Question

1) How does change management contribute to organizational effectiveness? Please provide a well-researched technical analysis. 2)...

1) How does change management contribute to organizational effectiveness? Please provide a well-researched technical analysis.

2) Conduct a gap analysis following the objective of enhancing the effectiveness of a process or an operation that you are familiar with (workplace or daily basis).

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Change Management and Organizational Effectiveness for the HR Professional

Introduction

Hostess Brands, an American company established in the 1930s, specialized in baked goods including the long established Twinkies, Ho Ho’s, and Wonder Bread. In November of 2012, Hostess management filed for bankruptcy, blaming the unions and workforce for the financial fiasco. While the organized workforce’s unwillingness to bend to management’s demands may have been a tipping point in the Hostess failure, it was clearly not the main issue. Hostess’s unwillingness or inability to change over time was what really led to the company’s downfall. According to Forbes contributor Adam Hartung, the “obvious problem was that leadership kept trying to sell the same products, using roughly the same business model, long, long, long after the products had become irrelevant.” . Points which should have invoked change for Hostess include: changing consumer tastes, nutritional considerations, and the reality that Hostess’s product costs were higher than the prices that Hostess was able to sell the product for[. Because change didn’t happen, 18,000 jobs were lost and an iconic American business failed.

In today’s dynamic business world, any change not managed correctly can strain HR’s ability to help the business create and maintain competitive advantage. Human Resource professionals need to have the knowledge, skills, and abilities to not only adapt to change but to also identify when it’s needed and how to successfully leverage such opportunities. According to the SHRM 2007 Change Management Survey Report, only 23% of companies had HR staff devoted full time to change management programs. This means that 77% of HR professionals who encounter change management initiatives will be dealing with change on an ad hoc or inconsistent basis. This article outlines steps and strategies to lead the everyday HR professional to a higher level of agility and effectiveness through the change process. The primary steps outlined in this article are:

Assessment: Understanding organizational and employee readiness for change

Preparation: Setting the groundwork for the change process

Execution: Implementing and monitoring change and organizational development

Sustaining: Is sustaining and institutionalizing change the right answer

1.     Assessment: Understanding Organizational and Employee Readiness for Change

Assessing organizational and employee readiness for change necessitates considering the timing of company programs, the speed of the plan, its duration, and the workforce’s knowledge, skills, and abilities (KSA) to implement the approaching change. All of these factors can be considered the “hard issues” of change management which, if ignored, can lead to the premature breakdown of transformation programs.

Timing: Timing will be a critical focus during change implementation. Common sources of timing issue include open enrollment, Kaizen improvement projects in manufacturing groups, companywide audits, annual trainings, etc. During times of transition, each of these situations can place additional strain on the workforce and company resources. Too much pressure can seriously affect the success of the change initiative. Change will inherently require more energy, focus, and attention from employees as they’re asked to accomplish daily tasks while instituting the change initiatives. HR needs to identify any concurrent drivers which could apply additional pressures on the employees and business units. HR must be able to assess if the organization can handle the additional strain, or if the timing of the change initiative should be adjusted.

Speed: While timing is focused on when change will be implemented, the question of speed focuses on how fast the change needs to take place. For example, a medical device company might be the only company in its industry with FDA approval to launch a new device. Accordingly, the company would need to launch the device quickly in order to corner the market. On the other hand, a company implementing a cultural change would need more time and flexibility to incorporate those changes. If change needs to be implemented quickly, HR must have a clear plan in place so the company can move forward rapidly and effectively. In such a situation, HR should minimize the number of people involved in the change management process; the more people involved, the slower the process will be. Moreover, HR will need to encourage leadership to be very attentive to resistance. If the company limits involvement for efficiency reasons there is an increased likelihood that employees will feel ignored and fight the change process. Conversely, when speed is not such an issue, companies can consider broader employee involvement, to foster employee ownership and buy-in.

Training (KSA’s): According to the SHRM 2007 Change Management Survey Report, 44% of respondents listed insufficient time devoted to training as a major challenge of the change process. A company’s failure to adequately prepare employees for change is critical, and HR must address this issue in the assessment stage, as it’s almost impossible to correct later. There are three specific questions HR needs to ask. First, do we have the required knowledge, skills, and abilities (KSA’s) to foster success in this situation? Second, what KSAs would enhance success? Third, what are the time and resource needs to make this training happen? With this information HR can move forward confidently that a lack of knowledge, skills, or abilities will not inhibit a positive change implementation.

As leadership and HR address each of these “hard” issues, they will have a clear understanding of the company and employees’ readiness for change. Postponing change for as little as a month to avoid a particularly hectic time of year or to better prepare employees could largely increase a change program’s probability of success.

2.              Preparation: Setting the Groundwork for the Change Process

The assessment stage is a lot like identifying if a business has enough capital, cash on hand, and resources to move forward with a large expansion project. The Preparation stage is when the business is able to say, “Ok, we can do this; let’s get started.” Change management is like any worthwhile project; it needs to start early and the preparation needs to be done well.

Creating a Vision for Change and a Strong Leadership Voice: Management and HR need to clearly identify a vision for the change process. The vision should clearly highlight the: who, what, why, when, and how of the change process. When management attempts to build a persuasive vision for change they need to connect the change vision with the current identity of the company and the core values of the business. Leadership also needs to make sure there are vivid descriptions of what the change and the future are going to look like. By doing this the vision will be more compelling to the employee population.

By identifying and building the vision early, company leadership is able to buy into and represent the upcoming change effectively. Throughout the change process, it’s critical for the workforce to see commitment to the change from management at all levels. If employees don’t see that the company’s leadership is supporting a project they’re unlikely to change. When management can show employees that change is possible and exciting, people feel empowered and are more likely to buy into the prospect of change and work hard to make it happen.

Unfreezing: The second significant point of the preparation stage is to “unfreeze” the current state of thinking about the organization and what it’s doing. Most employees inherently don’t feel that change is needed, especially if the business is doing well. Unfreezing is the act of highlighting the gaps that exist in the current model (i.e. the need for change) or focusing on the growth opportunities that the business could realize if the specific change takes place. By doing this, HR paints a different picture of the current situation and alters employee perceptions. The act of focusing on gaps or opportunities is called physiological disconfirmation and brings the workforce to a point where it can clearly see and agree that change is needed or beneficial. This could also be looked at as reframing situations so people can look at them in a new way. Framing is a mental window through which we view problems, solutions, or opportunities”. By re-framing the business situation, employees can take a step back, understand the need and/or benefit of the change project, and make a mental shift and get behind the change.

Avoiding Resistance and Communication Strategies

According to the SHRM 2007 Change Management Survey Report, 76% of respondents listed employee resistance as a major hindrance to change, making it the most frequently reported obstacle followed closely by communication breakdown at 72%. With these metrics in mind, it’s clear that HR professionals must find tactics to reduce employee resistance and minimize the breakdown of communication before and throughout the change management process.

Comprehensive Communication Plan: Confusion is a lack of understanding among employees and usually occurs because management’s message is not clearly presented. Ignorance is a lack of information and happens when there are not enough details voiced or employees are intentionally kept in the dark. When these situations occur, employees tend to tell themselves stories to fill in the gaps, and most of the time self-created stories are negative and inhibit the change process. Building an effective communication plan with information, dates, challenges, deadlines, etc. will diminish employee confusion and ignorance simultaneously. The comprehensive communication plan should focus on identifying and anticipating resistance, questions, and concerns that employees will have. By doing this, management can speak with confidence when communicating with employees about current or upcoming change. This confidence and clarity will help convince employees that company leadership is prepared for the future and the change can be a success.

Part of the communication plan must address company culture and how it will be impacted. With each new change that’s launched there’s risk to the overall company culture. Employees often resist changes to a familiar culture. By making sure that HR communicates how the change will align with or enhance the current organizational culture, HR can eliminate potential employee fear. In addition, HR should encourage the leadership team to have a culture of communication within the team and with subordinates. One of the worst things that can happen for the company’s culture is inconsistency in understanding. If there’s a culture shift in one area of the company and not in others, this can create animosity, misunderstanding, and errors, which can hinder the planned change process. By focusing on culture, values, and company ideology, business and HR leaders will better manage the challenging dynamics of culture during institutional change.

Picking the Right Messenger: Once the communication strategy has been developed, the HR team needs to identify the right messenger to communicate the change plan. Most times, the role of messenger falls to the CEO. However, this might not always be the best option. Research suggests that employees may use the positive or negative feelings they have about a messenger to decide whether the message can be trusted. Employees who feel loyalty, support, trust, and liking for a particular messenger have proven less likely to resist change. This finding has held true across multiple management communication approaches. When employees communicate with messengers they trust and like, they’re more likely to listen and accept change initiatives. It’s not just important for HR to identify the right messenger at the top of the organization; HR also needs to implement an identification strategy aimed at recognizing leaders who are trusted and can act as change messengers at all levels of the organization.

Give Them Voice: In addition to communicating effectively through the right messengers, HR needs to ensure, where possible, that employees have a voice throughout the change process. This doesn’t mean that all employee ideas need to be implemented. However, management and HR should listen to employees and identify what ideas can be realized without inhibiting the change initiative. Employees frequently give management and HR a broader or deeper perspective into the effects of change. This information often helps the process be more successful in the short and long run. Also, by taking note of employee ideas and concerns, HR demonstrates that it values employee buy in and ownership. This also creates a greater sense of procedural justice for the employees throughout the change process[16].

3.              Execution: Implementing and Monitoring Change and Organizational Development

Execution of a change initiative can be exhilarating and stressful for the business leaders and the employee population. It’s critical that HR approaches implementation with a structured and systematic method. Most of the vital steps in the assessment and planning stages must be repeated in the implementation phase. HR professionals must reduce resistance, encourage input, continue to focus on training and education, ensure effective communication, and ensure that the vision stays inspiring and consistent with the company culture as the business moves through the change initiative. However, there are additional areas that management and HR must act on to build employee confidence in the change, and employees’ abilities to contribute to the change process during implementation. Those areas are expectancy theory, creating small wins, equity theory, and correcting direction.

Expectancy Theory: Expectancy Theory is a critical motivation strategy that businesses need to consider during change. Throughout the change process employees must feel that the proposed plan is possible and that as the proposed actions are taken, it will lead to the expected results, which will be positive or beneficial. This must be a key focus during change. If the employees don’t find value in the change or they don’t think it’s possible, they’re less likely to apply the effort required to implement the desired change. Managers must evaluate, what’s the perceived value.

Small Wins: This concept centers on creating and highlighting early accomplishments, and therefore setting an expectation that success is possible. An example of small wins would be the case of Siemens Nixdorf Information Systems (SNI). SNI lost over $350 million in fiscal year 1994 and was trying to deal with these struggles. In its quest to stem the financial losses, SNI hired new CEO, Gerhard Schulmeyer, who immediately instituted a culture change program. He assembled opinion leaders throughout the company to generate ideas, goals, and then created 60 action teams responsible for creating tangible results in the first 90 days. In May 1995, Schulmeyer held a “Results fair” in Munich where 12,000 employees were able to see what had been accomplished in the first 90 days of the culture change program. Employees were excited; Schulmeyer used the power of small wins to create motivation for his change program. The best time to identify small wins is early and often. By doing this, HR builds employee confidence and self-efficacy toward change. Small wins have a snowball effect, gathering momentum as they roll, and leading to greater confidence and profound results.

Equity theory: Employees often try to alter a real or perceived unfair situation by altering inputs or outputs, telling a story about the situations (i.e. cognitive distortion), choosing alternative comparisons, or leaving the company altogether. During change, many companies revamp the compensation models and give out prizes and/or rewards for success. Because opportunities during change vary, some employees may come out more favorably than others, which could create discontent among employees. When businesses institute a change initiative, HR needs to consider the equity of the situation and how to brand it appropriately. If there’s inequality or even perceived inequality, employees may feel frustrated toward the change and mentally disengage or try to alter the environment to make it feel or be more equitable.

Correcting Direction: During the implementation stage of a change initiative HR professionals need to ensure that they instill a clear understanding that management encourages feedback and ideas throughout the change process. Many times, change initiatives derail because management and employees are so focused on the end results that they’re unwilling to change course even in the face of obvious obstacles. Correcting direction is an important part of implementing change and should be something the company is ready to embrace if adjustments are necessary.

