What are the equipments used for the water treatment plant (filter building) in the construction site...

What are the equipments used for the water treatment plant (filter building) in the construction site to build the filter building?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

these equipment are used for water treatment plant (filter building)

1) clarifiers

2) FILTERS

3) trash rakes

4) sludge dryers

5) degasifiers

Add a comment
Know the answer?
Add Answer to:
What are the equipments used for the water treatment plant (filter building) in the construction site...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A 50-mgpd (million gallons per day) water treatment plant was proposed in 2017 for Ureka. A...

    A 50-mgpd (million gallons per day) water treatment plant was proposed in 2017 for Ureka. A 60- mgpd plant using the same treatment process was built in 2010 in Vancouver for $50,000,000. Given the following additional information and assumptions: Poor site condition in Vancouver required an additional $3,000,000 for foundations, which is not anticipated for Ureka. Assume the power sizing size exponent = 0.67. Assume inflation will persist at an average 5% per annum. Assume the location index for Vancouver...

  • You are assigned to operate a drinking water treatment plant which has a capacity of 280...

    You are assigned to operate a drinking water treatment plant which has a capacity of 280 ML per day. If 5% of total raw water influent was used for filter backwashing without recycling and another 5% was lost due to sludge discharge and chlorine needs to be dosed is at 1 mg L-1 for the water after treatment, calculate the mass of chlorine that needs to be dosed each day at the treatment plant.

  • A model town with a population of 100000 people has a drinking water treatment plant. As...

    A model town with a population of 100000 people has a drinking water treatment plant. As an engineer, you are asked to design a sand filter system for the town. Determining: a) the total area of the filter, b) how many filter cells are needed if each filter cell has an area of 30 m2, c) depth of the sand, d) filtration rate, e) backwash rate if a rotary-jet-type surface wash is used, and f) the quantity of treated water...

  • ( Water & Westwater Treatment Curse ) b) Design of a Sand Filter A 1) Design...

    ( Water & Westwater Treatment Curse ) b) Design of a Sand Filter A 1) Design a new sand filter for a small operation. The est rate for this site is 1880 m/day. The surface overflow ra exceed 145 m3/m2/d. What will be the surface area of the f can use some leftover Ottawa sand (dzo - 0.00055m) from your filtration project. How deep should the filter be? (C3) (5) te shod You 2) The filter unit can remove 70%ofturbidity...

  • What are major differences between water treatment and waste water treatment plant? What is Short-Circuiting? Describe...

    What are major differences between water treatment and waste water treatment plant? What is Short-Circuiting? Describe three Classifications of wastewater! What is Comminutor? What is activated sludge system? Describe it.

  • in construction site of skyscraper, electric motor rated 50 horsepower at 1160rpm is used to elevate...

    in construction site of skyscraper, electric motor rated 50 horsepower at 1160rpm is used to elevate the slurry bucket to 15th floor of the under construction building. this elevator operates 12 hour daily at approximately 675 rpm. select a v belt drive for the given conditions so that it can operate smoothly throughout the construction of building.

  • 1) Wind and Water Energy Company hired Smith Construction Corporation to build a new building for...

    1) Wind and Water Energy Company hired Smith Construction Corporation to build a new building for its operation. Smith agreed to build the plant for $1,200,000, and Wind and Water Energy agreed to pay Smith $300,000 on January 1 and July 1 for two years, beginning July, 2006. Smith estimates that it will incur total costs of $950,000 to complete construction. The following details at December 31, 2006: Costs incurred to date $400,000   Estimated costs to complete     550,000 Billings...

  • You are thinking of building a factory. The plant will cost € 100,000 and can be...

    You are thinking of building a factory. The plant will cost € 100,000 and can be used for two years. The factory construction will increase your profits by € 55000 at the end of the first year and by € 60000 at the end of the second year. After the factory it will have no value. What is the net present value of the plant if the interest rate is 10%. Would you be willing to build the factory?

  • :A wastewater treatment plant consisted of a primary sedimentation tank and two stages of trickling filter...

    :A wastewater treatment plant consisted of a primary sedimentation tank and two stages of trickling filter received flow 44L/Sec , the BOD concentration in raw sewage =440 mg/L , 30% BOD removed in the primary sedimentation tank, volume of filter (first stage )=826000L, volume of filter (second stage)=2563000L, recirculation rate =0.5 in second tank while no recirculation in first tank. Determine the following: 1-The effluent concentration of BOD in each unit. 2-Treatment efficiency of each unit. 3-Treatment efficiency of plant....

  • B. A water treatment plant is to process water to a population of 150000 The following data are f...

    b. A water treatment plant is to process water to a population of 150000 The following data are furnished to facilitate the design of the rapid sand filter units Average day demand 300 L/cap.d 24h Assume that the maximum day demand 1.5 times the average Number of filter units Rate of filtration: Length: Maximum lateral travel of washwater not to exceed 1 m Rate of backwash: Desirable sand bed expansion: 40% Washwater tank capacity: to wash two filters for 5...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
Active Questions
ADVERTISEMENT