Problem

Determine the total length of brush aerators for the extended aeration oxidation ditch a...

Determine the total length of brush aerators for the extended aeration oxidation ditch at Brooklyn ( Problems 16-33 , 16-34 , 16-35 ). Use the data in Table 16-15 for the length estimate. Use the following assumptions in the design:

Clean water correction, α = 0.70 for nitrification

Salinity correction, β = 0.95

Summer wastewater temperature = 24oC

Operating DO = 3.0 mg/L

Table 16-15

Problems 16-35

Estimate the mass of sludge to be wasted each day from the extended aeration oxidation ditch at Brooklyn ( Problem 16-33 ).

Problem 16-34

Determine whether or not there is sufficient alkalinity for nitrification of the extended aeration oxidation ditch at Brooklyn ( Problem 16-33 ). Compute the mass per day of sodium bicarbonate to add if alkalinity is required. Assume a residual of 80 mg/L as CaCO3 is required to maintain the pH.

Problem 16-33

Estimate the volume of an extended-aeration oxidation ditch for carbonaceous BOD oxidation and nitrification for the city of Brooklyn using the following design data:

Assume the MLSS = 3,000 mg/L, MLVSS = (0.75) MLSS, and typical kinetic coefficients in Tables 16-14 and 16-5 apply.

Tables 16-14 and 16-5

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search