The Kiwi-99 is assembled by QGI with parts supplied by different vendors. Each Kiwi-99 has a lead time of 3 weeks and the Bill of Material consists of the following 3 assemblies:
1) Gimbal Set: 1 per gyroscope lead time is 2 weeks
2) Rotor Set: 1 per gyroscope lead time is 1 week
3) Base: 1 per gyroscope lead time is 3 weeks
Consider the four product trees shown below.
Which of the four product trees is correct for the Kiwi-99 gyroscope?
Select the best answer
1) Product Tree A
2) Product Tree B
3) Product Tree C
4) Product Tree D
5) None of the above
Answer : Correct Option B : Product Tree B
Product Tree B is correct because it meets al the requirements mentioned inthe question.
The Kiwi-99 is assembled by QGI with parts supplied by different vendors. Each Kiwi-99 has a...
Prince Electronics, a manufacturer of consumer electronic goods, has five distribution centers in different regions of the country. For one of its products, a highspeed modem priced at $370 per unit, the average weekly demand at each distribution center is 85 units. Average shipment size to each distribution center is 350 units, and average lead time for delivery is 3 weeks. Each distribution center carries 3 weeks' supply as safety stock but holds no anticipation inventory. a. On average, how...
Prince Electronics, a manufacturer of consumer electronic goods, has five distribution centers in different regions of the country. For one of its products, a highspeed modem priced at $330 per unit, the average weekly demand at each distribution center is 85 units. Average shipment size to each distribution center is 450 units, and average lead time for delivery is 3 weeks. Each distribution center carries 3 weeks' supply as safety stock but holds no anticipation inventory. a. On average, how...
just question 5.b
5. The Holix Corporation has two separate processing centers for credit applications. Each credit application passes through three steps: step 1-background credit check, step 2 - credit risk profile analysis, and step 3—credit level approval and communication to client. The processing time for each of the stages is 20 minutes for credit check, 50 minutes for credit risk profile analysis, and 14 minutes for credit approval and communication. The set-up time between successive applications for each step...
Product XYZ is described as follows: Quantity of each assembly/component is in (brackets) XYZ are made up of assemblies A(3), B, & C(2) Assembly A contains D(2), E(2), & F(3) Assembly B contains part H(2) Assembly C contains parts G(2) & E(2) Inventory Lead- time and Lot Size Information: XYZABCDEFGHLead Time121112222Projected On Hand93125329252039160012568Lot SizeLFLLFL2010LFL10020010050Scheduled Receipts500000001000Safety Stock 105025 **Note** all scheduled receipts are in week 1 Create a product structure tree (Multilevel BOM): (5 marks) Using Blank MRP sheets, Create a level loaded (discreet, with no remnants) plan ...
One unit of A is made of one unit of B and one unit of C. B is
made of four units of C and one unit each of E and F. C is made of
two units of D and one unit of E. E is made of three units of F.
Item C has a lead time of one week; Items A, B, E, and F have
two-week lead times; and Item D has a lead time of...
Step by step solutions please.
PHYS 272 Problem Set 2, Turn-in Part Please provide one page per problem and ensure that your name is written on the top of each page. Otherwise, both problems may not be graded Problem 1 In the figure shown below, a solid sphere of radius a- 3.90 cm is concentric with a spherical conducting shell of inner radius b = 2.00a and outer radius c = 2.40a. The sphere has a net uniform charge qi...
There are two (2) Parts to this case. The First part (Part 1) requires you to use the information to:1. Build a Bill of Material (BOM) form the given information2. Determine the Master Production Schedule (MPS) and3. Complete the MRP for all parts including the product. The Second Part (Part 2) will require you to use an indexed BOM to 1. Create the correct MPS from the provided information2. create the MRP for the unit and all of its assemblies/components Part 1:...
I need help with the attached assignment. I attached the
question and completed assigment. I just need help with answering
one more question which is which is:
Discuss a strategy that you would use to communicate the status
of the project to stakeholders?
Project Monitoring and Control Assignment Complete the following items for this assignment: 1. Read through the Case 13.1 Tree Trimming Project Case in Larson and Gray. Respond to Questions 1 and 2 of the case. Use Microsoft...
One unit of A is made of one unit of B and one unit of C. B is made of four units of C and one unit each of E and F. C is made of two units of D and one unit of E. E is made of three units of F. Item C has a lead time of one week; Items A, B, E, and F have two-week lead times; and Item D has a lead time of...
Case #2 MGT2315 There are two (2) Parts to this case. The First part (Part 1) requires you to use the information to:1. Build a Bill of Material (BOM) form the given information2. Determine the Master Production Schedule (MPS) and3. Complete the MRP for all parts including the product. The Second Part (Part 2) will require you to use an indexed BOM to 1. Create the correct MPS from the provided information2. create the MRP for the unit and all of...