Determine the total length of brush aerators for the extended aeration oxidation ditch at Pasveer ( Problem 16-28 ). Use the data in Table 16-15 for the length estimate. Use the following assumptions in the design:
Clean water correction, α = 0.50 for nitrification
Salinity correction, β = 0.95
Summer wastewater temperature = 20oC
Operating DO = 3.0 mg/L
Problem 16-28
Estimate the volume of an extended-aeration oxidation ditch for carbonaceous BOD oxidation and nitrification for the city of Pasveer using the following design data:
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.