The classic example of an organization failing to correct direction was the Challenger disaster in 1986, in which a NASA space shuttle exploded over the Atlantic Ocean, killing the entire crew. The primary issue that caused the explosion originated from the failure of the shuttle’s O-rings at low temperatures. These facts, and the extreme risks, were clear to some of the engineers, but the group norms were set and these norms made it hard to change the direction that the team was moving. Many people wanted to move forward and presented high levels of defensiveness against those who raised concerns. Because of strong defending of the current plan, engineers who knew about the O-ring problem backed down and said that “everything should be fine”… the rest is history.

4.              Sustaining: Is Sustaining and Institutionalizing Change the Right Answer?

What is sustainability? What is institutionalization? If they are different, do the differences matter? The answer is clear; they are different and the differences are critical to the change management process. Sustainability can be viewed as – keeping a company from moving back to “old ways” while the change process moves forward. HR can help this happen by supporting the firm’s change agents (the people who are pushing the change program forward). If change agents become burned out, they may stop encouraging employees and the program may lose momentum and falter. Establishing a support system gives change agents a place to vent, exchange ideas with other change agents, and gain an understanding that others are facing the same types of challenges. Most times, change agents need some level of psychological distance from the rest of the employees. It’s critical that change agents have a place where they can be open and honest without reproach or retribution. Creating a change agent support system is akin to reinforcing the foundation of a house that is holding everything else in place. Went these change leaders are supported they’re able to continue to sustain organizational change.

Institutionalization, on the other hand, encompasses the actions surrounding keeping changes that are effective in place after sustainability. It is defined as the process of initiating, executing, and managing change for the appropriate length of time. Institutionalization should happen when a company can identify changes that result in higher levels of competitive advantage

This highlights the importance of consistently reviewing change initiatives and continually asking the question, “Is this program still offering us a competitive advantage?” A risk of institutionalization is the loss of leadership attention and the subsequent depreciation of the value that the change holds. To avoid this, HR must keep a pulse on what is happening with change programs. HR must bear in mind the program’s intended aim and assure the results are still moving toward that end. Furthermore, HR must ask if these expected results will align with the business model and larger organizational goals. If the change is no longer effective or no longer in alignment it needs to be reviewed, revamped, or discontinued.

How to Sustain/ Institutionalize Change: When a change initiative is successful and creates a competitive advantage, the question then is how to institutionalize that change for an appropriate period of time. Many of the steps highlighted in the planning and implementing stages are mirrored in sustaining and institutionalizing a change. These steps include: gaining high levels of commitment, reducing resistance, highlighting accomplishments, encouraging collaboration, training, communication, and appropriate incentive allocation to foster motivation. The biggest difference here is that HR professionals need to help the change initiative be seen as a norm, part of the business model, and not just a fad. This could require continual reminders so that old habits are broken and employees move forward with the new agenda.

Not every change is appropriate to sustain, let alone to institutionalize, but change is always happening. It’s imperative that HR professionals develop and encourage a culture that’s adaptive, dynamic, and open to change. As leadership and HR create a “change culture,” where change seems the norm, the continued alterations will be less taxing, there will be reduced burnout, and employees will be more effective over time.

Conclusion Historically HR has faced business challenges and issues from a static approach. By mastering necessary stability processes, HR limits its ability to work in a change environment. The stable, day-to-day operations in HR will always be important and it’s critical that they’re done well; however, to strategically enhance the business’s competitive advantage, HR needs to master how to lead the change process now and in the future. To do this, HR needs to be effective at assessing the company and its readiness for change, set the ground work for the change to happen, move forward to implement change and monitor its progress, help to sustain momentum, and know when it is appropriate to institutionalize change in an organization. As this happens, Human Resource professionals will have the knowledge, skills, and abilities to not only work through change but also identify when it’s needed and how to make it successful.

A GAP ANALYSIS PROCESS TO IMPROVE IT MANAGEMENT

The effectiveness and benefits of the gap analysis process can be demonstrated through an example of its use to improve the IT project management process. Virtually all organizations can benefit from improvements in managing IT projects, because their performance record is not good, for delivering projects that are on time and within the original budget estimates. Some organizations require only minimal improvements in order to meet the time and budget objectives. Others must put forth considerable effort to meet their project goals.

Whatever the organization’s current state of IT project management, gap analysis can assist in attaining the project delivery goals. The approach here is adoption of a straightforward method of bringing about improvements, rather than a lengthy reengineering or restructuring process. Gap analysis works to improve existing IT project management processes and the results delivered through that process. This enables organizations to concentrate their focus on a few essential items that can be quickly changed, to provide immediate benefits to IT project management.

In this example, gap analysis can be thought of as a stepped process, whereby the process produces a quick result. Once that is in place and working, the organization moves to the next quick result. Building in this way upon the successes of the gap analysis process will ensure a continuing string of successes.

This scenario emphasizes improvement of an existing process. The example assumes that a formal IT project management process is in place, and its use is being enforced. If an organization lacks a project management process, gap analysis cannot bridge the large gap between what the organization wants and its current status. Such an organization should first install and begin to use a project management system. Later, it can consider the use of gap analysis.

The following gap analysis steps demonstrate how the process can strengthen the IT project management function, providing a practical example of the analysis steps. Because gap analysis is a consistent process, the process steps will always be the same, although the particulars will be different for each situation. Therefore, as the organization gains experience with gap analysis, it will be able to deliver benefits more rapidly.

The steps required to make the process work include:

• identification of the gap analysis goals

• analysis of the current process hurdles that preclude reaching the desired goal

• development of a plan to close the gap between the process’s current status and attainment of the desired goal

• a review of the proposed gap analysis plan by members of the IT department and the business units responsible for the processes to be analyzed, in order to secure agreement and commitment to the plan

• an audit at the completion of the process; the audit should determine if the goals have been met, and if those who used the process now understand it, making its future use more productive.

Process Goals

Although the example organization uses a formal project management process for all IT projects, it does not deliver high-quality projects on time and within budget. Gap analysis has identified a goal with the following components:

• Development of a two-step process to improve the delivery of IT projects within the organization. The organization will first move to a 90 percent baseline for IT project delivery, whereby the baseline is an average of all IT projects. Once the 90 percent-level is consistently achieved, the goal will be to increase to 95 percent.

• With rare exceptions, once the requesting section approves the project requirements and specifications, the project will be considered “frozen,” and no changes will be allowed. At issue here is the addition of project components for new items, or items that were left out of the original specifications. In the current development process, these items are combined into additional project phases.

To meet the improved IT project delivery times, additional items will require that a new project be developed and approved by a member of senior management. Such changes will only be allowed if they are proven to materially affect the project. If so, the original project expense and deadlines must be adjusted to compensate for the changes.

• The approved project will be delivered within a budget that is not more than 10 percent of the final budget estimate. If the original estimate is exceeded, the organization must clearly document why.

• A project reporting system will be installed for each IT project, to provide up-to-date information for everyone interested in the project. The reporting system will detail the current project status, compared to the time and dollars in the original project estimates. If any project component is behind schedule of the original project plan, there must be a plan to bring the project current.

Process Hurdles

• IT projects are habitually late and often cost considerably more than the original estimate. In the example organization, IT projects are being delivered at 75 percent of the original estimates in both dollars and time.

• The IT department has a problem controlling project scope; that is, scope creep. Once a project is approved, new items are often added, expanding the project cost and time. As the size of the project effort grows, the growth is uncontrolled. Rather, project components are regrouped into “phases,” which then become adjuncts to the original project proposals.

These problems arise because the organization spent too little time and effort on project planning and on investigating project components before it began the technical work. In addition, political issues arise when extra items are added without the appropriate consultation and approval by senior management.

• Project overruns create problems even beyond their expense. A late project adversely affects the business functions for which it was designed and approved. It also has a negative effect on morale — in both the IT department and in the business units that are anticipating the project’s completion.

IT project overruns are also associated with lost opportunity. When an IT project requires more time to complete than was originally planned, other work must be delayed, and the organization loses something of value.

