Question

Six jobs are to be processed through a​ two-step operation. The first operation involves​ sanding, and...

Six jobs are to be processed through a​ two-step operation. The first operation involves​ sanding, and the second involves painting. Processing times are as​ follows:

JOB OPERATION 1 (HOURS) OPERATION 2 (HOURS)
A 4 8
B 10 5
C 3 11
D 14 14
E 6 1
F 7 12

a. Using​ Johnson's rule for​ 2-machine scheduling, the sequence​ is:

Scheduled Order Job
1 ?
2 ?
3 ?
4 ?
5 ?
6 ?

b. For the schedule developed using Johnson's rule, the total length of time taken to complete the six jobs (including the 2nd operation) = _______ hours (enter. your response as a whole number)

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer:

a. C A F D B E

b. 54

Explanation:

As per Johnson's rule, first we need to identify the job with the shortest processing time (SPT) , if SPT is for Operation 1 then we need to schedule it as early as possible and if SPT is for Operation 2 then we need to schedule it as late as possible.

Job Operation 1 Operation 2 Scheduled Order 1 Operation 1 Operation 1 Start time End time Operation 2 Operatio 2 Start time E

Operation 1 Start time for Job 1 = 0

Operation 1 End time for Job 1 = Start time + Operation 1 duration

Operation 2 Start time for Job 1 = Operation 1 End time for Job 1

Operation 2 End time for Job 1 = Operation 2 Start time for Job 1 + Operation 2 Duration

Operation 1 Start time for Job i+1 = Operation 1 End time for Job i

Operation 1 End time for Job i+1 = Operation 1 Start time for Job i+1 + Operation 1 Duration for Job i+1

Operation 2 Start time for Job i+1 = Max(End time of Operation 2 for Job i, End time of Operation 1 for Job i+1)

Operation 2 End time for Job i+1 = Operation 2 Start time for Job io+1  + Operation 2 Duration for Job i+1

Last Scheduled Job E will be completed at the end of 54th hour.

Add a comment
Know the answer?
Add Answer to:
Six jobs are to be processed through a​ two-step operation. The first operation involves​ sanding, and...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • please explain every step Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Six...

    please explain every step Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows: Job Job Operation 1 (hours) 10 Operation 2 (hours) H TO For the schedule developed using Johnson's rule, the total length of time taken to complete the six jobs (including the 2nd operation) =1 hours (enter your response as a...

  • n 10 The following set of jobs must be processed ed serially through a two-step system....

    n 10 The following set of jobs must be processed ed serially through a two-step system. The times at out of each process are in hours. If Johnson's Rule is used to sequence the jobs then Job A would complete processing on operation 2 at Job Process Process 2 A 12 9 B 11 C 7 6 D 10 14 E 5 8 Select one: A. hour 38. LO A 12 8 11 C 7 6 D 10 14 E...

  • Determine the processing sequence for the five jobs to be processed on the two work centers...

    Determine the processing sequence for the five jobs to be processed on the two work centers shown below using Johnson's Rule. What is the total throughput time. Show your work. Job Center1 Center2 A 6 7 B 10 9 C 12 8 D 5 11 E 13 4

  • A local welding shop has the following jobs to schedule. Each job needs cleaning first for...

    A local welding shop has the following jobs to schedule. Each job needs cleaning first for performing welding . How much will be total makespan time. ( Use Johnson's scheduling rule) Job Cleaning (Hours) Welding( Hours) Job Cleaning Welding a 3 1 b 5 5 c 2 6 answers: A.12 B. 11 C.14 D.15

  • Each of the jobs listed in the table below must be processed first at Work Center...

    Each of the jobs listed in the table below must be processed first at Work Center 1 and then at Work Center 2. Use Johnson's rule to determine the sequence in which to process the jobs Job WC#1 WC#2 20 A 27 40 18 23 31 25 D 35 The first job in the sequence should be The second job in the sequence should be The third job in the sequence should be The fourth job in the sequence should...

  • (a) Allan's job shop takes order for making spare parts for textile manufacturing equipment. The operation...

    (a) Allan's job shop takes order for making spare parts for textile manufacturing equipment. The operation milling and involves first milling and then finishing. Table Q4(a) presents the data of processing times for each job. (i) Determine the sequencing rule using First Come First Serve (FCFS) and Johnson's Rule. (4 marks) (ii) Make a work schedule on a Gantt chart using FCFS rules indicating the makespan. (6 marks) (iii) Make a work schedule on a Gantt chart using Johnson's rules...

  • Question 2 3 pts Per Johnson's rule - If a job has to go through two...

    Question 2 3 pts Per Johnson's rule - If a job has to go through two machines: First for 3 hours on Welding and then 4 hours on Painting - and if the 3 hours was the shortest processing time of all jobs going through these operations, I would: Schedule this job as late as possible Schedule this job as early as possible

  • 3. Consider the following seven-job problem. Each job must be processed by two ma chines A...

    3. Consider the following seven-job problem. Each job must be processed by two ma chines A and B, first on machine A and then machine B. The operation processing times at machine A and B are as follows: Job i 1 2 3 5 6 Processing time on machine A (a9 8 5 10 6 8 5 Processing time on machine B (b) 6 5 7912 11 4 a. Suppose jobs arrived in their natural order (i.e, job before job...

  • decimal places). An Alabama lumberyard has four jobs on order, as shown in the following table....

    decimal places). An Alabama lumberyard has four jobs on order, as shown in the following table. Jobs are logged as they arrive. Today is day 1 on the yard's schedule. In what sequence would the jobs be ranked according to the decision rules on the left: % (enter your response as a percentage The percentage utilization for the sequence developed using the EDD rule = rounded to two decimal places). Job Work (Processing) Time (Days) Job Due Date (Days) d)...

  • Using the FCFS (first come, first served) decision rule for sequencing the jobs, the order is:...

    Using the FCFS (first come, first served) decision rule for sequencing the jobs, the order is: The following jobs are waiting to be processed at Rick Solano's machine center. Solano's machine center has a relatively long backlog and sets a fresh schedule every 2 weeks, which does not disturb earlier schedules. Below are the jobs to be scheduled today, which is day 241 (day 241 is a work day). Job names refer to names of clients and contract numbers. Compute...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT