The following table lists the components needed to assemble an
end item, lead times (in weeks), and quantities on hand.
Item | Lead Time | Amount on Hand |
Direct Components | |||
End | 2 | 0 | L(2), C(1), K(3) | |||
L | 2 | 8 | B(2), J(3) | |||
C | 3 | 12 | G(2), B(2) | |||
K | 3 | 17 | H(4), B(2) | |||
B | 2 | 32 | ||||
J | 3 | 27 | ||||
G | 3 | 5 | ||||
H | 3 | 0 | ||||
a. If 43 units of the end item are to be
assembled, how many additional units of B are needed?
(Hint: You don’t need to develop an MRP plan.)
Additional units
b. An order for the end item is scheduled to be
shipped at the start of week 13. What is the latest week that the
order can be started and still be ready to ship on time?
(Hint: You don’t need to develop an MRP plan.)
The latest week
For producing 43 end units,
L units needed = 43*2 -8 = 78
C units needed = 43*1-12 =31
K units needed = 43*3-17 =112
additional Number of B units needed = 2*( 78+31+112)-32 = 410
2. For shipping order at start of week 13, it should start at the start if week 11.
For having L,C and K at start of week 11, they should start manufacturing L in week 9 and C,K in week 8.
B needs to start in week 6. J needs to start in week 6 while other components should start in week 5.
5 is the earliest week in which the work must start.
The following table lists the components needed to assemble an end item, lead times (in weeks),...
The following table lists the components needed to assemble an end item, lead times (in weeks), and quantities on hand. Item Lead Time Amount on Hand Direct Components End 3 0 L(2), C(1), K(3) L 3 12 B(2), J(3) C 4 15 G(2), B(2) K 4 21 H(4), B(2) B 3 32 J 4 27 G 4 5 H 3 0 a. If 43 units of the end item are to be assembled, how many additional units of B are...
The following table lists the components needed to assemble an end item, lead times (in weeks), and quantities on hand on Hand Iten End Direct Components L(2), C(1), K(3) B(2), (3) G(2), B(2) H(4), B(2) a. If 43 units of the end item are to be assembled, how many additional units of B are needed? (Hint You don't need to develop an MRP plan.) Additional units C b. An order for the end item is scheduled to be shipped at...
The following table lists the components needed to assemble an end item, lead times (in weeks), and quantities on hand. ts Direct C End rded B(2), 3(3) G(2), B(2) H(4), B(2) 12 21 32 103 a. If 43 units of the end item are to be assembled, how many additional units of B are needed? (Hint You don't need to develop an MRP plan.) 405 0 Additional units b. An order for the end item is scheduled to be shipped...
The following table lists the components needed to assemble an end item, lead times (in weeks), and quantities on hand L12), c(1),x(3) B(2), 33) G(2), 8(2) H(4), B(2) 13 16 21 29 a. f 43 unts of the end item are to be assembled, how many additional units of B are needed? (Hint You don't need to develop an MRP plan) Additional units b. An order for the end item is scheduled to be shipped at the start of week...
The following table lists the components needed to assemble an end item, lead times, and quantities on hand. Item End B C D E F G H LT (wk) 2 2 1 1 1 2 1 2 Amount on hand 0 11 8 26 12 30 7 0 A. If 21 units of the end item are to be assembled, how many additional units of E are needed? (Hint: You don't need to develop an MRP plan to determine this.)...
The following table lists the components needed to assemble an end item, lead times, and quantities on hand. G Item LT (wk) Amount on hand End 2 0 B 2 11 C 1 8 D 1 26 E 1 12 F 2 30 1 H 2 0 7 End Item B (2) C D (3) E (2) F(3) G (2) E (2) H (4) E (2) a. If 21 units of the end item are to be assembled, how many...
The following table lists the components needed to assemble an end item, lead times, and quantities on hand. E Item LT (wk) Amount on hand End 2 0 B 2 11 C 3 8 D 3 26 1 F 2. 31 G 1 3 INO 12 End Item B (2) с D (3) E (2) F(3) G (2) E (2) H (4) E (2) a. If 19 units of the end item are to be assembled, how many additional units...
The following table lists the components needed to assemble an end item, lead times, and quantities on hand. End H Item LT (W) Amount on hand 1 B 3 10 с 4 9 D 4 25 E 2 11 F 1 26 G 2 7 1 0 o End Item B12) с D (3) E (2) F (3) G 21 E (2) H14) E (2) a. If 24 units of the end item are to be assembled, how many additional...
The following table lists the components needed to assemble an end item, lead times, and quantities on hand. Item End B C D E F G H LT (wk) 2 2 2 2 1 2 1 2 Amount on hand 0 11 8 26 12 28 6 0 a. If 20 units of the end item are to be assembled, how many additional units of E are needed? (Hint: You don't need to develop an MRP plan to determine this.)...
The following table lists the components needed to assemble an end item, lead times, and quantities on hand. End с D E F G H Item LT (wk) Amount on hand 1 B 3 7 1 1 1 1 1 1 0 12 22 8 29 5 0 End Item B (2) C D (3) E (2) F (3) G (2) E (2) H (4) E (2) a. If 21 units of the end item are to be assembled, how...