Question

3. (30 points) Consider the BOM tree of a sub-assembly, namely A. Land time (LT) consists of estimates for setup time, proces
0 0
Add a comment Improve this question Transcribed image text
Answer #1
  • You had not provided with your student ID, Hence I will proceed with Value X. At the last use your student ID (sum of all digits) in the place of X and multiply with the corresponding figures. (Example: if your student ID = 2345, the sum of all digits of ID =14. Let D=4X then replace X=14. D=4*14=56units)
  • We need to find the quantities for E, D & G
  • Here 1,2,3,4 after month indicates a particular week of the month
  • For a better understanding of the solution, I had to provide the complete planned order release schedule for each and every item

Qty req for Ea unit Lead time of A Remarks B C 3 2 13 4 3 Qty-3 for B, Qty -01 for C 6 6 Qty-02 for Each B(3*2=6) 1 1 I 3 FB Mar 1 C Mar 3 END PRODUCT=A 2 Lead Time = 1 Week 3 Gross Requcements 4 Planned order Resents 5 Planned order Releases D Mar21 Gross Requirements for D= 4x:Requirements for item Dis X till Apr 1 week for C and 3X for B in Apr 2 week. It is given in

Qty of items to order/ produce, Month and Week for order release:

D = 4*X, March 2 week

E=6*X, February 4 week

G= X, March 1 week

Note: Here X = sum of digits of student ID

Please like the answer, Thank you.

Add a comment
Know the answer?
Add Answer to:
3. (30 points) Consider the BOM tree of a sub-assembly, namely A. Land time (LT) consists...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Assume that you are the manager of Assembly, Inc. You have just received an order for...

    Assume that you are the manager of Assembly, Inc. You have just received an order for 27 units of an industrial robot, which is to be Using the following information, determine how many units of subassembly G to order and the timing of those orders, given that subassembly G must be ordered in multiples of 80 units and all other components are ordered lot-for-lot. Assume that the components are used only for this particular robot. Lead Time (weeks) On Hand...

  • Assume that you are the manager of Assembly, Inc. You have just received an order for...

    Assume that you are the manager of Assembly, Inc. You have just received an order for 23 units of an industrial robot, which is to be delivered at the start of week 7 of your schedule. Using the following information, determine how many units of subassembly G to order and the timing of those orders, given that subassembly G must be ordered in multiples of 80 units and all other components are ordered lot-for-lot. Assume that the components are used...

  • Recently, Phil Harris, the production control manager at Brunswick, read an article on time phased requirements...

    Recently, Phil Harris, the production control manager at Brunswick, read an article on time phased requirements planning. He was curious about how this technique might work in scheduling Brunswick's engine assembly operations and decided to prepare an example to illustrate the use of time-phased requirements planning. Phil's first step was to prepare a master schedule for one of the engine types produced by Brunswick: the Model 1000 engine. This schedule indicates the number of units of the Model 1000 engine...

  • Analytics Exercise 9-1 Recently, Phil Harris, the production control manager at Brunswick, read a...

    Analytics Exercise 9-1 Recently, Phil Harris, the production control manager at Brunswick, read an article on time-phased requirements planning. He was curious about how this technique might work in scheduling Brunswick's engine assembly operations and decided to prepare an example to illustrate the use of time phased requirements planning.      Phil's first step was to prepare a master schedule for one of the engine types produced by Brunswick: the Model 1000 engine. This schedule indicates the number of units of the...

  • OBLEM ONE (30 POINTS) Wombat International operates a major assembly facility in Oolitic, Indiana. The primary...

    OBLEM ONE (30 POINTS) Wombat International operates a major assembly facility in Oolitic, Indiana. The primary product assembled at their Oolitic facility is the "A." Here is the Bill of Materials for the "A:" c(2) D(2) Here is additional inventory data about the items mentioned above: Lead Time Lot-Sizing Rule Lot-for-lot Scheduled Receipts Beginning!nventory 10 20 SKU none Lot-for-lot 40(week 1) none 100 Finally, here is the Master Production Schedule for the current planning window: Week Units of A 40...

  • supply chain question, please solve it anyone.

    There are two (2) Parts to this case.  The First part (Part 1) requires you to use the information to:1.    Build a Bill of Material (BOM) form the given information2.    Determine the Master Production Schedule (MPS) and3.    Complete the MRP for all parts including the product.   The Second Part (Part 2) will require you to use an indexed BOM to 1.    Create the correct MPS from the provided information2.    create the MRP for the unit and all of its assemblies/components Part 1:...

  • Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a system unit, a...

    Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a system unit, a keyboard, and an installation kit. These pieces are packed together and shipped as a complete kit. In MRP terms, all of these items are level 1 items that make the level O kits. Complete the MRP records, using the following information: • Production plans for complete kits are as follows: Start assembling 8,000 kits in week 2 Start assembling 2,500 kits in weeks 3,...

  • provide step by step explanation of calculation. thanks

    Case #2 MGT2315  There are two (2) Parts to this case.  The First part (Part 1) requires you to use the information to:1.    Build a Bill of Material (BOM) form the given information2.    Determine the Master Production Schedule (MPS) and3.    Complete the MRP for all parts including the product.   The Second Part (Part 2) will require you to use an indexed BOM to 1.    Create the correct MPS from the provided information2.    create the MRP for the unit and all of...

  • Ch04.2. [3 points] Consider the following assembly language code: I0: ADD R4 R1RO I1: SUB R9R3 R4...

    Ch04.2. [3 points] Consider the following assembly language code: I0: ADD R4 R1RO I1: SUB R9R3 R4; I2: ADD R4 - R5+R6 I3: LDW R2MEMIR3100]; 14: LDW R2 = MEM [R2 + 0]; 15: STW MEM [R4 + 100] = R3 ; I6: AND R2R2 & R1; 17: BEQ R9R1, Target; I8: AND R9 R9&R1 Consider a pipeline with forwarding, hazard detection, and 1 delay slot for branches. The pipeline is the typical 5-stage IF, ID, EX, MEM, WB MIPS...

  • 5 6 CD-ROM drivers: Lead Time = 1 week: Minimum order quantity = 15,500 Week 1...

    5 6 CD-ROM drivers: Lead Time = 1 week: Minimum order quantity = 15,500 Week 1 2 3 4 Gross requirements Scheduled receipts Projected ending inventory: 1,000 Net requirements Planned receipts Planned orders Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a system unit, a keyboard, and an installation kit. These pieces are packed together and shipped as a complete kit. In MRP terms, all of these items are level 1 items that make the level...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT