Question

2. Prepare a project schedule for Infotech software company. Assign the relevant resource Name and project Starts Calculate t
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Infotech software development company develops software in a linear function. Now we have to calculate the total duration of project which starts on 5/7/2019.

Here we have given the duration for the completion of all subtask.

1)time taken in software requirements specification-

= time for( requirement gathering +data collection +cost analysis +risk analysis)

=1+3+2+2=8 days

2)time taken in system design-=time for(database design +detailed design +architecture design)

=3+2+2=7days

3) time taken for development and testing =time for( code development +module specification +module testing + white box testing +black box testing +security testing)

=2+3+4+2+1+2=14days

4) maintenance and installation =time for (install the new software +check the constraints +update and install the application)

=1+1+1=3 day

thus total duration =32days

Add a comment
Know the answer?
Add Answer to:
2. Prepare a project schedule for Infotech software company. Assign the relevant resource Name and project...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • write a software or business system that has one topic in each categorie 1. Software Development Mode Waterfall Model Evolutionary Model Boehm's Spiral Model 2. Team Structure Democratic T...

    write a software or business system that has one topic in each categorie 1. Software Development Mode Waterfall Model Evolutionary Model Boehm's Spiral Model 2. Team Structure Democratic Team Chief Programmer Team Hierarchical Team 3. Project Evaluation in terms of: Individual Ability . Team Communication Product Complexity . Appropriate Notation . Level of Technology Level of Reliability Available Time . Required Skills 4. Cost Estimation using COCOMO Use Effort Multipliers Perform Sensitivity Analysis Calculate FSP(Fulltime Software Personnel) - . ....

  • Your Assignment is to Create a Project Schedule in MS Project. You are to Create a...

    Your Assignment is to Create a Project Schedule in MS Project. You are to Create a Project Schedule using the durations, including Predecessors and Names on each activity Amir’s Sheds is a successful franchise in the home building industry. Amir’s Sheds build specific purpose sheds for home gardens, farms and industrial storage facilities. The project starts on Monday, June 3, 2019 WBS for Building a Shed Task ID Task Description Predecessor Time Resources (people and materials required to complete the...

  • About software project management Q2. Consider the following milestone table, what is the milestone trend chart...

    About software project management Q2. Consider the following milestone table, what is the milestone trend chart that the following project follows? Name and draw the milestone trend chart. Milestone Expected Delivery Actual delivery 1st month equirement Phase 2nd month 3rd month 4th month 5th month 6th month 7th month Installation/Training 8th montlh early 1 week time carly1 weck early 1 week early 2 weeks early 2 weeks early 2 weeks early 3 weeks Project Planning Analysis phase Design phase Coding...

  • 2. Using the information in Table 1, assuming that the project team will work a standard...

    2. Using the information in Table 1, assuming that the project team will work a standard working week (5 working days in 1 week) and that all tasks will start as soon as possible: Table 1: Project description Task Description Predecessor/s Duration (working days) 5 15 25 15 A B A B с D E F G H Requirement Analysis Systems Design Programming Telecoms Hardware Installation Integration System Testing Training/Support Handover and Go-Live B B 30 CD E, F 10...

  • Listed below are the first 2 steps of the software life cycle. Describe what happens during...

    Listed below are the first 2 steps of the software life cycle. Describe what happens during each phase. 1. Analysis and specification of the task 2. Design of the software Listed below are the third and fourth steps of the software life cycle. Describe what happens during each phase. 3. Implementation 4. Testing Listed below are the last 2 steps of the software life cycle. Describe what happens during each phase. 5. Maintenance and evolution of the system 6. Obsolescence

  • Project management Zeus Project-A You are Donald Tuck, the project manager in charge of the Zeus...

    Project management Zeus Project-A You are Donald Tuck, the project manager in charge of the Zeus project. Zeus was the code name given to the development of a virtual electronic medical reference guide. Zeus would be designed for emergency medical technicians and paramedics who need a quick reference guide to use in emergency situations, even in offline mode. Donald and his project team were developing a project plan aimed at producing 30 working models in time for InterMedCON 2018, the...

  • Database Analysis and Design (ER diagram) After the requirement collection and analysis phase the software project...

    Database Analysis and Design (ER diagram) After the requirement collection and analysis phase the software project of a database application about a company is described as follows: 1. The company is organized into departments. Each department has a name, an unique number, and a particular employee who manages the department. We keep track of the start date when the employee began managing the dept. A dept may have several locations. 2. A dept controls several projects, each of which has...

  • Matching: What are 4 fundamental activities in software processes? definition of the software function and operational...

    Matching: What are 4 fundamental activities in software processes? definition of the software function and operational constraints Answer 1Choose...software developmentsoftware evolutionsoftware specificationsoftware validation software is modified to reflect changing customer / market needs Answer 2Choose...software developmentsoftware evolutionsoftware specificationsoftware validation design and implementation of the software code Answer 3Choose...software developmentsoftware evolutionsoftware specificationsoftware validation process of ensuring the software meets the customer's requirements Answer 4Choose...software developmentsoftware evolutionsoftware specificationsoftware validation Please answer all parts of the question. Question 2 Answer saved Marked out...

  • Microsoft Project Assignment Description A system development project has been defined to contain the following list of...

    Microsoft Project Assignment Description A system development project has been defined to contain the following list of activities along with their estimated times for completion. The project will start on 5/1/2019. Project Data Provided: Activity ID Activity Name Days Predecessors Optimistic(O) Realistic(R) Pessimistic(P) 1 Gather Requirement 1 2 3 2 Analyze processes 1 2 6 1 3 Define DFDs 0.5 1 1.5 2 4 Design Processes 2 7 12 2 5 Design database 4 7 22 3 6 Design UI...

  • QUESTION 1 _________ feasibility determines whether the company can develop or otherwise acquire the hardware, software,...

    QUESTION 1 _________ feasibility determines whether the company can develop or otherwise acquire the hardware, software, and communications components needed to solve the business problem. Behavioral Competitive Economic Technical 0.5 points    QUESTION 2 The _________ identifies the firm's overall mission, the goals that follow from that mission, and the broad steps required to reach these goals. IS operational plan IS strategic plan IT architecture Organization strategic plan 0.5 points    QUESTION 3 The _________ consists of a clear set...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT