Question

U US TUF IBUJOBS (A, B, C, D) are 3, 4, 5, and 8 days, respectively. Due dates are day 6, 7, 9, and 12, respectively. Assume
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer- B 12

Waiting Time for a job = Time required to complete the previous jobs

Since Job A is the first job in the sequence, there shall be no waiting time. So, Waiting time = 0

For Job B, waiting time shall be the time required to complete Job A. So, Waiting time = 3 days.

For Job C, waiting time shall be the time required to complete Job A and Job B. So, Waiting time = 3 + 4 = 7 days

For Job D, waiting time shall be the time required to complete Job A, Job B and Job C. So, Waiting time = 3 + 4 + 5 = 12 days

Job Process time Waiting Time Due Date
A 3 0 6
B 4 3 7
C 5 7 9
D 8 12 12

Therefore, the waiting time for Job D is 12 days.

Add a comment
Know the answer?
Add Answer to:
U US TUF IBUJOBS (A, B, C, D) are 3, 4, 5, and 8 days, respectively....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • a) Using the FCFS​ (first come, first served​ ) decision rule for sequencing the​ jobs, the...

    a) Using the FCFS​ (first come, first served​ ) decision rule for sequencing the​ jobs, the order is​ (assume that jobs came in the order in which they are listed in the​ table): Sequence Job 1 A 2 B 3 C 4 D 5 E The average tardiness​ (job lateness) for the sequence developed using the FCFS rule​ = ___ days ​(round your response to two decimal​ places). The following jobs are waiting to be processed at the same machine...

  • Q-22-23.20 Homework – Unanswered. Due in 5 days A convex lens of focal length 5 cm...

    Q-22-23.20 Homework – Unanswered. Due in 5 days A convex lens of focal length 5 cm is used as a magnifying glass. At what distance from a tiny insect should you hold this lens to get a magnification of +4.3? O A 4.33 cm O B 4.76 mm 0 C 3.86 mm O D 3.84 cm Submit Unanswered Q-22-23.20 Homework – Unanswered. Due in 5 days A convex lens of focal length 5 cm is used as a magnifying glass....

  • Five jobs are waiting to be processed. Their processing times and due dates are given below....

    Five jobs are waiting to be processed. Their processing times and due dates are given below. Using the shortest processing time dispatching rule, in which order should the jobs be processed? Processing Time (days) Job due date (days) Job A B 4 C 11 D 8 5 8 O A. D, A, E, B, C О в. D. В. Е. А. С О С. С. А, Е, в.р O D. C, E, A, B, D O E. B, D, A,...

  • Q2aQ5 Homework. Unanswered. Due in 6 days b. Stage of apple ripeness. (eg, underripe, ripe, overripe)...

    Q2aQ5 Homework. Unanswered. Due in 6 days b. Stage of apple ripeness. (eg, underripe, ripe, overripe) Identify whether it is a numerical or categorical variable. Further specify if it is discrete or continuous versus nominal or ordinal. o A numerical, discrete B numerical, continuous O с categorical, nominal 0 D categorical, ordinal Unanswered Submit Q2aQ6 Homework . Unanswered • Due in 6 days The average distance one college student can run in half an hour. Identify whether it is a...

  • The following jobs are waiting to be processed at a small machine​ center: JOB DUE DATE...

    The following jobs are waiting to be processed at a small machine​ center: JOB DUE DATE DURATION (DAYS) 10 240 18 20 232 14 30 240 6 40 245 30 50 255 26 All dates are specified as manufacturing planning calendar days. Assume that all jobs arrived on day 200 ​(yesterday) in the order shown but are not scheduled to begin until day 201 (today). a. Sequence the jobs according to LPT According to the LPT rule, the sequence of...

  • 1. Five jobs are waiting to be processed. Their processing times and due dates are given...

    1. Five jobs are waiting to be processed. Their processing times and due dates are given below. Using the longest processing time dispatching rule, in which order should the jobs be processed? All dates are specified as days from today. Job Processing Time (days) 4 Job due date (days) 7 A B 7 4 11 с 3 D 8 5 E 5 8 A) D, B, E, A, C B) C, A, E, B, D C) B, D, E, A,C...

  • The following jobs are waiting to be processed at a small machine​ center: JOB DUE DATE...

    The following jobs are waiting to be processed at a small machine​ center: JOB DUE DATE DURATION (DAYS) 10 260 8 20 252 18 30 260 26 40 270 32 50 275 14 All dates are specified as manufacturing planning calendar days. Assume that all jobs arrived on day 200 ​(yesterday) in the order shown but are not scheduled to begin until day 201 (today). a. Sequence the jobs according to LPT? b. What is the average completion (flow) time?...

  • Question 61 Homework. Unanswered. Due in 3 days A0.25-4F capacitor is connected to a 400-V battery....

    Question 61 Homework. Unanswered. Due in 3 days A0.25-4F capacitor is connected to a 400-V battery. What potential energy is stored in the capacitor? O A 1.2 10-12 O B 10*10-43 O C 0.040 OD 0020 Unanswered

  • Given the following set of jobs waiting to run on a machine, use the Slack (least...

    Given the following set of jobs waiting to run on a machine, use the Slack (least slack time remaining) dispatching rule to sequence the jobs. Job Days Until Due Date Processing Time A 35 30 B 27 17 C 33 30 D 41 25 A. A,B,C,D B. B,C,D,A C. C,A,B,D D. B,C,A,D E. none of the above

  • a) Using the FCFS (first come, first served) decision e for sequencing the jobs, the order...

    a) Using the FCFS (first come, first served) decision e for sequencing the jobs, the order is t Richard's Machine Shop, following jobs (below) are ready for dispatching to a work center. The processing times, date job recuived, and due dales for the jobs a ranked according lo the decision rukes given below whal sequence would the jobs b Sequence Job Date Job Processing (days) Job Received D 105 122 195 20 180 120 205 25 I times d daysloday...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT