how all necessary computations ebuleli textile produces denim jeans. Jebuleli believes that approximately 99.74% of the variability in the production and thus should be within control limits. The company has taken 10 samples (one per day for 10 days), each containing 100 pairs of jeans, and inspected them for defects. Number of Sample Defectives 10 0 14 10 15 14 12 10 10 The proportion defective for the population is not known. The company wants to construct a chart to determine when the production process might be out of control. . Show all necessary computations i. Draw an appropriate control chart and depict the points on the chart ii Comment on the distribution of the sample points.
0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
As much as possible I need a clear way of doing this question. Clarify for me...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • Judy Holmes Industries has decided to use a p-Chart to monitor the proportion of defective castings produced by their production process. The control limits on these charts will be designed to include...

    Judy Holmes Industries has decided to use a p-Chart to monitor the proportion of defective castings produced by their production process. The control limits on these charts will be designed to include 95%95% of the sample proportions when the process is In Control. The operations manager randomly samples 400400 castings at 1616 successively selected time periods and counts the number of defective castings in the sample. Table Control Chart Copy Table Step 8 of 8 :   You, acting as the...

  • What is a control chart? What are its main features and how is it used? I...

    What is a control chart? What are its main features and how is it used? I included the definition of a control chart so there isn't any confusion. Please include an explantion in your own words. Control Chart Assuming production engineers have gotten everything to work such that the process conforms to specifications (the average of the process is close to the target value and the variability [standard deviation] is very small), after that they have to ensure that the...

  • The data shown in the table below are i and R values for 24 samples of...

    The data shown in the table below are i and R values for 24 samples of size n-5 taken from a process producing bearings. The measurements are made on the inside diameter of the bearing. with only the last three decimals recorded (fi.e., 34.5 should be 0.50345). Sample i Number Sample R Number 13 14 15 16 17 18 19 20 21 35.4 34.0 37.1 34.9 33.5 31.7 34.0 35.1 33.7 32.8 33.5 345 34.2 31.6 315 35.0 34.1 32.6...

  • I already have calculated for question #4 and got these numbers xdouble bar=28.07 UCL=29.08 LCL=27.08 ,Rbar=1.74,...

    I already have calculated for question #4 and got these numbers xdouble bar=28.07 UCL=29.08 LCL=27.08 ,Rbar=1.74, UCL=3.67, LCL=0 Sample Size=5 Continuing on from question #4, the employee continues to track the same data for 10 weeks after the supplier change, and gets the following data: Sample data: 1 2 3 4 5 6 7 8 9 10 Mean 27.8 28.9 27.4 28.7 28.0 27.1 27.2 27.3 28.0 27.4 Range 2.3 1.5 3.0 2.1 3.2 2.2 3.6 2.0 3.4 1.7 The...

  • Aitehicles at one location keeps track of the mumber out- of service each day (see VEHICLE)....

    Aitehicles at one location keeps track of the mumber out- of service each day (see VEHICLE). Out of service is use for four or more hours Number Out of Service Proportionn 248 0.004 248 10 0.012 248 0.008 0024 248 15 16 0.032 19 0.016 the centerline and control limits for the appropriate control chart b. Are there any indications of a lack o a lack of control? onstant 224 Part Two Tools and Meshods olytc Sis Exercises afcturer of...

  • QUESTION 11 10)-12) A factory supervisor is concerned that the time it takes workers to complete...

    QUESTION 11 10)-12) A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor proceeds by randomly sampling 5 individuals per hour for a period of 10 hours. The sample mean and range for each hour are listed below. Hour X R 1 18.4 30 2 16.9 27 3 14.0 25 4 21.2 25 5 21.0 24 6 33.0 23 7...

  • Please help me with this- I REALLY NEED IT RIGHT NOW

    3) The quality control department of a tire manufacturer randomly selects a number ofproducts from two production lines and records the results in the following table:Durability (thousand km)       < 50 50 – 55 55 - 60 60 - 65 >= 65Line A 7 13 30 20 10Line B 10 15 40 9 6a) Construct a 90% confidence interval for the difference in average durability ofproducts of two lines A and B.b) At the 5% level of significance, can...

  • 8. If a line is balanced with 80 percent efficiency, the "balance delay" will be: 20 percent. B. 80 pe...

    8. If a line is balanced with 80 percent efficiency, the "balance delay" will be: 20 percent. B. 80 percent. C. 100 percent. D. unknown, since balance delay is not related to efficieney. E. depends on the next operation. 9. A common goal in designing process layouts is: A. minimizing the number of workers. B. minimizing number of machines. minimizing transportation costs. maximizing workstation productive time E. maximizing transportation distances. 07) vnit 10. The maximum allowable cycle time is computed...

  • (I did this homework in completion but professor was not happy with answers whatsoever, need additional...

    (I did this homework in completion but professor was not happy with answers whatsoever, need additional answers and especially improvement to 1.b help!! photos not attaching? mean by severai steps. inis is a View Feedback homework and will need you to work, in one two View Feedback or various steps. Unfortunately, I cannot read your screen shot of what you did on excel. As I have said in numerous messages announcements etc, I cannot аcсept pictures. You need to write...

  • I need Summary of this Paper i dont need long summary i need What methodology they used , what is the purpose of this p...

    I need Summary of this Paper i dont need long summary i need What methodology they used , what is the purpose of this paper and some conclusions and contributes of this paper. I need this for my Finishing Project so i need this ASAP please ( IN 1-2-3 HOURS PLEASE !!!) Budgetary Policy and Economic Growth Errol D'Souza The share of capital expenditures in government expenditures has been slipping and the tax reforms have not yet improved the income...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT