Estimate the effluent phosphorus concentration for Pekin’s new BPR wastewater treatment plant. Use the data and assumptions from Problems 16-51 through 16-53. In addition, assume the following:
Problems 16-53
Check the alkalinity for the BPR wastewater plant being designed for Pekin. Use the data from Problems 16-51 and 16-52. Assume an alkalinity of 150 g/m 3 is needed to maintain a pH of about 7.
Problems 16-52
In continuing the design of the BPR process for Pekin’s new wastewater treatment plant, determine the volume of the anoxic tank. Use the data provided in Problem 16-51.
Problem 16-51
Your firm has been asked do a preliminary study of the feasibility of a new A2/O™ BPR wastewater treatment plant for Pekin. Begin the design of the complete-mix BOD removal and nitrification stage for the plant. As a first step determine the SRT and volume of tank required for nitrification using the following design data:
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution