Use the Gantt chart below to answer this question. Task 1 Job 1 (CT= 12 min Task 2 (CT-20 min Task 3 Job 2 Job 3 Job 2 Job 3 Job 1 Job 3 16 min) 20 The bottleneck cycle time is「minutes. Enter an integer for your answer (no decimals). What is the capacity of this system ? jobs per hour. Integer answer The expected lead time (LT) for a typical job entering the system shown in the Gantt chart isminutes. Integer answer.

0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
Use the Gantt chart below to answer this question. Task 1 Job 1 (CT= 12 min...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • Question 1: Sequence the jobs shown below by using a Gantt chart. Assume that the move...

    Question 1: Sequence the jobs shown below by using a Gantt chart. Assume that the move time between machines is one hour. Sequence the jobs in priority order 1, 2, 3, 4. Job Work Center/Machine Hours                                  Due Date (days) 1 A/3, B/2, C/2 3 2 C/2, A/4 2 3 B/6, A/1, C/3 4 4 C/4, A/1, B/2 3 Using finite capacity scheduling, draw a Gantt chart for the schedule (Marks 0.5) What is the makespan? (Marks 0.5) How much machine...

  • Solve the following Job Sequencing problem. Draw Gantt chart. Find total time elapsed to complete the...

    Solve the following Job Sequencing problem. Draw Gantt chart. Find total time elapsed to complete the jobs and idle time for machines. Job/Machine M1 M2 M3 1 5 9 8 2 3 6 7 3 4 7 6 4 2 8 9 5 6 7 5 6 4 6 9

  • Question 7: Short Answer Questions 1) What are Gantt chart and precedence network? Compare a Gantt...

    Question 7: Short Answer Questions 1) What are Gantt chart and precedence network? Compare a Gantt chart and a precedence network. 2 What is a critical activit 3) What approaches do supermarkets used to reduce waiting time? 4) Explain Little's Law Formula: L AW 5) What information can be gleaned from a bill of materials? If you were asked to produce an item based solely on a copy of its BOM, what missing information would you need?

  • Adam (with the same machine) performs tasks 1 and 2. After running a setup on the...

    Adam (with the same machine) performs tasks 1 and 2. After running a setup on the machine, he performs task 1 on every unit in a batch. Then, he runs another setup on the same machine before performing task 2 on every unit in the batch. After that, either Brad or Chloe performs task 3 on the units. Finally, Dorothee does task 4. Tasks 3 and 4 are done by the workers only so they do not require any setups....

  • Chapter - Project Management This assignment involves creating a Gantt chart using the GanttProject software. 1)...

    Chapter - Project Management This assignment involves creating a Gantt chart using the GanttProject software. 1) Use the attached example task list to create a new Gantt chart. Make sure you indicate the task dependencies from the task list. Use the IDs assigned by the site, not the ones in the example. 2) Add two new tasks: the 1st between "Programming" and "Program Test" called "Code Review" with duration 3 days, and the 2nd between “Write User Manual” and “User...

  • Question Completion Status: Question 1 11 points Save Answer The School of Dentistry at Penn provides...

    Question Completion Status: Question 1 11 points Save Answer The School of Dentistry at Penn provides general dental care to residents of Philadelphia on a walk-in basis. Upon arrival, customers first provide health- relevant information such as personal health records and insurance provider to a receptionist who enters the information into a computer system for the dentist to see. This step takes 4 minutes on average. A dental assistant then takes an X-ray of the patient. This step takes 15...

  • 1. The capacity of server 3 is ______ orders per hour? 2. The capacity of Server1 + Server 2 is _...

    1. The capacity of server 3 is ______ orders per hour? 2. The capacity of Server1 + Server 2 is ______ orders per hour? 3. Which one is the bottleneck? 4. The capacity of the process is ______ orders per hour. 5.The cycle time of Server 1 + Server 2 is ______ minute(s)? 6. The flow time of the process is ______ minutes? Server 1 Download Server 2 Server 3 [ → Finished →L-Download- Validate Order order 2 min/order For...

  • ANSWER #23 22. An Ice cream shop in Queens offers a wide selection of ice cream...

    ANSWER #23 22. An Ice cream shop in Queens offers a wide selection of ice cream and frozen yogurt. It has three employees. Assuming that there is unlimited demand. Employee #1 – greets the customer and takes an order – 3 minutes per customer. Employee #2 - prepares an order- 6 min per customer. Employee #3 – takes payments – 5 min per customer. 22. a. Capacity of Employee 1 =Flow rate * 60=1/3 *60 =20 customers per hour b.Bottle...

  • Problem 4 (16 points) Consider a typical patient's stay in the emergency department (ED). On average,...

    Problem 4 (16 points) Consider a typical patient's stay in the emergency department (ED). On average, 10 patients arrive to the ED per hour. Triage: Once a patient arrives, he/she is first triaged at the triage station which is staffed with one triage nurse. The triage process takes 5 minutes on average. Initial Consultation: After triage, the patient goes through initial consultation with a nurse who takes information on the patient's demographics, medical history, allergies, etc. On average, initial consultation...

  • Please show all written work as I am having trouble finding my way through the solution...

    Please show all written work as I am having trouble finding my way through the solution to this problem. Thank you in advance! Question 4 (12 points: 1, 2, 2, 2, 5) Consider the three-stage process shown here (a) What is the minimum TPT? (b) Calculate hourly capacity of each stage. G1 6 min 6 min D1 4 min W2 G2 6 min min Consider the following schedule. Jobs are numbered 1, 2, 3, 4 and so on. Jobs are...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT