Question

Question 2 3 pts Per Johnsons rule - If a job has to go through two machines: First for 3 hours on Welding and then 4 hours
0 0
Add a comment Improve this question Transcribed image text
Answer #1

The correct option would be Schedule this job as early as possible.

Johnson's rule is a method of scheduling jobs in two work centers. Its primary objective is to find an optimal sequence of jobs to reduce makespan (the total amount of time it takes to complete all jobs). It also reduces the amount of idle time between the two work centers. The method minimizes the makespan in the case of two work centers. Furthermore, the method finds the shortest makespan in the case of three work centers if additional constraints are met.

Add a comment
Know the answer?
Add Answer to:
Question 2 3 pts Per Johnson's rule - If a job has to go through two...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • please explain every step Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Six...

    please explain every step Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows: Job Job Operation 1 (hours) 10 Operation 2 (hours) H TO For the schedule developed using Johnson's rule, the total length of time taken to complete the six jobs (including the 2nd operation) =1 hours (enter your response as a...

  • Six jobs are to be processed through a​ two-step operation. The first operation involves​ sanding, and...

    Six jobs are to be processed through a​ two-step operation. The first operation involves​ sanding, and the second involves painting. Processing times are as​ follows: JOB OPERATION 1 (HOURS) OPERATION 2 (HOURS) A 4 8 B 10 5 C 3 11 D 14 14 E 6 1 F 7 12 a. Using​ Johnson's rule for​ 2-machine scheduling, the sequence​ is: Scheduled Order Job 1 ? 2 ? 3 ? 4 ? 5 ? 6 ? b. For the schedule developed...

  • A local welding shop has the following jobs to schedule. Each job needs cleaning first for...

    A local welding shop has the following jobs to schedule. Each job needs cleaning first for performing welding . How much will be total makespan time. ( Use Johnson's scheduling rule) Job Cleaning (Hours) Welding( Hours) Job Cleaning Welding a 3 1 b 5 5 c 2 6 answers: A.12 B. 11 C.14 D.15

  • (a) Allan's job shop takes order for making spare parts for textile manufacturing equipment. The operation...

    (a) Allan's job shop takes order for making spare parts for textile manufacturing equipment. The operation milling and involves first milling and then finishing. Table Q4(a) presents the data of processing times for each job. (i) Determine the sequencing rule using First Come First Serve (FCFS) and Johnson's Rule. (4 marks) (ii) Make a work schedule on a Gantt chart using FCFS rules indicating the makespan. (6 marks) (iii) Make a work schedule on a Gantt chart using Johnson's rules...

  • Job А 3. The jobs listed below needed to be completed. Assume that it is now...

    Job А 3. The jobs listed below needed to be completed. Assume that it is now day 140. Processing Time (days) Due Date 20 180 30 200 10 175 230 210 B с D 16 18 E If the jobs are sequenced according to shortest processing time rule, what is the average completion time? A. 47.6 B. 60 C. 50 D. 238 E 300 4. Given the data from question 3, if the jobs are sequenced according to the longest...

  • 3. Consider the following seven-job problem. Each job must be processed by two ma chines A...

    3. Consider the following seven-job problem. Each job must be processed by two ma chines A and B, first on machine A and then machine B. The operation processing times at machine A and B are as follows: Job i 1 2 3 5 6 Processing time on machine A (a9 8 5 10 6 8 5 Processing time on machine B (b) 6 5 7912 11 4 a. Suppose jobs arrived in their natural order (i.e, job before job...

  • 3. [Challenging Question - Scheduling for Rescuing Scuba Divers (20 pts)] Tom Cruise has worked as...

    3. [Challenging Question - Scheduling for Rescuing Scuba Divers (20 pts)] Tom Cruise has worked as an operations manager of Underwater Treasure Discovery Company in Miami, FL and recently he was assigned to make a schedule to dispatch deep-water robots to save five scuba divers needing urgent rescue out of danger under the deep sea. He must do a very brief assessment of how urgent each diver appears and need to determine the best sequence to save all five scuba...

  • ACCT 2113 Chapter 2 Job Order Cost Problem Hi Gloss Printing Company uses a job order...

    ACCT 2113 Chapter 2 Job Order Cost Problem Hi Gloss Printing Company uses a job order cost system. The following data summarize the operations related to production for June, the first month of operations: a. (Pts. 4) Materials purchased on account, $43,500. b. (Pts. 18) Materials requisitioned and factory labor used, use one entry for materials and a separate entry for factory labor: Materials Factory Labor Job 101 $9,000 $5,700 Job 102 3,175 2,890 Job 103 5,200 3.100 Job 104...

  • An assembly line has three operations in sequence.  The work-centers take 5, 3, and 2 minutes per...

    An assembly line has three operations in sequence.  The work-centers take 5, 3, and 2 minutes per job. (So job 1 enters the first work-center, where it takes 5 minutes; then it is moved to the second work center where it takes 3 minutes while job 2 enters the first work-center, etc.) In the above line, if the second work-center operation time is reduced by ten percent, what is the throughput of this line (as number of jobs completed per hour...

  • The three-station work cell illustrated in the figure below has a product that must go through...

    The three-station work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. a) The bottleneck time of the system is 6 minutos per unit (onitor your response as a whole number). b) Station 3 is the bottleneck station c) The throughout time is 13 minutes (onter your response as a whole number). d) If the firm operates 8 hours per...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT