 3 Month 4 Throughput Time days days days days 1-b. Compute the manufacturing cycle efficiency (MCE) for each month. (Round your answers to 1 decimal place.) Manufacturing Cycle Etficiency (MCE) Month 1 Month 2 Month 3 Month 4 1-c. Compute the delivery cycle time for each month. (Round your answers to 1 decimal place.) Delivery Cycle Time Month 1 Month 2 Month 3 Month 4 days days days days

3-a. Refer to the move time, process time, and so forth, given for month 4 Assume that in month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the company is able to completely eliminate the queue lime during production Compute the new throughput time and MCE (Round your answers to 1 decimal place.) Month Throughput time days Manufacturing cycle efficiency (MCE) 3-b. Refer to the move time, process time, and so forth, given for month 4 Assume in month 6 that the move time, process time, and so forth, are again the same as in month 4, except that the company is able to completely eliminate both the queue time during production and the inspection tme. Compute the new throughput time and MCE. (Round your answers to 1 decimal place.) Month 6 Throughput tme Manufacturing cycle efficiency (MCE) days

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1-a.

Throughput time = Process time + Inspection time + Move time + Queue time

Month

1

2

3

4

Move time per unit

0.7

0.7

0.4

0.7

Process time per unit

0.5

0.5

0.6

0.7

Queue time per unit

3.7

4

2.6

1.7

Inspection time per unit

0.5

0.4

0.7

0.7

Throughput time (in days)

5.4

5.6

4.3

3.8

1-b.

Manufacturing Cycle Efficiency (MCE) = Process time/ Throughput time

Month

1

2

3

4

Process time per unit

0.5

0.5

0.6

0.7

÷Throughput time

5.4

5.6

4.3

3.8

MCE

9.3%

8.9%

14.0%

18.4%

1-c.

Delivery cycle time = Wait time + Process time + Inspection time + Move time + Queue time

Month

1

2

3

4

Wait time

10.0

8.0

5.0

4.0

Move time per unit

0.7

0.7

0.4

0.7

Process time per unit

0.5

0.5

0.6

0.7

Queue time per unit

3.7

4

2.6

1.7

Inspection time per unit

0.5

0.4

0.7

0.7

Delivery cycle time(in days)

15.4

13.6

9.3

7.8

3-a.

Month 5

Move time per unit

0.7

Process time per unit

0.7

Inspection time per unit

0.7

Throughput time (in days)

2.1

Month 5

Process time

0.7

÷Throughput time

2.1

MCE

33.3%

3-b.

Month 6

Move time per unit

0.7

Process time unit

0.7

Throughput time (in day)

1.4

Month 6

Process time unit

0.7

÷Throughput time

1.4

MCE

50.0%

Add a comment
Know the answer?
Add Answer to:
400 points DataSpan, Inc, automated its plant at the start of the current year and installed...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...

    DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month Throughput time (days) Delivery cycle time (days) Manufacturing...

  • DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...

    DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month 1 2 3 4   Throughput time (days) ?...

  • DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...

    DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations, Month 34 Throughput time (days) Delivery cycle time (days)...

  • DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...

    DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month نية Throughput time (days) Delivery cycle time (days)...

  • DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...

    DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month 1 2 3 ? Throughput time (days) Delivery...

  • DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...

    DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month 2 1 Throughput time (days) Delivery cycle time...

  • DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...

    DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month 1. 4. ? 3 ? > Throughput time...

  • DataSpan, Inc. automated its plant at the start of the current year and installed a flexible...

    DataSpan, Inc. automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Throughout te (days) Delivery cycle time (days) Manufacturing cycle...

  • DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...

    DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Problem 10-14 Measures of Internal Business Process Performance (LO10-3]...

  • DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...

    DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month ? Throughput time (days) Delivery cycle time (days)...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT