Check the alkalinity for the BPR wastewater plant being designed for Pittsburgh. Use the data from Problems 16-46 and 16-47. Assume an alkalinity of 100 g/m 3 is needed to maintain a pH of about 7.
Problems 16-47
In continuing the design of the BPR process for Pittsburgh’s new wastewater treatment plant, determine the volume of the anoxic tank. Use the data provided in Problem 16-46 .
Problem 16-46
Your firm has been asked to do a preliminary study of the feasibility of a new A2/O™ BPR wastewater treatment plant for Pittsburgh. Begin the design of the complete-mix BOD removal and nitrification stage. As a first step determine the SRT and volume of tank required for nitrification using the following design data:
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.