1. Option B 375 E's
1. Produce one product of X we need 2 product of D and 3 products of C. Each product of D required 3 materials of E and Each Product of C required 3 Materials of E
One Product of X required = 3 * 3 + 2 * 3 = 15 Metrails of E
Thus to Produce 25 Product of X = 25 * 15 = 375 E's
2. Option D. 2.4 Hours
Number of Hours in a day * Safety Factor * Number of Hours to Fill and Use
8 * 15% * 2
= 2.4 Hours
03-Consider the product structure tree shown below: D(2) C(3) A(2) E(3) B(2) E(3) A(3) With a...
1. Consider the following product structure: Each A consists of 2 B's and 1 C. Each B consists of 3 D's and 2 E's. Each C consists of 4 D's and 2 E's. How many D's are necessary to produce 400 A's? a) 1600 b) 2400 c) 4000 d) 2000 e) 400 The XYZ Company has just hired you as Production Manager of their North American Fabrication Facility. Your first job is to use the MRP methodology to schedule production...
Part 1What is the major product of the following reaction? a. 2-ethyl-1-pentene b.(E)-4-methyl-3-hexene c.(E)-3-methyl-2-hexene d. (Z)-3-methyl-2-hexene Part 2 What alkyl chloride gives the following as the only product upon treatment with a strong base? a. b. c. d. Part 3 Give the major product for the following E1 reaction. a. b. c. d. e. CH3 CH3CO Br CH3
3. (30 points) Consider the BOM tree of a sub-assembly, namely A. Land time (LT) consists of estimates for setup time, processing time, materials handling time between operations or waiting time, depending on the item type. Items (B,C,D,E,F,G) belong to one of the followings: raw materials, purchased parts of manufactured parts. LT is given in terms of weeks. Suppose that there is no on-hand inventory and no scheduled receipts for all items. How many units of items E, D, and...
F 2 А B C D E 1 CHAPTER 12: Lab 2 The Rushton Trash Company stocks, among many other products, a certain container, each of which occupies four square feet of warehouse space. The warehouse space currently available for storing this product is limited to 600 square 6 feet. Demand for the product is 15,000 units per year. Holding costs are $4 per container per year; Ordering costs are $5 per order. 5 7 8 9 10 Build an...
Product A needs 3 components of B and 2 components of C. Component B on the other hand needs 2 units of component C and E. Component C requires a unit of D, and 3 components of E. Component D on the other hand requires 5 units of E. Lead time is 2 weeks. The company expects to deliver 100 units of A on the 3rd week, 250 units on the 5th week, and 500 units on the 8th week....
Match the peaks labeled A,B,C,D,E to the Diels-Adler product and what part of the products structure creates each peak on the NMR graph. 3.60 3.58 3.56 3.54 3.52 f1 (ppm) 3.50 3.48 3.46 C (dd) 7.34 7.45 7.40 7.35 7.30 7.25 i (ppm) 7,20 7.15 7.10 B (dd) A (dt) 7.39 7.20 D (t) 4.83 E (dd) 3.53 T T 1.98 1.93 4.00 2.09 2.01 .8 7.6 7.4 7.2 7.0 6.8 6.6 6.4 6.2 6.0 5.8 5.6 5.4 f1 (ppm)...
3/4 d) Draw the structure of the MINOR product below. No mechanism needed here. (2 pts) 7) Draw the mechanism of the elimination reaction below (6 pts) EN (1 pt) b) What is the name of the specific mechanism of the reaction? c) What is being eliminated in the reaction? (2 pts) 8) A molecule in the conformation shown below undergoes the same type of elimination reaction as the previous problem. Draw the product of the reaction in full line...
E) [Ar]3d04s44p 2) How many lone pairs of electrons are on the O atom in OF2? A) 0 B) 1 C) 2 D) 3 3) Which atom in each group (I and II) has the smallest atomic radius? (I) Ca, Ti, Br (II) O, S, Se A) Ca; Se B) Br; Se C) Br; O D) Ca; O 4) How many valence electrons are there in a Bi atom? A) 2 B) 3 C) 4 D) 5 E) 6 5)...
Question 5 Which structure represents (E)-1-bromo-2-methylhex-2-ene? C) Br Br 01. C 2.B 3.D. 4. A
Using the BOM shown below, 2 weeks B (4) 1 week C (4) 1 week D(4) 2 weeks F(4) E (2) 4.9 weeks C(4) 1 week E (2) 4.9 weeks 5.9 weeks a. How many of part E will be needed if 24 units of end item A are needed? Number of parts needed b. How many part Cs will be needed? Number of parts needed