Order the following events from earliest to latest
- 1. 2. 3. 4. 5. 6. 7. 8.
The Delian League headquarters and treasury moves to Athens
- 1.
2. 3.
4. 5.
6. 7.
8.
Beginnings of Greek red figure vase painting
- 1.
2. 3.
4. 5.
6. 7.
8.
Socrates dies
- 1.
2. 3.
4. 5.
6. 7.
8.
Decline of Mycenaeans
- 1.
2. 3.
4. 5.
6. 7.
8.
Rameses II comes to power
- 1.
2. 3.
4. 5.
6. 7.
8.
End of the Persian Wars
- 1.
2. 3.
4. 5.
6. 7.
8.
Akhenaten dies
- 1.
2. 3.
4. 5.
6. 7.
8.
Octavian/Augustus conquers Egypt
Answer
The following events are ordered from earliest to latest:
1. Akhenaten dies: 1335 BC
2. Rameses II comes to power: 1279 BC
3. The decline of Mycenaeans: 1200 BCE
4. Beginnings of Greek red-figure vase painting: 530 BC
5. The Delian League headquarters and treasury moves to Athens: 454 BC
6. End of the Persian Wars: 449 BC
7. Socrates dies: 399 BC
8. Octavian/Augustus conquers Egypt: 31 BC
Hey, please do leave a thumbs-up. If you have any doubts, mention in the comments below. I will be happy to help. Thank You.
Order the following events from earliest to latest - 1. 2. 3. 4. 5. 6. 7. 8. "Kritios boy" is produced - 1. 2. 3. 4. 5. 6. 7. 8. Hatshepsut takes control of Egypt -...
11 The following activity times are given: Determine the following a) Earliest start time b) Earliest finish time c) Latest Start Time d) Latest finish time e) Critical Path Activity Completion time( in months) 1-2 5 1-3 6 1-4 2 2-5 3 2-6 1 3-5 3 4-5 0 4-7 2 5-8 9 5-7 5 7-8 4 6-9 7 8-9 3
Put these movements in chronological order, starting with the earliest. - 1. 2. 3. 4. 5. 6. 7. 8. Post Modernism - 1. 2. 3. 4. 5. 6. 7. 8. Black Arts Movement - 1. ...
QUESTION 20 Order the four Beginnings (Kelly 2016) from earliest (1) to most recent (4) A. Agriculture A. 3 C. Culture B.2 B. Technology C. 1 D. State D.4
Using the information shown in the table below, what is the latest start time for activity E? ACTIVITY Immediate Predecessor ACTIVITY TIME EARLIEST START EARLIEST FINISH LATEST START LATEST FINISH SLACK A None 2 0 0 2 0 B A 1 2 3 3 4 1 C A 3 2 5 2 5 0 D B 7 3 10 4 11 E B, C 3 5 8 11 F C 5 11 5 11 0 G D ,E, F 4...
Figure to accompany Table 7.1 Table 7.1 Activity Slack 0 в 1 1 1 Activity Earliest Earliest Latest Time Start Finish Latest Start Finish 2 0 02 2 3 3 4 312 5 12 15 7 3 10 4 35 11 | 11 | 5 11 4 11 15 11 15 1 G 0 Refer to the Figure to accompany Table 7.1. Which one of the following is the critical path? O ACFG ABDG ABEG ACEG
what is the earliest time to finish thr project ? A. 18.7 B. 20 C. 21.7 D. 22.5 E. 26.2 what is the expected activity time for activityD? 2 3 4 5 6 what is the latest start time fir activity G without delaying the project ? 5.3 10.7 13.3 14.9 18.5 what is the late finish time for activity A 0 2.5 4.7 5.7 8 Please use the following information to answer question 27-30 Activity Preceding activity Optimistic Pessimistic...
The sequence of Insect Arrival in Forensic Entomology -The following images depict the sequence of events at the site of a decomposing body. Place the arrival events in order of occurrence from earliest to latest. 1) 2) 3) 4) 5) 6)
Please help fill in the green boxes given the earliest start time. I am unsure if B would start on week 2 or week 3. Earliest Start Earliest Finish Latest Start Latest Finish Slack ON 11 Activity 12 A 13 B 14c 15 D 16 E 17 F 18 G 19 H NON 26 Budgeted Budgeted Cost/Week Total Cost OS 11,000 $ 22,000 13,000 $ 39,000 12,000 $ 48,000 10,000 $ 40,000 11,000 $ 33,000 15,000 $ 75,000 9,000 $...
1. Put the following stages of star formation into the proper sequence from earliest to latest: Hint: When put into the proper order, each stage connects to the one before it and the one after it. Look for the key transition terms. A. Infalling material forms a hot and luminous protostar at the center of the disk. B. Newly-formed star settles onto the Main Sequence. C. Massive, rotating, amorphous interstellar cloud collapses and fragments. D. As the shrinking protostar heats...