Problem

Check the alkalinity for the BPR wastewater plant being designed for Pittsburgh. Use the...

Check the alkalinity for the BPR wastewater plant being designed for Pittsburgh. Use the data from Problems 16-46 and 16-47. Assume an alkalinity of 100 g/m 3 is needed to maintain a pH of about 7.

Problems 16-47

In continuing the design of the BPR process for Pittsburgh’s new wastewater treatment plant, determine the volume of the anoxic tank. Use the data provided in Problem 16-46 .

Problem 16-46

Your firm has been asked to do a preliminary study of the feasibility of a new A2/O BPR wastewater treatment plant for Pittsburgh. Begin the design of the complete-mix BOD removal and nitrification stage. As a first step determine the SRT and volume of tank required for nitrification using the following design data:

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search