In continuing the design of the BPR process for Pekin’s new wastewater treatment plant, determine the volume of the anoxic tank. Use the data provided in Problem 16-51.
Problem 16-51
Your firm has been asked do a preliminary study of the feasibility of a new A2/O™ BPR wastewater treatment plant for Pekin. Begin the design of the complete-mix BOD removal and nitrification stage for the plant. As a first step determine the SRT and volume of tank required for nitrification using the following design data:
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.