Question

Question 2. (30%) The following table provides the information necessary to construct project network and calculate...

Question 2. (30%)

The following table provides the information necessary to construct project network and calculate a total project cost. In case of activity crash, the information includes crash cost for each activity.

Activity

Immediate predecessor(s)

Activity time (weeks)

Normal cost (x1000$)

Additional cost for crashing one week (x1000$)

Normal

After maximum crash

A

-

16

12

2,000

300

B

-

14

9

1,000

160

C

A

8

6

500

100

D

A

5

4

600

700

E

B

4

2

1,500

750

F

C

6

4

800

400

G

D, E

15

14

5,000

600

H

F, G

10

9

3,000

500

Crash the project network the maximum amount possible and make sure that the new crush adds minimum cost every time. Show the changes in total project duration and the total project cost for every crush.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

nswer yashing the project nelunrk diagram No. 12 12 20 10 26 u30 6 512 43 18 33 2115 36 x300 20 26 3 32 2 DIA 12 D11 35 18 1720 Date one wee 01E126. 30 H 39 019 12 Oinn NowA r (ashing imum time, AF n00 300 に3320 atey lashing

Add a comment
Know the answer?
Add Answer to:
Question 2. (30%) The following table provides the information necessary to construct project network and calculate...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1) Based on the given information regarding the activities for the project, the project length= ___...

    1) Based on the given information regarding the activities for the project, the project length= ___ weeks. 2) The total cost required for completing this project on normal time= $____ 3) For reducing the duration of the project by one week, the activity that should be crashed first is activity ___. 4) The cost of the project based on the first activity selected for crashing will increase by $___. 5) The maximum weeks by which the project can be reduced...

  • Consider the project network information in Table 1 of Case Study A on Page 3 below....

    Consider the project network information in Table 1 of Case Study A on Page 3 below. Assuming the project starts at time zero and all activity connections are finish-to-start, draw an Activity on the Node (AON) network diagram of the project, determine the expected project completion time, state the critical activities and critical path(s). Crash the project by 1 week and state the total crash cost. (b) (18 narl Case Study A Table 1 below contains activities associated with a...

  • Consider the project network information in Table 1 of Case Study A on Page 3 below....

    Consider the project network information in Table 1 of Case Study A on Page 3 below. Assuming the project starts at time zero and all activity connections are finish-to-start, draw an Activity on the Node (AON) network diagram of the project, determine the expected project completion time, state the critical activities and critical path(s). Crash the project by 1 week and state the total crash cost. (b) (18 nar Case Study A Table 1 below contains activities associated with a...

  • 2. A student has developed a project and is interested in accelerating the schedule. Below network diagram (Activity on...

    2. A student has developed a project and is interested in accelerating the schedule. Below network diagram (Activity on Arrow) and table show all information needed. Partial crashing is available. Show your work for crashing. Accelerated Duration Cost Present Duration Cost $100 4 $50 5 $250 2 $200 3 a h 3 $100 $350 C d 3 $100 cannot accelerate 6 $100 $150 e f 7 $300 5 $600 a) Without any crashing (acceleration), how long is the project expected...

  • Development of Version 2.0 of a particular accounting software product is being considered by Jose Noquera's...

    Development of Version 2.0 of a particular accounting software product is being considered by Jose Noquera's technology firm in Baton Rouge. The activities necessary for the completion of this project are listed in the following table: To Cost Normal Time (weeks) Crash Time Normal with Activity (weeks) Cost Crashing Immediate Predecessor(s) $2.700 A $2,000 7 $2,300 S3,100 3 $500 $500 S2,300 $2,580 A E 5900 $1.275 F F $3.400 2 S4,800 C G $1,500 $2.100 D, E a) Based on...

  • Use a PERT network to establish the expected duration for the project described in the table...

    Use a PERT network to establish the expected duration for the project described in the table below:    (SHOW the PERT NETWORK) Activity Predecessors Duration a        m       b Exp. Duration Var. Crash Week 1 Crash Week 2 A - 3 6 9 700 100 B A 6 7 14 600 200 C A 4 6 14 400         600 D B, C 4 6 8 200                             600 E B, C 6 9 12 400 300 F C 4 6 14...

  • hi need answers for this urgently thanks Question 2 (20 Marks) a) Given the following project...

    hi need answers for this urgently thanks Question 2 (20 Marks) a) Given the following project details, identify the project's critical path; Activity Predecessor A B Duration (Man Days) 5 10 12 8 6 15 D Ε F B, C GE CD G H 20 18 30 5 I,J к F, L M (10 Marks) Continued... b) Given the information below, identify how much it would cost for each day you crash the schedule. Determine the total cost for crashing...

  • What is the minimum cost of crashing the following project that Roger Solano manages at Slippery Rock University by 4 da...

    What is the minimum cost of crashing the following project that Roger Solano manages at Slippery Rock University by 4 days? Please show work and calculations. NORMAL CRASH TIME ACTIVITY (DAYS) (DAYS) TIME NORMAL CRASH COST IMMEDIATE COST PREDECESSOR(S) 900 $1,000 B 300 400 C 4 3 500 600 5 3 900 1,200 A 5 1,000 1,600 C LO LO C Ln LLI NORMAL CRASH TIME ACTIVITY (DAYS) (DAYS) TIME NORMAL CRASH COST IMMEDIATE COST PREDECESSOR(S) 900 $1,000 B 300...

  • Non wission er absurd submisen Problem [10 points The following table provides the informationery a project...

    Non wission er absurd submisen Problem [10 points The following table provides the informationery a project to appet crash data Activity Cost data is cost per week ez. A week is the cost of crashing for ce week Cath the propetas much as po. Mas lowance for crash 55.000/werk Activity Activity Activity Activity Time (weeks) Costis Predecessor Normal Crash Normal Crash 16 2000 4400 14 1.000 1.800 500 700 5 600 1.300 4 2 1.500 6 4 800 1000 10...

  • Question 8-10, CHAPTER 18: A home-remodeling project consists of eight activities. The immediate predecessors and activity...

    Question 8-10, CHAPTER 18: A home-remodeling project consists of eight activities. The immediate predecessors and activity times in weeks are shown below. Activity Predecessor(s) Normal Time Crash Time Normal Cost $400 Crash Cost $700 1600 2000 800 1100 1000 NNW 600 1200 1450 800 800 500 650 400 600 900 1300 F G H1 1000 650 8. Draw the network for this project. (10 points) 9. Please indicate the Earliest Start, Earliest Finish, Latest Start, and Latest Finish on the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT