Imagine that you are the engineering manager for Ellery Manufacturing, Suite 110 - 19433 96th Avenue, Surrey, British C...

Imagine that you are the engineering manager for Ellery Manufacturing, Suite 110 - 19433 96th Avenue, Surrey, British Columbia, Canada V4N 4C4. http://www.ellerymfg.com
Your company has won a very large contract to manufacture parts for a gas pipeline company located in Alberta. In order to meet the deadline set by your client, you need to purchase a new manufacturing machine (a special purpose lathe). You convinced your employer to purchase the new machine from a company in China: Zhengzhou Timeway Machine Tool Co., Ltd., 5-1-16,S/W Zone, North Circle Sangyuan Road, Zhengzhou, Henan, China. Similar machines can be found in Canada and the United States, but they are not easily available and cost would be much higher.
When the equipment, costing US$220,000, arrived yesterday, you discovered that the equipment does not suit your company's needs. You determined that your company would have to spend about US$23,000 to modify the equipment to meet your particular needs and it could take several weeks to complete the modification.
Alternatively, you could ship the machinery back to the supplier (for about US$5,000). However, you would then have to locate another machine from another supplier, order it, have it sent to you, and install it. This would put your company behind schedule.
You look again at the description of the control unit which you saw on the company's website, and realize that it doesn't adequately describe the equipment's specifications. Perhaps you made a mistake in not looking more carefully at the specifications, or perhaps the website is not accurate. (This may be due to the language barrier and the lack of details presented on the website.)
Write a letter (to be faxed or e-mailed) to Xie Xiaohua, Export Sales Division. You must first decide what is the best solution for the problem, then explain the solution clearly and concisely. You are responsible for solving the problem quickly and efficiently. You need to save your company money, but you also want to make sure your company can complete its work within the deadlines agreed on with your client.
You can make up other details that you would know if you were in the situation described above, such as the equipment's exact name, what it does, when it was ordered, and when it arrived at your plant. You can also check the hyperlinks to find out more about your employer's company and the supplier's company.

Do a strategy analysis (SMART or CAP) before you begin and write the letter as if your job depends on it. You aren't required to show your analysis for this assignment, but I'll be able to determine, from your letter, whether you've done an adequate strategy analysis.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

-Jringt falla The Yeasan is bez. this the SM ART Iam dving asy_batps in frojict problems hch lnvee tm &not Tesawerf tobe चण्ल

Qand tho eguised drap Aoran fowales To Kadhua ort Sal Dvisian |bhkgece_Regasdi kquipe Heo Sir Ma a m Careetingu ) ampany 1c

Add a comment
Know the answer?
Add Answer to:
Imagine that you are the engineering manager for Ellery Manufacturing, Suite 110 - 19433 96th Avenue, Surrey, British C...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • You work for a company that makes cell phones and have been made the project manager...

    You work for a company that makes cell phones and have been made the project manager for the design of a new cell phone. Your supervisors have already scoped the project, so you have a list showing the work breakdown structure, and this includes major project activities. You must plan the project schedule and calculate project duration. Your boss wants the schedule on his desk tomorrow morning! You have been given the information in Table-1 below. It includes all the...

  • 1. You work for a large Canadian non-profit organization that holds a big annual conference. The...

    1. You work for a large Canadian non-profit organization that holds a big annual conference. The conference rotates throughout Canada on a yearly basis. A resort and conference company in Hawaii invites you and one other person down for a one-week paid vacation so that you can check out their conference facilities. Should you: Select one: a. Accept the vacation if the majority of the conference attendees are in favour of holding the conference in Hawaii? b. Accept the vacation...

  • Problem description: You are a line manager in Superior Car Part’s Ellisville manufacturing facility. The company...

    Problem description: You are a line manager in Superior Car Part’s Ellisville manufacturing facility. The company produces automotive parts, and you have responsibility for the line producing steel shafts for the gearbox manufactured in the Ellisville Plant. The acceptable dimension of the shaft is 2.5±0.05 inches in diameter with the most desirable product having a diameter of exactly 2.5 inches. The current equipment is approaching the end of its useful life and needs to be replaced. Two vendors are trying...

  • Instructions In order to complete your case analysis successfully, you should consider identifying the role you...

    Instructions In order to complete your case analysis successfully, you should consider identifying the role you are playing and the tasks you need to perform, analyzing the issues (qualitatively and quantitatively), providing a solution to the problem, and recommendation for each issue identified in the case. An average grade will come from you answering all questions with basic coverage and accuracy, showing all your work. Additional points come from including greater detail, astute and informed commentary where appropriate, and connections...

  • Imagine that you are human resource manager asked to review a job description for a Chief...

    Imagine that you are human resource manager asked to review a job description for a Chief Financial Officer opening at your company. The finance department mentioned that they have had a lot of difficulty retaining talent because of long hours, outdated technology, and isolation from the operational departments so they need positive change from their new leader. You know it will be critical to get the right person in the role to improve business processes which should in turn increase...

  • In the final project for this course, you will imagine that you are an IT business...

    In the final project for this course, you will imagine that you are an IT business analyst intern at Sharpe Style in the scenario provided and have been asked by the owner to research options for improving the business’s performance through the use of technology. Specifically, the owner wants to expand the business’s retail presence into online sales and ensure a positive customer experience by incorporating intelligent systems into the website. You will create a business report for business owner...

  • Overview In this assignment, you will take on the role of a senior member of the...

    Overview In this assignment, you will take on the role of a senior member of the finance team assigned to lead the investment committee of a medium-sized telecommunications equipment manufacturer. Your team is evaluating a “make-versus-buy” decision that has the potential to improve the company’s competitiveness, but which requires a significant capital investment in new equipment. The assignment is organized into two parts: Part A: Data calculations based on the information in the scenarios Part B: Recommendations based on the...

  • Sturdy Furniture Ltd. Sturdy Furniture Ltd. is a Canadian manufacturer of public site furniture products. Sturdy’s...

    Sturdy Furniture Ltd. Sturdy Furniture Ltd. is a Canadian manufacturer of public site furniture products. Sturdy’s products are designed for use in public places such as parks, malls, town squares—high-traffic locations that require high-quality, durable, and attractive furniture. Sturdy’s products include benches, bike racks, planters, recycling bins, and trash containers. Sturdy has a loan outstanding from the Bank of Ontario and is looking to increase the loan to help finance its ongoing expansion. It’s late October 2019. You are a...

  • Bakground: Duraweld is a British plastic binding manufacturer established in 1959 and the result of a...

    Bakground: Duraweld is a British plastic binding manufacturer established in 1959 and the result of a merger between two local small and medium enterprises (SMEs) in 1970. This company has sailed through the recent economic downturn and has reinvented itself thanks to following lean principles. Duraweld produces customized plastic elements, such as stationery, and decided to move away from standardization to resist the growing competition from Asia on higher volume items resulting in low volume/high variety production profile. Their website...

  • Overview In this assignment, you will take on the role of a senior member of the...

    Overview In this assignment, you will take on the role of a senior member of the finance team assigned to lead the investment committee of a medium-sized telecommunications equipment manufacturer. Your team is evaluating a “make-versus-buy” decision that has the potential to improve the company’s competitiveness, but which requires a significant capital investment in new equipment. The assignment is organized into two parts: Part A: Data calculations based on the information in the scenarios Part B: Recommendations based on the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT