All the parts have been done as shown.
(a) Allan's job shop takes order for making spare parts for textile manufacturing equipment. The operation...
A local welding shop has the following jobs to schedule. Each job needs cleaning first for performing welding . How much will be total makespan time. ( Use Johnson's scheduling rule) Job Cleaning (Hours) Welding( Hours) Job Cleaning Welding a 3 1 b 5 5 c 2 6 answers: A.12 B. 11 C.14 D.15
Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows: JOB OPERATION 1 (HOURS) OPERATION 2 (HOURS) A 4 8 B 10 5 C 3 11 D 14 14 E 6 1 F 7 12 a. Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Job 1 ? 2 ? 3 ? 4 ? 5 ? 6 ? b. For the schedule developed...
please answer this ABC's machine shop is considering the use of priority scheduling rule in the fabrication shop and must decide whether to use: a. Critical ratio (CR) Earliest due date (EDD) C. Shortest operation next (SON)/Shortest processing time 9SPT) d. Order Slack Order No. Total Remaining Time Remaining Current operation Manufacturing until Due Date Processing time Time (days) (days) (days) А 12 15 10 14 D 18 15 19 Using the four sequencing rules, compute the scheduling priority for...
Chapter 10: Currently a company that designs Web sites has five customers in its backlog. The time since the order arrived, processing time, and promised due dates are given in the following table. Job Time Since Order Arrived (days ago) Processing Time (days) Due Date (days from now) A 6 18 66 B 3 24 58 C 2 32 80 D 10 22 26 E 8 12 50 Create a schedule using the first-come first-serve (FCFS) rule, calculating the average...
Question 20, Math problem 20. The Mowry Machine Shop still has five jobs to be pro- cessed as of 8 A.M. today (day 23) at its bottleneck opera- tion. The day when the order arrived, processing time, and promised due dates are given in the following table. The jobs are listed in the order of arrival. Time Since Order Arrived (days ago) Processing Time (days) Due Date (days from now) Job А 11 10 22 10 8 В 13 8...
3. [Challenging Question - Scheduling for Rescuing Scuba Divers (20 pts)] Tom Cruise has worked as an operations manager of Underwater Treasure Discovery Company in Miami, FL and recently he was assigned to make a schedule to dispatch deep-water robots to save five scuba divers needing urgent rescue out of danger under the deep sea. He must do a very brief assessment of how urgent each diver appears and need to determine the best sequence to save all five scuba...
Create a cause and effect diagram for the following case: Case Study Eastern Gear,Inc.: Job Shop Eastern Gear, Inc., in Philadelphia, Pennsylvania, is a manufacturer of custom-made gears ranging in weight from a few ounces to over 50 pounds. The gears are made of different metals, depending on the customer's requirements. Over the past year, 40 different types of steel and brass alloys have been used as raw materials. See Exhibit 1 for details. be necessary to stop production and...