Order the following events from earliest to latest
- 1. 2. 3. 4. 5. 6. 7. 8.
"Kritios boy" is produced
- 1.
2. 3.
4. 5.
6. 7.
8.
Hatshepsut takes control of Egypt
- 1.
2. 3.
4. 5.
6. 7.
8.
Great Pyramid of Khufu is constructed
- 1.
2. 3.
4. 5.
6. 7.
8.
Gilgamesh is king of Uruk
- 1.
2. 3.
4. 5.
6. 7.
8.
Athens mounts the Sicilian Expedition
- 1.
2. 3.
4. 5.
6. 7.
8.
End of Minoan dominance in Aegean Sea
- 1.
2. 3.
4. 5.
6. 7.
8.
Greek Bronze Age begins
- 1.
2. 3.
4. 5.
6. 7.
8.
Narmer becomes the first Pharaoh of Egypt
1) Narmer becomes the first Pharaoh of Egypt (happened at around 3100 BC)... Earliest
2) Greek Bronze Age begins (happened at around 2800 BC)
3) Gilgamesh is king of Uruk (happened at around 2700 BC)
4) Great Pyramid of Khufu is constructed (happened at around 2560 BC)
5) Hatshepsut takes control of Egypt (happened at around 1478 BC)
6) End of Minoan dominance in the Aegean Sea (happened at around 1100 BC)
7) "Kritios boy" is produced (happened at around 480 BC)
8) Athens mounts the Sicilian Expedition (happened at around 415-413 BC).......Latest
Order the following events from earliest to latest - 1. 2. 3. 4. 5. 6. 7. 8. The Delian League headquarters and treasury moves to Athens - 1. 2. 3. 4. 5. 6. 7. 8. Beginnings of Greek...
11 The following activity times are given: Determine the following a) Earliest start time b) Earliest finish time c) Latest Start Time d) Latest finish time e) Critical Path Activity Completion time( in months) 1-2 5 1-3 6 1-4 2 2-5 3 2-6 1 3-5 3 4-5 0 4-7 2 5-8 9 5-7 5 7-8 4 6-9 7 8-9 3
Put these movements in chronological order, starting with the earliest. - 1. 2. 3. 4. 5. 6. 7. 8. Post Modernism - 1. 2. 3. 4. 5. 6. 7. 8. Black Arts Movement - 1. ...
Using the information shown in the table below, what is the latest start time for activity E? ACTIVITY Immediate Predecessor ACTIVITY TIME EARLIEST START EARLIEST FINISH LATEST START LATEST FINISH SLACK A None 2 0 0 2 0 B A 1 2 3 3 4 1 C A 3 2 5 2 5 0 D B 7 3 10 4 11 E B, C 3 5 8 11 F C 5 11 5 11 0 G D ,E, F 4...
Figure to accompany Table 7.1 Table 7.1 Activity Slack 0 в 1 1 1 Activity Earliest Earliest Latest Time Start Finish Latest Start Finish 2 0 02 2 3 3 4 312 5 12 15 7 3 10 4 35 11 | 11 | 5 11 4 11 15 11 15 1 G 0 Refer to the Figure to accompany Table 7.1. Which one of the following is the critical path? O ACFG ABDG ABEG ACEG
what is the earliest time to finish thr project ? A. 18.7 B. 20 C. 21.7 D. 22.5 E. 26.2 what is the expected activity time for activityD? 2 3 4 5 6 what is the latest start time fir activity G without delaying the project ? 5.3 10.7 13.3 14.9 18.5 what is the late finish time for activity A 0 2.5 4.7 5.7 8 Please use the following information to answer question 27-30 Activity Preceding activity Optimistic Pessimistic...
The sequence of Insect Arrival in Forensic Entomology -The following images depict the sequence of events at the site of a decomposing body. Place the arrival events in order of occurrence from earliest to latest. 1) 2) 3) 4) 5) 6)
Please help fill in the green boxes given the earliest start time. I am unsure if B would start on week 2 or week 3. Earliest Start Earliest Finish Latest Start Latest Finish Slack ON 11 Activity 12 A 13 B 14c 15 D 16 E 17 F 18 G 19 H NON 26 Budgeted Budgeted Cost/Week Total Cost OS 11,000 $ 22,000 13,000 $ 39,000 12,000 $ 48,000 10,000 $ 40,000 11,000 $ 33,000 15,000 $ 75,000 9,000 $...
1. Put the following stages of star formation into the proper sequence from earliest to latest: Hint: When put into the proper order, each stage connects to the one before it and the one after it. Look for the key transition terms. A. Infalling material forms a hot and luminous protostar at the center of the disk. B. Newly-formed star settles onto the Main Sequence. C. Massive, rotating, amorphous interstellar cloud collapses and fragments. D. As the shrinking protostar heats...
Basic Project Management Lesson 6. Exercises 1. The AOA diagram of a project is shown below. The duration of each activity in days is shown by its side. a. Calculate the earliest and latest schedules of each event. b. Show the critical path by thickening the critical arrows. c. Fill in the Slack Table. -- a 15 Start Finish 11 13 Slack Table: Task 1-2 1-3 2-3 2-4 Slack TTT 2-5 3-5 | 3-7 | 4-6 5-6 5-7 5-8 6-8...