Create a Gantt Chart for the following project, and show the Gantt Chart below. Set a start date of January 6, 2020. Assume that work can be done 5 days per week. Identify the Critical Path. When will the project be completed?
Project will compete on 11/06/2020 because
Task number 1 is complete on 31/01/2020
Task number 2 is complete on the 12/02/2020
Task number 3 is complete on 05/03/2020
Task number 4 complete on 02/04/2020
Task number 5 complete on 16/04/2020
Task number 6 is complete on 11/06/2020
Create a Gantt Chart for the following project, and show the Gantt Chart below. Set a...
ASSIGNMENT- Scheduling a. Draw the EARLY start Gantt chart and state the critical activities b. Draw the LATE start Gantt chart c. Draw the AON chart - Forward pass d. Draw the AON chart - Backward pass e. Identify the critical path from the table (follow ppt/notes) MUST BE DONE NEATLY! ACTIVITY WEEKS PRECEDENCE A B с D E F 3 4 5 7 2 4 3 A B B E C,D GF H
Chapter - Project Management This assignment involves creating a Gantt chart using the GanttProject software. 1) Use the attached example task list to create a new Gantt chart. Make sure you indicate the task dependencies from the task list. Use the IDs assigned by the site, not the ones in the example. 2) Add two new tasks: the 1st between "Programming" and "Program Test" called "Code Review" with duration 3 days, and the 2nd between “Write User Manual” and “User...
Given the following information about a small project, Task Duration Immediate Estimates Predecessors A 2 days None B 5 days A C 4 days B D 9 days A E 4 days B & D F 12 days E & C Draw a network diagram. Identify the critical path, earliest start and finish and slack for each task. Using MS Excel, produce a Gantt chart for this project. What would happen if a new estimate for task D increases...
Please draw the Gantt chart for the project. Use different color for critical path activities and non-critical path activities. Use arrows to indicate the slack time on the Gantt chart. (1 point) Note: if you use Excel or other graphical tools to create the Gantt chart, you may submit the files separately. YOUR SCORE: TOTAL POINTS: 5 Question (a), (b) and (e) are related to Lecture 17. Questions (c) and (d) are related to Lecture 18 The activity information and...
please answer this problem Answer all questions Consider a project consisting of 12 activities and their duration along with precedence as follows: Activity Precedence Duration (Days) B,C D,F.H IJ 10 5 marks Questionl Analyze the critical path to determine the total duration for the completion of the project Question2: Compute slack time for each task and analyze the appropriateness of the slack time and its usage in the process [5 marks] [5 marks Question3: Determine appropriate technological solution for the...
Please help with this civil engineering problem! I promise I'll rate your answer! Question 6 Gantt Chart (20 points) Develop the Gantt chart for the following network diagram. Indicate in the Gantt chart the total float value for each activity that is not part of the critical path by marking the corresponding cells of an activity with dash marks “ “ ESD Duration EFD Activity Name LSD| Float LFD 213 3 2 5 5 2 7 13 10 15 15...
This project aims to develop an online bookstore system that acts as a central database containing various books in stock along with their title, author’s name, published date, and cost. This project, basically a website, will get a large amount of online visitors. The system should be hosted on a cloud platform in order to avoid site crash. The project can be developed using Java (front end support) and SQL (back end support). The online bookstore stores various book related...
. Construct a Gantt chart and project network for the following set of activities, compute the length of each path in the network, and indicate the critical path: Activity Activity Predecessor Time (months) 1 ___ 4 2 ___ 7 3 1 8 4 1 3 5 2 9 6 3 5 7 3 2 8 4,5,6 6 9 2 5
Given the following construction project tasks and estimated durations: • Prepare foundation (3 days). • Assemble building (5 days). • Once the building is assembled, start the next two tasks at once: interior work (5 days) and landscaping (5 days). • Once the interior work is done, do the painting (2 days). • Once the landscaping is done, pave the driveway (1 day) • Once all tasks are completed, conduct the final inspection (1 day). Prepare a PERT/CPM chart for...
Microsoft Project Assignment Description A system development project has been defined to contain the following list of activities along with their estimated times for completion. The project will start on 5/1/2019. Project Data Provided: Activity ID Activity Name Days Predecessors Optimistic(O) Realistic(R) Pessimistic(P) 1 Gather Requirement 1 2 3 2 Analyze processes 1 2 6 1 3 Define DFDs 0.5 1 1.5 2 4 Design Processes 2 7 12 2 5 Design database 4 7 22 3 6 Design UI...