Problem

Determine the total length of brush aerators for the extended aeration oxidation ditch a...

Determine the total length of brush aerators for the extended aeration oxidation ditch at Pasveer ( Problem 16-28 ). Use the data in Table 16-15 for the length estimate. Use the following assumptions in the design:

Clean water correction, α = 0.50 for nitrification

Salinity correction, β = 0.95

Summer wastewater temperature = 20oC

Operating DO = 3.0 mg/L

Problem 16-28

Estimate the volume of an extended-aeration oxidation ditch for carbonaceous BOD oxidation and nitrification for the city of Pasveer using the following design data:

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search