• The business units and senior management are concerned that, as they move through the development process, they are not informed about the status of IT projects, there are too many project development surprises. When IT acknowledges project-related problems, there is seldom an accompanying plan to bring about the needed corrections. Nor does IT estimate the time and expense required for problem correction.

• Those business unit members assigned to IT projects do not always take an active role in project development, and there are delays when IT is forced to wait for business unit response. Business unit personnel do not understand their priorities here, but work on project issues only in their spare time.

There is another factor at work here with adverse effects. IT sometimes starts a project without a well-defined set of specifications in order to meet the deadline. As the project progresses, then, work must be redone, so the expense increases, the time lengthens, and the project team’s frustration level grows.

As these hurdles are identified, people should try not to become defensive. The intent is to accurately analyze what is impeding improvement of the IT project development process, and to cooperatively overcome the hurdles. The problems will not be resolved if the process focus shifts from hurdle identification to pinpointing responsibility for what has happened. The person in charge of the analysis process must therefore firmly control the process, maintaining proper focus.

A strong individual should therefore be appointed to manage the analysis project, in order to appropriately drive the process. This person must be as objective as possible so that the goals and hurdles are clearly and appropriately identified. The process will work most effectively when the project leader comes from outside the areas where the analysis is being conducted. Not having a turf to defend ensures greater objectivity and brings a different perspective to the issues.

PROCESS MECHANICS

Development of a plan helps close the gap between the current process status, and attainment of the desired goal. The stage is set for development of the gap analysis plan when the gap analysis process is used to provide understanding of what is to be accomplished, and identification of the hurdles.

First, all parties interested in an improved environment must agree that the goals and hurdles have been correctly identified. They must next determine the practicality of overcoming the hurdles and meeting the goals.

The parties should determine how reasonable the goals and hurdles are; that is, whether the identified work can be accomplished with a reasonable effort and time through the gap analysis process. If so, the process should go forward. If not, or if there is doubt, a greater effort will be required to address the problems.

Once agreement is reached, the plan’s development can begin, based on mapping the hurdles to the identified goals. Starting with a particular goal, the parties identify the hurdles that hinder the goal’s achievement, linking them to the goal. If additional hurdles or goals are identified as the process moves forward, they should be included.

A specific plan should be developed for each set of hurdles and goals, outlining what must be done. In the example organization above, one identified goal was to move the project’s time and budget delivery rates to 95 percent, as part of a two-step process. Several identified hurdles must be addressed to attain this goal.

First, the organization must develop a method to more accurately measure IT project delivery performance. The current process of tracking project performance is based on estimates; a different method must be introduced to for more accurate and consistent measurement. Developing more precise measurements may simply require people to carefully record the time they allocate to the project. Perhaps people incorrectly record time spent on non-project issues against the project. Until they consistently provide accurate figures, there remains uncertainty about whether the new delivery goals are being met.

A more serious issue in improving IT project delivery is that business unit personnel do not deliver project requirements and specifications on a timely basis. When the project delivery dates and budgets are set, everyone involved in the project must be willing to accept responsibility for meeting these dates and amounts. It should be a very clear process to map the hurdle of late or incomplete project specifications back to the goal of improved delivery.

Finally, the organization must address scope creep if it wishes to improve IT project delivery performance. Scope creep generally develops when items are overlooked that should have been included in the project, or people want to add extra features or components to the project as it moves forward. Therefore, before setting the project time and expense schedules, the organization must take the time to identify and include everything needed for the project in the project plan.

The gap analysis process can also suffer from scope creep. As the organization reviews the issues, it will undoubtedly wish to add goals and hurdles. However, because the process aims at rapid improvements, the organization should not become distracted with additional items. When important additions are uncovered, the organization can develop a new analysis initiative to address them.

Again, the organization should set the analysis scope appropriately and move forward to completion. A strong analysis project leader will not allow scope creep to occur.

Once the goals and hurdles are mapped, the organization must develop a detailed plan to eliminate the hurdles. It must determine the responsibilities of the people involved as well as the tasks to be completed, and develop a timetable that commits to task completion by an agreed-upon date. In addition, a process must be in place to monitor progress, thereby ensuring that the work remains on schedule.

At this point, members of the IT department and the business units responsible for the processes under analysis, must review the proposed gap analysis plan to secure agreement and commitment. Once the plan is developed, the appropriate parties must review it to ensure that the actions to be taken will meet the anticipated goals. The manager of the analysis process must communicate with the process stakeholders as the plan is being developed. This identifies areas of concern or disagreement, and early resolution of the issues. Securing agreement is straightforward when there is good planning communication, and everyone agrees with the plan’s details.

Although everyone involved in the process may not completely agree, all should understand why the goals were developed and the hurdles identified. When areas of disagreement are identified and resolved, they will not become bottlenecks as the plan goes forward.

The plan’s components plan should include the results to be achieved, the identified hurdles, the methods to be used to overcome those hurdles, the estimated time required to complete the analysis, and the roles of those involved in the process. Again, the organization must take appropriate time at the beginning to clarify the process. When planning and communication are correctly done, realizing the gap analysis goals will be a much more effective process.

There should be an audit when the process is complete that assesses three points. Thus, the audit should determine if the gap analysis goals have been met, and if those who used the process understand it well enough to make its use more productive in the future. The audit should also gauge if the gap analysis process has been proven to produce results.

Because gap analysis has potential use in many situations throughout the organization, the audit is a mandatory process component. It need not take long; it need only highlight areas of success or difficulty with the particular analysis process. The audit should also identify how use of the gap analysis process can be encouraged throughout the organization. When the process is continually sharpened and improved in this way, its use will spread to benefit the entire organization.

After several gap analysis audits, the organization will determine if the process is beneficial. If so, it might develop a set of procedures as a guide for future, successful process use. Again, because of its adaptability throughout an organization, the process knowledge should be readily available to anyone with an interest in its use.

While the organization can gain considerably from the use of gap analysis, the process can have flaws and problems. The audit can prove its worth by identifying these issues, and suggesting concrete ways of addressing them. A well-done audit will highlight the minor adjustments and changes required to fine-tune the process, resulting in its wider acceptance throughout the organization.

CONCLUSION

By solving IT problems, and addressing the concerns of business unit personnel, the gap analysis process can become a tool for communication between the two areas. Indeed, the process forces such communication because it cannot succeed without dedicated involvement from all parties involved. For process success, several groups must meet and discuss the process’s goals and hurdles. They must also agree on how to complete the analysis, and they must cooperate in order to meet the goals set forth in the plan.

Key to process success is an objective approach in dealing with the issues that surface, and avoidance of fingerpointing, as the hurdles are identified and documented. There must be no defensiveness on anyone’s part if the analysis is to deliver the expected results. Rather, the focus must be on solutions.

Cooperation between IT and its customers will increase when people understand the causes of their continuing problems, when they see that solutions can be found, and when they realize that the organization is interested in putting these solutions in place. Getting to that point will take time and patience, but there will be strong results if the process is carried out correctly.

Therefore, every IT manager should carefully consider using a gap analysis approach in dealing with IT department issues. In the worst case, the exercise will fail. However, little will be lost even in the unlikely event of failure, because the analysis process is associated with only limited risk and expense, particularly when a pilot process tests the process’s value. And the potential benefit should override any concern about risk or expense.

Add a comment
Know the answer?
Add Answer to:
1) How does change management contribute to organizational effectiveness? Please provide a well-researched technical analysis. 2)...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • This case is an effort to help employees cope with organizational change brought about by a...

    This case is an effort to help employees cope with organizational change brought about by a corporate downsizing.  Dr. Tom White served as the architect and primary change agent for this organizational development project.   Dr. White received his PhD in I/O psychology in 1985 from the University of South Florida. Immediately after graduation, he move to Australia, where he has worked as an I/O psychologist ever since.  At the time of this case he was Organization Development manager for Compaq Computer Corporation in...

  • Please read case “Hewlett-Packard Is Counting on Organizational Change to Boost Revenue Growth” Assignment Question(s):   ...

    Please read case “Hewlett-Packard Is Counting on Organizational Change to Boost Revenue Growth” Assignment Question(s):    1. Which of the super trends are driving H-P to change? 2. Which of the forces for change are causing H-P to undertake major organizational change? Explain. 3. To what extent is H-P following the four steps for fostering innovation? Explain. 4. What advice would you give Whitman based on what you learned in this chapter? Be specific. Management in Action Hewlett-Packard Is Counting...

