Robot B G C (3) E G2 F H

For ITEM G the gross requirement is calculated from the robot & Item C

LOT SIZE RULE (L4L)

ITEM :- ROBOT

Lead Time:- 2 Weeks

Week-1

Week-2

Week-3

Week-4

Week-5

Week-6

Week-7

Week-8

Gross Requirements

23

Scheduled Receipts

Projected In Hand

10

10

10

10

10

10

0

Net Requirement

13

Planned Orders

13

LOT SIZE RULE (L4L)

ITEM :- C

Lead Time:- 1 Weeks

Week-1

Week-2

Week-3

Week-4

Week-5

Week-6

Week-7

Week-8

Gross Requirements

39

Scheduled Receipts

Projected In Hand

20

20

20

20

0

Net Requirement

19

Planned Orders

19

LOT SIZE RULE (FOQ=80)

ITEM :- G

Lead Time:- 2 Weeks

Week-1

Week-2

Week-3

Week-4

Week-5

Week-6

Week-7

Week-8

Gross Requirements

38

13

Scheduled Receipts

Projected In Hand

15

15

15

0

0

Net Requirement

23

13

Planned Orders

23

13

Sub Assembly G order Quantity in Units= 36 units

Sub Assembly G Should start at the Beginning of = 4th Week

Add a comment
Know the answer?
Add Answer to:
Assume that you are the manager of Assembly, Inc. You have just received an order for...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Assume that you are the manager of Assembly, Inc. You have just received an order for...

    Assume that you are the manager of Assembly, Inc. You have just received an order for 27 units of an industrial robot, which is to be Using the following information, determine how many units of subassembly G to order and the timing of those orders, given that subassembly G must be ordered in multiples of 80 units and all other components are ordered lot-for-lot. Assume that the components are used only for this particular robot. Lead Time (weeks) On Hand...

  • MRP

    Assume you are the manager of Assembly, Inc. You have just received an order for 24 units of an industrial robot, which is to be delivered at the start of week 7 of your schedule. Using the following information, determine how many units of subassembly G to order and the timing of those orders, given that subassembly G must be ordered in multiples of 80 units and all other components are ordered lot-for-lot. Assume that the components are used only...

  • Assume that you are the manager of a shop that assembles power tools. You have just...

    Assume that you are the manager of a shop that assembles power tools. You have just received an order for 51 chain saws, which are to be shipped at the start of week 8. Pertinent information on the saws is Lead Time (weeks) On Hand Item Saw Components A(2), B(1), C(4) E(3), D(1) D(2), F(3) E(2), D(2) Mowu Develop the material requirements plan for component Eusing lot-for-lot ordering. (Leave no cells blank - be certain to enter "0" wherever required.)...

  • 3. (30 points) Consider the BOM tree of a sub-assembly, namely A. Land time (LT) consists...

    3. (30 points) Consider the BOM tree of a sub-assembly, namely A. Land time (LT) consists of estimates for setup time, processing time, materials handling time between operations or waiting time, depending on the item type. Items (B,C,D,E,F,G) belong to one of the followings: raw materials, purchased parts of manufactured parts. LT is given in terms of weeks. Suppose that there is no on-hand inventory and no scheduled receipts for all items. How many units of items E, D, and...

  • Assume that you are the manager of a shop that assembles power tools. You have just...

    Assume that you are the manager of a shop that assembles power tools. You have just received an order for 53 chain saws, which are to be shipped at the start of week 8. Pertinent information on the saws is Item Lead Time (weeks) On Hand Components Saw 2 15 A(2), B(1), C(4) A 1 10 E(3), D(1) B 2 5 D(2), F(3) C 2 65 E(2), D(2) D 1 20 E 1 10 F 2 30    Develop the material...

  • Recently, Phil Harris, the production control manager at Brunswick, read an article on time phased requirements...

    Recently, Phil Harris, the production control manager at Brunswick, read an article on time phased requirements planning. He was curious about how this technique might work in scheduling Brunswick's engine assembly operations and decided to prepare an example to illustrate the use of time-phased requirements planning. Phil's first step was to prepare a master schedule for one of the engine types produced by Brunswick: the Model 1000 engine. This schedule indicates the number of units of the Model 1000 engine...

  • Analytics Exercise 9-1 Recently, Phil Harris, the production control manager at Brunswick, read a...

    Analytics Exercise 9-1 Recently, Phil Harris, the production control manager at Brunswick, read an article on time-phased requirements planning. He was curious about how this technique might work in scheduling Brunswick's engine assembly operations and decided to prepare an example to illustrate the use of time phased requirements planning.      Phil's first step was to prepare a master schedule for one of the engine types produced by Brunswick: the Model 1000 engine. This schedule indicates the number of units of the...

  • Do schedule tables for ALL parts. 9. Assume that you are the manager of a shop...

    Do schedule tables for ALL parts. 9. Assume that you are the manager of a shop that assembles power tools. You have just received an order for 50 chain saws, which are to be shipped at the start of week 8. Pertinent information on the saws is Item Lead Time (weeks) On Hand Components 15 A(2), B(1), C(4 10 E(3,DO) 5 D(2), F(3) 65 E2), D(2) 20 10 30 Saw 2 a. Develop a product structure tree, an assembly time...

  • I have most of this correct just confused on plan D net requirements and projected on...

    I have most of this correct just confused on plan D net requirements and projected on hand. So I only need plan D, please show work Oh No!, Inc, sells three models of radar detector units. It buys the three basic models (E, F, and G) from a Japanese manufacturer and adds one, two, or four lights (component D) to further differentiate the models. D is bought from a domestic producer .59/10 D(2) D(4) Lead times are one week for...

  • A company manufactures two types of DVD players, A and B. Although there are differences among...

    A company manufactures two types of DVD players, A and B. Although there are differences among the products, there are a number of common parts within each player. Each model A requires one subassembly C and two subassembly D’s. Each subassembly C requires two F’s and two G’s. Each subassembly D requires two units of F. Each F requires two units of raw material I, while each G requires one unit of raw material H. Each model B requires two...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT