Question
solve the top problem only
riday homework By use of the deflection the unit at ce load me that determine 30/0 24/4 E 29000 ki I: 500 m Cale. the vertica
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Note:- 1. This question is solved by unit load method

2. Moment calculation is understood.bellection at G 30 By unit load method Afrond { 2 KYO 840 C 4Q) 4Q 2€ De (mm dx O origjio beam ond Beer O EL I KN Ec29000 kNMam du €1 ( 23.2x - 1.5x2)(0.4x) dx -2x18+ 2) - 1 +1.5**} {0.4 (8+x)}the 5 416.8(4+x) - ( 4*32)2 + x2}{0.6(4+2)} du o 4 + | (

Add a comment
Know the answer?
Add Answer to:
solve the top problem only riday homework By use of the deflection the unit at ce...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 3. (5) Determine the vertical deflection of joint D produced by the 30-kip horizontal load. For...

    3. (5) Determine the vertical deflection of joint D produced by the 30-kip horizontal load. For all bars, A = 1.5 in? and E = 29000 ksi. P = 30 kips - 124 TASNUVAS _ O_._ 4. (5) For Problem 3 above, reduce the deflection by a factor of two by increasing the area of only three members from 1.5 in2 to 3.0 in2. Verify using RISA or STRIAN.

  • USE SLOPE-DEFLECTION METHOD Problem 3. Solve the moments at all joints and supports of the given...

    USE SLOPE-DEFLECTION METHOD Problem 3. Solve the moments at all joints and supports of the given frame using slope-deflection method. Assume B, C, and E are fixed connected and A and D are pins. E = 29 x 10ksi. 0.5k/ft 2k Inc = 400 in c 8'ft ICE = 400 in 3k Ipc = 500 in LAB = 600 in 8'ft 24 ft 12 ft

  • 2. Use the double integration method to solve for the requested quantities. (Use whatever coordinate system...

    2. Use the double integration method to solve for the requested quantities. (Use whatever coordinate system you desire for the generation of the equations. You will then use your equations to solve for the quantities at the specific locations.) (20pts) Determine for 6, and Ac where E 1.99. 106 psi and I-950 in' 1 klf El 15 ft 5 ft 3. Use the virtual work method to determine the deflection of each of the joints indicated. E 29,000 ksi. Find...

  • 2. Use the double integration method to solve for the requested quantities. (Use whatever coordinate system...

    2. Use the double integration method to solve for the requested quantities. (Use whatever coordinate system you desire for the generation of the equations. You will then use your equations to solve for the quantities at the specific locations.) (20pts) Determine for 6, and where E-1.99-10° psi and 950 in' 1 klf EI 15 ft 5 ft 3. Use the virtual work method to determine the deflection of each of the joints indicated. E ksi. Find ΔΕΧ and Bar areas:...

  • how do I solve this problem? Homework 3.1 5- A projectile is shot from the edge...

    how do I solve this problem? Homework 3.1 5- A projectile is shot from the edge of a cliff 115 m above ground level with an initial speed of 65.0 m/s at an angle of 35.0° with the horizontal, as shown in Fig. 3-44. (a) Deter- mine the time taken by the projectile to hit point P at ground level. (b) Determine the distance X of point P from the base of the vertical cliff. At the instant just before...

  • Hello I need help trying to solve this homework problem! Use only radicals and fractions in...

    Hello I need help trying to solve this homework problem! Use only radicals and fractions in solving this problem! Please be accurate in your answer! Thank you! Find the exact value of each of the remaining trigonometric functions of 0. Rationalize denominators when applicable. 15 cot O= given that is in quadrant IV 6 Select the correct choice below and, if necessary, fill in the answer box to complete your choice. O A. sin e- (Simplify your answer, including any...

  • please help me solve part B it is drawing please be clear To use a load...

    please help me solve part B it is drawing please be clear To use a load diagram to determine internal axial forces and to calculate axial deformations. The axially loaded bar with circular cross-section is loaded and supported as shown below. The bar is made of aluminum 2014-T4 and has a modulus of elasticity, E, of 10,600 ksi. The lengths of segments AB, BC, and CD are 2, 1.5, and is 2.5 ft, respectively and the diameters of the segments...

  • solve no: 3.14 , 3.16, 3.19 please show each step and solve for beginners 120 Power...

    solve no: 3.14 , 3.16, 3.19 please show each step and solve for beginners 120 Power System Analysis 3.12. A single-phase system similar to that shown in Figure 3.11 has two transformers A-B a B-C connected by a line B feeding a load at the receiving end C. The ratings and parame ter values of the components are 500 V/1.5 kV, 9.6 kVA. leakage reactance 5 % 1.2 kV/120 V, 7.2 kVA, leakage reactance 4 % series impedance (0.5 +...

  • answers are not correct, help me please"L = 4663.79 C = 5087.77" Assignment: CH4 Homework TO Problem 14 03 Algo (A Production Application: Par tac. Revtsited) Questions eBook t the amount of...

    answers are not correct, help me please"L = 4663.79 C = 5087.77" Assignment: CH4 Homework TO Problem 14 03 Algo (A Production Application: Par tac. Revtsited) Questions eBook t the amount of steel produced (in tons). Steel production is related to the amount of labor used (4) and the amount of capital used (C) by the following function: 4Let S represent S 10 10.2 co.a In this formula L represents the units of labor input and C the units of...

  • Problem 3. The figure below shows a typical process chart. a. Complete the summary (top right)...

    Problem 3. The figure below shows a typical process chart. a. Complete the summary (top right) portion of the chart. b. Step 1 takes 2.5 minutes, so the maximum number of units that can be processed is 60/2.5 24 per hour. Step 2 takes 2.0minutes, so the maximum output is 30 per hour. By going similarly through each step, determine the maximum output of the whole process (this is the bottleneck). Assume the process variable cost is $25 each time...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT