Complete Kit | Week | 1 | 2 | 3 | 4 | 5 | 6 |
Assembly start | 0 | 8,000 | 2,500 | 2,500 | 2,500 | 1,500 | |
System unit | Week | 1 | 2 | 3 | 4 | 5 | 6 |
Gross requirement | 0 | 8,000 | 2,500 | 2,500 | 2,500 | 1,500 | |
Scheduled receipts | 0 | 0 | 0 | 0 | 0 | 0 | |
Projected ending inventory | 10,000 | 10,000 | 2,000 | 13,500 | 11,000 | 8,500 | 7,000 |
Net requirements | 0 | 0 | 500 | 0 | 0 | 0 | |
Planned receipts | 0 | 0 | 14,000 | 0 | 0 | 0 | |
Planned orders | 0 | 14,000 | 0 | 0 | 0 | 0 | |
Speakers | Week | 1 | 2 | 3 | 4 | 5 | 6 |
Gross requirement | 0 | 16,000 | 5,000 | 5,000 | 5,000 | 3,000 | |
Scheduled receipts | 14,000 | 0 | 0 | 0 | 0 | 0 | |
Projected ending inventory | 13,500 | 27,500 | 11,500 | 6,500 | 1,500 | 7,500 | 4,500 |
Net requirements | 0 | 0 | 0 | 0 | 3,500 | 0 | |
Planned receipts | 0 | 0 | 0 | 0 | 11,000 | 0 | |
Planned orders | 0 | 0 | 11,000 | 0 | 0 | 0 | |
CD-ROM drivers | Week | 1 | 2 | 3 | 4 | 5 | 6 |
Gross requirement | 0 | 8,000 | 2,500 | 2,500 | 2,500 | 1,500 | |
Scheduled receipts | 0 | 0 | 0 | 0 | 0 | 0 | |
Projected ending inventory | 11,000 | 11,000 | 3,000 | 500 | 2,000 | 3,500 | 2,000 |
Net requirements | 0 | 0 | 0 | 2,000 | 500 | 0 | |
Planned receipts | 0 | 0 | 0 | 4,000 | 4,000 | 0 | |
Planned orders | 4,000 | 4,000 | 0 | 0 | 0 | 0 |
Calculations:
Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a system unit, a...
5 6 CD-ROM drivers: Lead Time = 1 week: Minimum order quantity = 15,500 Week 1 2 3 4 Gross requirements Scheduled receipts Projected ending inventory: 1,000 Net requirements Planned receipts Planned orders Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a system unit, a keyboard, and an installation kit. These pieces are packed together and shipped as a complete kit. In MRP terms, all of these items are level 1 items that make the level...
Using this MRP record and a lead time of 3 weeks, what should the planned orders be in week 1? 3 4 5 Gross Requirements Scheduled receipts Projected ending Inventory Net Requirements Planned Receipts Planned Orders 400 500 300 0 C 100 100 300 OA 200 O B. 400 O C. 500 O D. 300 8a Using this MRP record and a lead time of 3 weeks, what should the planned orders be in week 1? 3 4 5 Gross...
calculate the MRP Complete the following MRP record. All gross requirements, beginning inventory levels, and scheduled receipts are shown. Click the icon to view the MRP record. Complete the material requirements plan (enter your responses as whole numbers). Week .A2* LT(weeks) 3 2 6 1 Gross requirements Scheduled receipts Projected ending inventory: 360 350 100 50 100 220 0 Net requirements Min. order 1 Planned receipts Planned orders ulo iMore Info Week 2 4 5 6 3 A2** Gross requirements...
One unit of A is made of three units of B, one unit of C, and two units of D. B is composed of two units of E and one unit of D. C is made of one unit of B and two units of E. E is made of one unit of F. Items B, C, E, and F have one-week lead times; A and D have lead times of two weeks. Assume that lot-for-lot (L4L) lot sizing is...
One unit of A is made of three units of B, one unit of C, and two units of D. B is composed of two units of E and one unit of D. C is made of one unit of B and two units of E. E is made of one unit of F. Items B, C, E, and F have one-week lead times; A and D have lead times of two weeks. Assume that lot-for-lot (L4L) lot sizing is...
One unit of A is made of one unit of B and one unit of C. B is made of four units of C and one unit each of E and F. C is made of two units of D and one unit of E. E is made of three units of F. Item C has a lead time of one week; Items A, B, E, and F have two-week lead times; and Item D has a lead time of...
One unit of A is made of two units of B and one unit of C. B is made of three units of D and one unit of F. C is composed of three units of B, one unit of D, and four units of E. D is made of one unit of E. Item C has a lead time of one week; Items A, B, E, and F have two-week lead times; and Item D has a lead time...
One unit of A is made of one unit of B and one unit of C. B is made of four units of C and one unit each of E and F. C is made of two units of D and one unit of E. E is made of three units of F. Item C has a lead time of one week; Items A, B, E, and F have two-week lead times; and Item D has a lead time of...
Material Requirements Planning (MRP) Given the product tree diagram and develop a material requirements plan for item D. A 400 unit-delivery of product P is due at the beginning of week 7. Use the worksheet Product Structure Tree Inventory Information P Order Currently Scheduled Lead Item On-Hand Recpt (wk) Time Qty LAL P 100 L4L A A FIxed Q 450 Fixed Q = 600 L4L 0 C 90 100 (wk 2) 80 (wk 2) 2 50 2 C D(2 Beg...
Problem 12-18 Develop a material requirements plan for component H. Lead times for the end item and each component except B are one week. The lead time for B is three weeks. Sixty units of A are needed at the start of week 8. There are currently 15 units of B on hand and 130 of E on hand, and 50 units of H are in production and will be completed by the start of week 2. (Leave no cells...