Question

Operations Management

Describe the flow chart of Textile Manufacturing Process. 

1 0
Add a comment Improve this question Transcribed image text
✔ Recommended Answer
Answer #1

Textile Manufacturing measures is starting towards the creation of any piece of clothing or Textile Products. Textile Manufacturing is a broad and enormous industry having a perplexing methodology.


Flow Chart:

Process 1: Spinning: Spinning is a strategy of delivering/changing over fiber materials in yarns. On an underlying stage, it goes through the blow room where the size of cotton decreases by the assistance of apparatus followed via checking. In the wake of checking, the interaction is proceeded by drawing which incorporates lessening in turning factories. The silver created by drawing is then prepared for consolidating where a reliable size of the material is achieved. It is then ventured further for wandering for a reason to plan input bundle. This meandering is lessened by rollers and afterward twirled around the turning axle.

Process 2: Weaving: Weaving is the second level. Here, the yarn from the turning area is sent further for multiplying and curving. It is then handled for moving of yarn in the helpful type of bundle containing adequate yarn length. At the phase of weaving the depleted bundles are supplanted with the new ones which are trailed by wrapping. The wrapped yarn is given a defensive covering to decrease the breakage of yarn which is called Weaving. It is considered a significant section. This yarn is then handled for twisting on the weaver's shaft upheld by the last advance of weaving.

Process 3: Dyeing/Printing/Finishing: Dyeing just as printing of textures is generally conveyed before the use of different completions to the item in coloring plants. It gives tone to texture and furthermore works on its presence. The item is then changed over from woven to sewed fabric known as wrapping up. Completing is explicitly conveyed subsequent to Dyeing to give a particular look.

Process 4: Garments Manufacturing: It is the end of the manufacturing methodology changing over semi-completed material into completed material. There are different advances finished by article of clothing fabricating organizations for the creation of the material. These cycles incorporate designing, sampling, costing, sewing washing, maker making cutting, finishing, final inspection, packing, dispatch, and significantly more.


answered by: oparker
Add a comment
Know the answer?
Add Answer to:
Operations Management
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • Operations Management

    Describe the nature of operations management in the following organizations. In doing this, first describe the operation process of the production system. Second, identify operations decisions.• A paper manufacturing • An internal design office 

  • Create a diagram of a job order cost system or a process cost system. Choose a...

    Create a diagram of a job order cost system or a process cost system. Choose a product that you will manufacture and describe the manufacturing process for it using a flow chart or mind map. The chart should include the major steps in the process and the journal entries (debits and credits) which would be recorded at each step. You may use shapes, pictures, and text to describe the production process. Create a diagram of a job order cost system...

  • ISOM319 Operations Management Instructions:  For each topic (with bullet point) please use one or two sentences to...

    ISOM319 Operations Management Instructions:  For each topic (with bullet point) please use one or two sentences to describe or define the topic , can be as simple as a definition. You may use the book to help you with concepts you may not remember.    Process Analysis ·       Process Flow Diagram ·       Little’s Law: Flow Unit, Flow Rate, Flow Time ·       Inventory Turns, Direct Labor Cost, Productivity, Yield Capacity Management and Analysis ·       Capacity Management ·       Capacity Analysis: Theoretical vs Actual Capacities, Utilization, Process Capacity, Process Flow...

  • (( please answer my question with reference )) Describe the nature of operations management in the...

    (( please answer my question with reference )) Describe the nature of operations management in the following organizations. In doing this, first describe the operation process of the production system. Second, identify operations decisions. A paper manufacturing An internal design office 2. Take a tour of the Soap Factory and describe the process used? 3.Suppose that a firm is considering moving from a batch process to an assembly-line process to better meet evolving market needs. What concerns might the following...

  • if someone could provide flow chart and costing based on machine hour rate process for a...

    if someone could provide flow chart and costing based on machine hour rate process for a mattress manufacturing company need a machine hour rate based costing process flow chart indicating apportionment and allocation costing flow chart for a manufacturing process detailed example of computation of machine hour rate method

  • Write one-page paper on the topics of process strategy, Location management and layout Strategies. For each...

    Write one-page paper on the topics of process strategy, Location management and layout Strategies. For each topic define give an example and indicate the importance with three citation for each of the topic. Please cite two other external references. Add your personal life experiences on topics of process, location and layout strategies. Use excel OM worksheet to compute crossover points for different processes (process strategy), Center of Gravity Methods (location Management), Determine the Cost of Layout by the material-handling cost...

  • Methods analysis uses all of the following types of charts except. Process chart Flow diagram Operations...

    Methods analysis uses all of the following types of charts except. Process chart Flow diagram Operations chart Gantt chart

  • explain the change management process. you may create a flow chart to illustrate the process.

    explain the change management process. you may create a flow chart to illustrate the process.

  • OPERATIONS MANAGEMENT Jane is in charge of manufacturing lumber. The saw blade that cuts the lumber...

    OPERATIONS MANAGEMENT Jane is in charge of manufacturing lumber. The saw blade that cuts the lumber is 1/4 inches wide +/- 0.001 inches. Jane notices from her run chart that the lumber she produces varies between 0.249 inches to 0.251 inches. John tells Jane that she needs to change the saw blade because it is NOT cutting within the process parameters. If Jane changes out the blade this will be an example of: Select one or more: a. TYPE TWO...

  • 7. How can each of the following be used to improve productivity? (a) Operation process chart (b)...

    7. How can each of the following be used to improve productivity? (a) Operation process chart (b) Flow process chart (c) Flow diagram (d) Left-hand/right-hand chart (e) Multiple activity chart 7. How can each of the following be used to improve productivity? (a) Operation process chart (b) Flow process chart (c) Flow diagram (d) Left-hand/right-hand chart (e) Multiple activity chart

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT