As part of a preliminary design, estimate the required blower power for the completemix BOD removal and nitrification stage for Pittsburgh’s new BPR wastewater treatment plant ( Problem 16-46 ). The following estimates have been provided for the design of one of eight basins:
Problem 16-46
Your firm has been asked to do a preliminary study of the feasibility of a new A2/O™ BPR wastewater treatment plant for Pittsburgh. Begin the design of the complete-mix BOD removal and nitrification stage. As a first step determine the SRT and volume of tank required for nitrification using the following design data:
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.