rolinsedu/webopps/assessment/tabe lauech jnplcouse assessment id 19149 1Bcourse d22 701 1Bcontent is 533152 1astepsnul Consider the following production line consisting of 5 sectors and 12 machines. The individual machine capacity and the number of machines in each sector are given below Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 21 3 4 5 2 2 3 Individual machines2 hrsjunit 3 hrs/unit 7 hrsunit 5 hrs/unit 1.5 hrsJunit capacity What is the capacity of the line? a 71 units per hour b. 66 units per hour C.36 units per hour d. 50 units per hour
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer:

  • Option d: 0.50 units per hour

Explanation:

  • Capacity of each sector = no. of machine / capacity given in question
  • Following are the capacity of each sector :
    • ​1 : 1/2 = 0.5 unit / hr
    • 2 : 2/3 = 0.66 unit /hr
    • 3 : 5 /7 = 0.71 unit / hr
    • 4 : 3 /5 = 0.6 unit /hr
    • 5 : 1/ 1.5 = 0.66 units / hr
  • Hence the minimum capacity is of sector 1 , so the process capacity is the capacity of bottle neck = 0.5 unit /hr
Add a comment
Know the answer?
Add Answer to:
rolinsedu/webopps/assessment/tabe lauech jnplcouse assessment id 19149 1Bcourse d22 701 1Bcontent is 533152 1astepsnul Consider the following...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The three stations work cell illustrated in the figure  below has a product that must go...

    The three stations work cell illustrated in the figure  below has a product that must go through one of the two machines at station 1 ( they are parallel) before proceeding  to station 2 Capacity:30 units/hrs Station 1 Machine A Station 1 Machine B Capacity:30 units / hrs Station 2 Capacity 12 units/hrs Station 3 Capacity 4 units/hrs A) The bottleneck time of the system is .......minutes per unit ( enter your response as  whole  number) B) Station 1 or...

  • The Goodparts Company produces a component that is subsequently used in the aerospace industry. The component...

    The Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 40, 35, and 15 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 155 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are in total six drilling machines,...

  • i need help with d-1 d-2 and e please! Problem 7-15 Chec The Goodparts Company produces...

    i need help with d-1 d-2 and e please! Problem 7-15 Chec The Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 35, 30, and 10 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 110 components per hour. Part C undergoes a drilling operation before being finally assembled with the...

  • oylan Company manufactures two productslong dashtoaster ovens and bread machines. The following data are​ available: Toaster...

    oylan Company manufactures two productslong dashtoaster ovens and bread machines. The following data are​ available: Toaster Ovens Bread Machines Sales price $ 70 $ 170 Variable costs $ 30 $ 60 Boylan can manufacture six toaster ovens per machine hour and four bread machines per machine hour.​ Boylan's production capacity is 1 comma 600 machine hours per month. Marketing limitations indicate that Boylan can sell a maximum of 5 comma 100 toasters and 4 comma 000 bread machines per month....

  • C&A makes two types of products using four machines from 9 a.m. to 5 p.m. each...

    C&A makes two types of products using four machines from 9 a.m. to 5 p.m. each day. Product A visits machines 1, 2, and 4. Product B only visits machines 1 and 3. The capacity is 0.4 unit per minute at machine 1, 0.12 unit per minute at machine 2, 0.2 unit per minute at machine 3, and 0.3 unit per minute at machine 4. The demand per day is 40 units for Product A and 160 units for Product...

  • PA 3-3 Consider a process consisting of three... Consider a process consisting of three resources. Assume...

    PA 3-3 Consider a process consisting of three... Consider a process consisting of three resources. Assume there exists unlimited demand for the product. Resource 1 has a processing time of 2 minutes per unit. Resource 2 has a processing time of 6 minutes per unit. Resource 3 has a processing time of 4 minutes per unit. Resource 1 Resource2 Resource 3 All three resources are staffed by one worker. The flow diagram is shown above. Round "Capacity of resource" to...

  • C&A makes two types of products using four machines from 9 a.m. to 5 p.m. each...

    C&A makes two types of products using four machines from 9 a.m. to 5 p.m. each day. Product A visits machines 1, 2, and 4. Product B only visits machines 1 and 3. The capacity is 0.4 unit per minute at machine 1, 0.12 unit per minute at machine 2, 0.2 unit per minute at machine 3, and 0.3 unit per minute at machine 4. The demand per day is 40 units for Product A and 160 units for Product...

  • Q 5-8 Your company produces electronic connectors, which consist of a metal strip with multiple prongs...

    Q 5-8 Your company produces electronic connectors, which consist of a metal strip with multiple prongs assembled into a plastic housing. The manufacturing process is divided into four separate departments: 1) Injection molding, where the small plastic housings are produced; 2) Stamping, where the steel strips are punched out of thin coils of steel; 3) Plating, where the steel strips, after being stamped, are plated with tin or gold; and 4) Assembly, where the plated strips are inserted into the...

  • Consider a process consisting of five resources that are operated eight hours per day. The process...

    Consider a process consisting of five resources that are operated eight hours per day. The process works on three different products, A, B, and C; Resource Number of Workers Processing Time for A (Min./Unit) Processing Time for B (Min./Unit) Processing Time for C (Min./Unit) 1 2 5 5 5 2 2 3 4 5 3 1 15 0 0 4 1 0 3 3 5 2 6 6 6 Demand for the three different products is as follows: product A,...

  • Antuan Company set the following standard costs for one unit of its product. Direct materials (4.Ibs....

    Antuan Company set the following standard costs for one unit of its product. Direct materials (4.Ibs. @ $4.00 per Ib.) Direct labor (1.8 hrs. @ $12.00 per hr.) Overhead (1.8 hrs. $18.50 per hr.) Total standard cost $16.00 21.60 33.30 $79.98 The predetermined overhead rate ($18.50 per direct labor hour) is based on an expected volume of 75% of the factory's capacity of 20,000 units per month. Following are the company's budgeted overhead costs per month at the 75% capacity...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT