Linear program is following:
Let W1, W2, W3 be the number of Wrenches to be produced in Regular-time, Overtime and Subcontracting respectively
C1, C2, C3 be the number of Chisels to be produced in Regular-time, Overtime and Subcontracting respectively
Objective: Min 2W1+2.8W2+3W3+2.1C1+3.2C2+4.2C3
s.t.
W1+W2+W3 >= 1500
C1+C2+C3 >= 1200
C1+C2+C3 >= 2(W1+W2+W3)
or, C1+C2+C3-2W1-2W2-2W3 >= 0
W1 <= 550
W2 <= 250 (=800-550)
C1 <= 620
C2 <= 280 (=900-620)
All variables >= 0
Please solve it hand written no excel The refinery has U kerosene, and 650,000 barrel a)...
(Blending & Refining LP optimization problem) American Oil of Middle East has a refinery in Kuwait. This refinery has access to two types of crude oils that come from Wafra Field: Ratawi Crude and Eocene Crude. The daily availability for Ratawi Crude and Eocene Crude are 300,000 bbl per day and 200,000 bbl per day, respectively. The Ratawi Crude costs the company $15 per bbl, and the Eocene Crude costs $20 per bbl. The refinery distills the crude oils and...
AGGREGATE PLANNING
Garden Hub makes a single product, a garden tool that sells for
$40. Garden Hub starts with 1000 of these tools in inventory and is
expected to end with at least 500 in stock. Garden Hub can
temporarily backlog demand for a cost, but at the end of the time
horizon, they require their backlog to be zero – This is an
important constraint to remember- if we forget it, we will get
strange results . Production costs...