  • Each student will conduct an in-depth case study analysis of an Information Technology Project summarized in...

    Each student will conduct an in-depth case study analysis of an Information Technology Project summarized in a professional-grade project report. You will need to contact someone in an organization who has worked on or is currently working on an IT project. This could be the project manager, a member of the project team, or the project client or sponsor. This may be a project with which you were involved; however, you must include at least one other person in order...

  • identify an organization you would be interested in studying. You will investigate the organizational behavior in...

    identify an organization you would be interested in studying. You will investigate the organizational behavior in this organization and research best practice solutions for any problems you observe. You may select your own organization, the organization of a family member, or an organization that interests you. Be sure to review each week’s assignments before selecting the organization to make sure you can locate necessary information. Contact your instructor early in the week if you need advice on your organizational selection....

  • Human Resource Management 1. Identify and briefly describe any four HR activities in an organization. 2....

    Human Resource Management 1. Identify and briefly describe any four HR activities in an organization. 2. List six competitive challenges faced by Canadian organizations. Describe and give an example of any one of the six challenges faced by an organization you are familiar with. 3. Define strategic HRM and how it is linked to an organization’s business strategy. Provide an example. 4. Define and give three examples of one human right legal concept affecting managers and HRMs 6.What is the...

  • Case 2.1: Organizational Culture Can Help Reduce Burnout in Hospitals There are more than 5,600 hospitals...

    Case 2.1: Organizational Culture Can Help Reduce Burnout in Hospitals There are more than 5,600 hospitals in the United States that admit a total of approximately 35 million patients each year, so it is no surprise that there is a great amount of pressure on physicians, nurses, staff, and hospital administrators to provide top quality care with the utmost urgency and accuracy. The services these health care professionals provide are invaluable and the decisions they make can have a lasting...

  • research

    From the below.docxkainaat1102 hours agoBusinessCollegeFrom the below-mentioned research paragraph, extract the following information:I. Identify the research gap.II. Identify the research objective of the study.III. On the basis of the research, the objective suggests the research question of the study.IV. Identify the theory used in the study.V. Suggest a title for this research paragraph.Retaining employees is one of the critical issues faced by the organization all over the globe for many years, that how to retain some of the skilled and...

  • 1.what is the fundamental of knowledge management cycle or process? 2. what is knowledge cycle? 3....

    1.what is the fundamental of knowledge management cycle or process? 2. what is knowledge cycle? 3. what is intellectual capital and three dimension of intellectual capital? 4. what is human capital? discusion with example 5. what is knowledge sharing and organization learning? 6. what is organization culture? 7. cultural impact of knowledge sharing? 8. what is data mining? 9. what is knowledge discover? UNIVERSAL Chapter 1 Knowledge Management Overview UBSS SCHOOL SYDNEY Introduction to Knowledge Management (KM) In a knowledge...

  • Please help writing a well structured document using the below Agile Runbook - Our Overall Delivery Process How do we initiate a Project? Any project is a response to a pain point or desire expresse...

    Please help writing a well structured document using the below Agile Runbook - Our Overall Delivery Process How do we initiate a Project? Any project is a response to a pain point or desire expressed by either customers, internal stakeholders, employees, or regulatory authorities. In short, a project is a time bound and specific goal oriented task-system that is born out of an ask from any stakeholder. Project initiation is laying down a new project by defining its goals, objectives,...

  • QUESTIONS 1. Differentiate broadly between financial accounting and managerial accounting. 2. Differentiate between "financial statements" and...

    QUESTIONS 1. Differentiate broadly between financial accounting and managerial accounting. 2. Differentiate between "financial statements" and "finan- cial reporting." 3. How does accounting help the capital allocation process? 4. What is the objective of financial reporting? 5. Briefly explain the meaning of decision-usefulness in the context of financial reporting 6. Of what value is a common set of standards in financial accounting and reporting? 7. What is the likely limitation of general-purpose finan- cial statements"? 8. In what way is...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT